{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,7]],"date-time":"2025-10-07T14:35:56Z","timestamp":1759847756825},"reference-count":10,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2013,5,25]],"date-time":"2013-05-25T00:00:00Z","timestamp":1369440000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2014,2]]},"DOI":"10.1007\/s10951-013-0335-z","type":"journal-article","created":{"date-parts":[[2013,5,24]],"date-time":"2013-05-24T06:08:31Z","timestamp":1369375711000},"page":"95-107","source":"Crossref","is-referenced-by-count":8,"title":["A cutting and scheduling problem in float glass manufacturing"],"prefix":"10.1007","volume":"17","author":[{"given":"Byungsoo","family":"Na","sequence":"first","affiliation":[]},{"given":"Shabbir","family":"Ahmed","sequence":"additional","affiliation":[]},{"given":"George","family":"Nemhauser","sequence":"additional","affiliation":[]},{"given":"Joel","family":"Sokol","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2013,5,25]]},"reference":[{"key":"335_CR1","doi-asserted-by":"crossref","first-page":"141","DOI":"10.1016\/0098-1354(89)89014-3","volume":"13","author":"DB Birewar","year":"1989","unstructured":"Birewar, D. B., & Grossmann, I. E. (1989). Incorporating scheduling in the optimal design of multiproduct batch plants. Computers and Chemical Engineering, 13, 141\u2013161.","journal-title":"Computers and Chemical Engineering"},{"key":"335_CR2","doi-asserted-by":"crossref","first-page":"1333","DOI":"10.1021\/ie00093a010","volume":"28","author":"DB Birewar","year":"1989","unstructured":"Birewar, D. B., & Grossmann, I. E. (1989). Efficient optimization algorithms for zero-wait scheduling of multiproduct batch plants. Industrial and Engineering Chemistry Research, 28, 1333\u20131345.","journal-title":"Industrial and Engineering Chemistry Research"},{"key":"335_CR3","volume-title":"Computers and Intractability: A guide to the theory of NP-completeness","author":"MR Garey","year":"1979","unstructured":"Garey, M. R., & Johnson, D. S. (1979). Computers and Intractability: A guide to the theory of NP-completeness. New York: W.H. Freeman and Co."},{"key":"335_CR4","first-page":"263","volume":"17","author":"RL Graham","year":"1969","unstructured":"Graham, R. L. (1969). Bounds on multiprocessing timing anomalies. SIAM Journal of Applied Mathematics, 17, 263\u2013269.","journal-title":"SIAM Journal of Applied Mathematics"},{"key":"335_CR5","doi-asserted-by":"crossref","first-page":"1489","DOI":"10.1080\/00207549108948025","volume":"29","author":"JND Gupta","year":"1991","unstructured":"Gupta, J. N. D., & Tunc, E. A. (1991). Schedules for a two stage hybrid flowshop with parallel machines at the second stage. International Jouranal of Production Research, 29, 1489\u20131502.","journal-title":"International Jouranal of Production Research"},{"key":"335_CR6","doi-asserted-by":"crossref","first-page":"57","DOI":"10.1016\/S0360-8352(99)00023-6","volume":"37","author":"R Linn","year":"1999","unstructured":"Linn, R., & Zhang, W. (1999). Hybrid flow shop scheduling: A survey. Computers and Industrial Engineering, 37, 57\u201361.","journal-title":"Computers and Industrial Engineering"},{"key":"335_CR7","doi-asserted-by":"crossref","first-page":"925","DOI":"10.1287\/opre.37.6.925","volume":"37","author":"ST McCormick","year":"1989","unstructured":"McCormick, S. T., Pinedo, M. L., Shenker, S., & Wolf, B. (1989). Sequencing in an assembly line with blocking to minimize cycle time. Operations Research, 37, 925\u2013935.","journal-title":"Operations Research"},{"key":"335_CR8","doi-asserted-by":"crossref","unstructured":"Na, B., Ahmed, S., Nemhauser, G.L., & Sokol, J. (2013). Optimization of automated float glass lines. International Journal of Production Economics (to appear).","DOI":"10.1016\/j.ijpe.2013.04.024"},{"key":"335_CR9","unstructured":"Pinedo, M. L. (2008). Scheduling: Theory, algorithms, and systems (3rd ed.). New York: Springer."},{"key":"335_CR10","doi-asserted-by":"crossref","first-page":"365","DOI":"10.1016\/0377-2217(93)90248-L","volume":"70","author":"C Sriskandarajah","year":"1993","unstructured":"Sriskandarajah, C. (1993). Performance of scheduling algorithms for no-wait flowshops with parallel machines. European Journal of Operational Research, 70, 365\u2013378.","journal-title":"European Journal of Operational Research"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-013-0335-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-013-0335-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-013-0335-z","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T05:39:48Z","timestamp":1559453988000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-013-0335-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,5,25]]},"references-count":10,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2014,2]]}},"alternative-id":["335"],"URL":"https:\/\/doi.org\/10.1007\/s10951-013-0335-z","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,5,25]]}}}