{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,28]],"date-time":"2026-02-28T10:59:01Z","timestamp":1772276341028,"version":"3.50.1"},"reference-count":22,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2013,7,25]],"date-time":"2013-07-25T00:00:00Z","timestamp":1374710400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2014,2]]},"DOI":"10.1007\/s10951-013-0340-2","type":"journal-article","created":{"date-parts":[[2013,7,24]],"date-time":"2013-07-24T14:11:08Z","timestamp":1374675068000},"page":"17-29","source":"Crossref","is-referenced-by-count":17,"title":["A bicriteria two-machine flow-shop serial-batching scheduling problem with bounded batch size"],"prefix":"10.1007","volume":"17","author":[{"given":"M. A.","family":"Aloulou","sequence":"first","affiliation":[]},{"given":"A.","family":"Bouzaiene","sequence":"additional","affiliation":[]},{"given":"N.","family":"Dridi","sequence":"additional","affiliation":[]},{"given":"D.","family":"Vanderpooten","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2013,7,25]]},"reference":[{"issue":"3","key":"340_CR1","doi-asserted-by":"crossref","first-page":"985","DOI":"10.1016\/j.ejor.2006.06.060","volume":"187","author":"A Allahverdi","year":"2008","unstructured":"Allahverdi, A., Ng, C., Cheng, T., & Kovalyov, M. (2008). A survey of scheduling problems with setup times or costs. European Journal of Operational Research, 187(3), 985\u20131032.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"340_CR2","doi-asserted-by":"crossref","first-page":"314","DOI":"10.1016\/j.ejor.2004.04.004","volume":"165","author":"C Artigues","year":"2005","unstructured":"Artigues, C., Billaut, J. C., & Esswein, C. (2005). Maximization of solution flexibility for robust shop scheduling. European Journal of Operational Research, 165(2), 314\u2013328.","journal-title":"European Journal of Operational Research"},{"key":"340_CR3","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1023\/B:ANOR.0000030683.64615.c8","volume":"129","author":"P Brucker","year":"2004","unstructured":"Brucker, P., Knust, S., Cheng, T., & Shakhlevich, N. (2004). Complexity results for flow-shop and open shop scheduling problems with transportation delays. Annals of Operations Research, 129, 81\u2013106.","journal-title":"Annals of Operations Research"},{"key":"340_CR4","doi-asserted-by":"crossref","first-page":"130","DOI":"10.1287\/opre.1080.0688","volume":"58","author":"ZL Chen","year":"2010","unstructured":"Chen, Z. L. (2010). Integrated production and outbound distribution scheduling: Review and extensions. Operations Research, 58, 130\u2013148.","journal-title":"Operations Research"},{"key":"340_CR5","doi-asserted-by":"crossref","first-page":"891","DOI":"10.1287\/opre.44.6.891","volume":"44","author":"B Chen","year":"1996","unstructured":"Chen, B., Glass, C. A., Potts, C. N., & Strusevich, V. A. (1996). A new heuristic for three-machine flow shop scheduling. Operations Research, 44, 891\u2013898.","journal-title":"Operations Research"},{"key":"340_CR6","first-page":"413","volume":"13","author":"T Cheng","year":"2001","unstructured":"Cheng, T., & Kovalyov, M. (2001). Single machine batch scheduling with sequential processing. IIE Transactions, 13, 413\u2013420.","journal-title":"IIE Transactions"},{"key":"340_CR7","doi-asserted-by":"crossref","first-page":"447","DOI":"10.1080\/07408179808966485","volume":"30","author":"T Cheng","year":"1998","unstructured":"Cheng, T., & Wang, G. (1998). Batching and scheduling to minimize the makespan in the two-machine flowshop. IIE Transactions, 30, 447\u2013453.","journal-title":"IIE Transactions"},{"key":"340_CR8","first-page":"32-1","volume-title":"Handbook of approximation algorithms and metaheuristics","author":"EG Coffman","year":"2007","unstructured":"Coffman, E. G., & Csirik, J. (2007). Performance guarantees for one-dimensional bin packing. In T. F. Gonzalez (Ed.), Handbook of approximation algorithms and metaheuristics (pp. 32-1\u201332-18). Boca Raton: Chappman and Hall."},{"key":"340_CR9","doi-asserted-by":"crossref","first-page":"796","DOI":"10.1016\/j.ejor.2004.01.029","volume":"167","author":"C Esswein","year":"2005","unstructured":"Esswein, C., Billaut, J. C., & Strusevich, V. (2005). Two machine shop scheduling: Compromise between flexibility and makespan value. European Journal of Operational Research, 167, 796\u2013809.","journal-title":"European Journal of Operational Research"},{"key":"340_CR10","unstructured":"Garey, M., & Johnson, D. (1979). Computers and intractability: A guide to the theory of NP-completeness. New York: W.H. Freeman."},{"key":"340_CR11","doi-asserted-by":"crossref","first-page":"117","DOI":"10.1287\/moor.1.2.117","volume":"1","author":"MR Garey","year":"1976","unstructured":"Garey, M. R., Johnson, D. S., & Sethi, R. (1976). The complexity of flowshop and jobshop scheduling. Mathematics of Operations Research, 1, 117\u2013129.","journal-title":"Mathematics of Operations Research"},{"issue":"2","key":"340_CR12","doi-asserted-by":"crossref","first-page":"120","DOI":"10.1287\/ijoc.13.2.120.10521","volume":"13","author":"C Glass","year":"2001","unstructured":"Glass, C., Potts, C., & Strusevich, V. (2001). Scheduling batches with sequential job processing for two-machine flow and open shops. INFORMS Journal on Computing, 13(2), 120\u2013137.","journal-title":"INFORMS Journal on Computing"},{"key":"340_CR13","first-page":"287","volume-title":"Discrete optimization II, annals of discrete mathematics","author":"R Graham","year":"1979","unstructured":"Graham, R., Lawler, E., Lenstra, J., & Rinnooy Kan, A. (1979). Optimization and approximation in deterministic sequencing and scheduling: A survey. In E. J. PL Hammer & B. Korte (Eds.), Discrete optimization II, annals of discrete mathematics (Vol. 5, pp. 287\u2013326). North-Holland: Elsevier."},{"key":"340_CR14","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1002\/nav.3800010110","volume":"1","author":"S Johnson","year":"1954","unstructured":"Johnson, S. (1954). Optimal two- and three-stage production schedules with set-up times included. Naval Research Logistics Quarterly, 1, 61\u201368.","journal-title":"Naval Research Logistics Quarterly"},{"issue":"1","key":"340_CR15","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1002\/1099-1425(200101\/02)4:1<3::AID-JOS57>3.0.CO;2-D","volume":"4","author":"CY Lee","year":"2001","unstructured":"Lee, C. Y., & Chen, Z. L. (2001). Machine scheduling with transportation considerations. Journal of Scheduling, 4(1), 3\u201324.","journal-title":"Journal of Scheduling"},{"issue":"8","key":"340_CR16","doi-asserted-by":"crossref","first-page":"725","DOI":"10.1080\/07408170590918290","volume":"37","author":"CY Lee","year":"2005","unstructured":"Lee, C. Y., & Strusevich, V. A. (2005). Two-machine shop scheduling with an uncapacitated interstage transporter. IIE Transactions, 37(8), 725\u2013736.","journal-title":"IIE Transactions"},{"key":"340_CR17","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1007\/s10479-004-5029-7","volume":"133","author":"B Lin","year":"2005","unstructured":"Lin, B., & Cheng, T. (2005). Two-machine flowshop batching and scheduling. Annals of Operations Research, 133, 149\u2013161.","journal-title":"Annals of Operations Research"},{"key":"340_CR18","doi-asserted-by":"crossref","unstructured":"Merdan, M., Moser, T., Wahyudin, D., Biffl, S. (2008). Performance evaluation of workflow scheduling strategies considering transportation times and conveyor failures. Proceedings of IEEE International Conference on Industrial Engineering and, Engineering Management (pp. 389\u2013394).","DOI":"10.1109\/IEEM.2008.4737897"},{"key":"340_CR19","doi-asserted-by":"crossref","first-page":"228","DOI":"10.1016\/S0377-2217(99)00153-8","volume":"120","author":"C Potts","year":"2000","unstructured":"Potts, C., & Kovalyov, M. (2000). Scheduling with batching: A review. European Journal of Operational Research, 120, 228\u2013249.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"340_CR20","doi-asserted-by":"crossref","first-page":"1187","DOI":"10.1016\/j.apm.2008.01.013","volume":"33","author":"L Tang","year":"2009","unstructured":"Tang, L., & Liu, P. (2009). Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration. Applied Mathematical Modelling, 33(2), 1187\u20131199.","journal-title":"Applied Mathematical Modelling"},{"issue":"4","key":"340_CR21","doi-asserted-by":"crossref","first-page":"692","DOI":"10.1287\/opre.43.4.692","volume":"43","author":"S Webster","year":"1995","unstructured":"Webster, S., & Baker, K. (1995). Scheduling groups of jobs on a single machine. Operations Research, 43(4), 692\u2013703.","journal-title":"Operations Research"},{"issue":"2","key":"340_CR22","doi-asserted-by":"crossref","first-page":"402","DOI":"10.1016\/j.ijpe.2004.04.014","volume":"105","author":"J Yuan","year":"2007","unstructured":"Yuan, J., Lin, Y., Cheng, T., & Ng, C. (2007). Single machine serial-batching scheduling problem with a common batch size to minimize total weighted completion time. International Journal of Production Economics, 105(2), 402\u2013406.","journal-title":"International Journal of Production Economics"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-013-0340-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-013-0340-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-013-0340-2","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,7,19]],"date-time":"2019-07-19T04:05:12Z","timestamp":1563509112000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-013-0340-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,7,25]]},"references-count":22,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2014,2]]}},"alternative-id":["340"],"URL":"https:\/\/doi.org\/10.1007\/s10951-013-0340-2","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,7,25]]}}}