{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,31]],"date-time":"2025-12-31T12:22:10Z","timestamp":1767183730638},"reference-count":27,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2013,8,8]],"date-time":"2013-08-08T00:00:00Z","timestamp":1375920000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2014,4]]},"DOI":"10.1007\/s10951-013-0343-z","type":"journal-article","created":{"date-parts":[[2013,8,7]],"date-time":"2013-08-07T01:28:22Z","timestamp":1375838902000},"page":"199-210","source":"Crossref","is-referenced-by-count":14,"title":["The optimal number of used machines in a two-stage flexible flowshop scheduling problem"],"prefix":"10.1007","volume":"17","author":[{"given":"Enrique","family":"Gerstl","sequence":"first","affiliation":[]},{"given":"Gur","family":"Mosheiov","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2013,8,8]]},"reference":[{"key":"343_CR1","doi-asserted-by":"crossref","first-page":"985","DOI":"10.1016\/j.ejor.2006.06.060","volume":"187","author":"A Allahverdi","year":"2008","unstructured":"Allahverdi, A., Ng, C. T., Cheng, T. C. E., & Kovalyov, M. Y. (2008). A survey of scheduling problems with setup times or costs. European Journal of Operational Research, 187, 985\u20131032.","journal-title":"European Journal of Operational Research"},{"key":"343_CR2","doi-asserted-by":"crossref","first-page":"1995","DOI":"10.1016\/j.cor.2004.01.001","volume":"32","author":"D Cao","year":"2005","unstructured":"Cao, D., Chen, M., & Wan, G. (2005). Parallel machine selection and job scheduling to minimize machine cost and job tardiness. Computers & Operations Research, 32, 1995\u20132012.","journal-title":"Computers & Operations Research"},{"key":"343_CR3","doi-asserted-by":"crossref","first-page":"1171","DOI":"10.1080\/07408170801975057","volume":"40","author":"ZL Chen","year":"2008","unstructured":"Chen, Z. L., & Li, C. L. (2008). Scheduling with subcontracting options. IIE Transactions, 40, 1171\u20131184.","journal-title":"IIE Transactions"},{"key":"343_CR4","doi-asserted-by":"crossref","first-page":"53","DOI":"10.1016\/S0925-5273(98)00039-5","volume":"55","author":"TCE Cheng","year":"1998","unstructured":"Cheng, T. C. E., & Kovalyov, M. Y. (1998). An exact algorithm for batching and scheduling two part types in a mixed shop: A technical note. International Journal of Production Economics, 55, 53\u201356.","journal-title":"International Journal of Production Economics"},{"key":"343_CR5","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1080\/07408170490247368","volume":"36","author":"TCE Cheng","year":"2004","unstructured":"Cheng, T. C. E., Kovalyov, M. Y., & Chakhlevich, K. N. (2004). Batching in a two-stage flowshop with dedicated machines in second stage. IIE Transactions, 36, 87\u201393.","journal-title":"IIE Transactions"},{"key":"343_CR6","doi-asserted-by":"crossref","first-page":"3031","DOI":"10.1016\/j.cor.2009.02.001","volume":"36","author":"TCE Cheng","year":"2009","unstructured":"Cheng, T. C. E., Lin, B. M. T., & Tian, Y. (2009). Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times. Computers & Operations Research, 36, 3031\u20133040.","journal-title":"Computers & Operations Research"},{"key":"343_CR7","doi-asserted-by":"crossref","first-page":"63","DOI":"10.1016\/S0925-5273(96)00063-1","volume":"48","author":"CY Ching","year":"1997","unstructured":"Ching, C. Y., Liao, C.-J., & Wu, C. J. (1997). Batching to minimize total production time for two part types. International Journal of Production Economics, 48, 63\u201372.","journal-title":"International Journal of Production Economics"},{"key":"343_CR8","doi-asserted-by":"crossref","first-page":"1745","DOI":"10.1016\/j.cor.2011.10.012","volume":"39","author":"L Fanjul-Peyro","year":"2012","unstructured":"Fanjul-Peyro, L., & Ruiz, R. (2012). Scheduling unrelated parallel machines with optional machines and jobs selection. Computers and Operational Research, 39, 1745\u20131753.","journal-title":"Computers and Operational Research"},{"key":"343_CR9","doi-asserted-by":"crossref","first-page":"702","DOI":"10.1016\/j.ejor.2006.11.050","volume":"199","author":"G Finke","year":"2009","unstructured":"Finke, G., Lemaire, P., Proth, J. M., & Queyranne, M. (2009). Minimizing the number of machines for minimum length schedules. European Journal of Operational Research, 199, 702\u2013705.","journal-title":"European Journal of Operational Research"},{"key":"343_CR10","doi-asserted-by":"crossref","first-page":"117","DOI":"10.1287\/moor.1.2.117","volume":"1","author":"MR Garey","year":"1976","unstructured":"Garey, M. R., Johnson, D. S., & Sethi, R. (1976). The complexity of flowshop and jobshop scheduling. Mathematics of Operations Research, 1, 117\u2013129.","journal-title":"Mathematics of Operations Research"},{"key":"343_CR11","doi-asserted-by":"crossref","first-page":"39","DOI":"10.2478\/v10209-011-0004-y","volume":"37","author":"E Gerstl","year":"2012","unstructured":"Gerstl, E., & Mosheiov, G. (2012). A two-stage flow shop scheduling with a critical machine and batch availability. Foundations of Computing and Decision Sciences, 37, 39\u201356.","journal-title":"Foundations of Computing and Decision Sciences"},{"key":"343_CR12","doi-asserted-by":"crossref","first-page":"36","DOI":"10.1287\/opre.26.1.36","volume":"26","author":"T Gonzalez","year":"1978","unstructured":"Gonzalez, T., & Sahni, S. (1978). Flowshop and Jobshop schedules: Complexity and approximation. Operations Research, 26, 36\u201352.","journal-title":"Operations Research"},{"key":"343_CR13","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1002\/nav.3800010110","volume":"1","author":"SM Johnson","year":"1954","unstructured":"Johnson, S. M. (1954). Optimal two- and three-stage production schedules with setup times included. Naval Research Logistics Quarterly, 1, 61\u201368.","journal-title":"Naval Research Logistics Quarterly"},{"key":"343_CR14","doi-asserted-by":"crossref","first-page":"595","DOI":"10.1016\/j.ejor.2008.10.008","volume":"199","author":"SA Kravchenko","year":"2009","unstructured":"Kravchenko, S. A., & Werner, F. (2009). Minimizing the number of machines for scheduling jobs with equal processing times. European Journal of Operational Research, 199, 595\u2013600.","journal-title":"European Journal of Operational Research"},{"key":"343_CR15","doi-asserted-by":"crossref","first-page":"120","DOI":"10.1016\/S0377-2217(99)00327-6","volume":"127","author":"GJ Kyparisis","year":"2000","unstructured":"Kyparisis, G. J., & Koulamas, C. (2000). Flow shop and open shop scheduling with a critical machine and two operations per job. European Journal of Operational Research, 127, 120\u2013125.","journal-title":"European Journal of Operational Research"},{"key":"343_CR16","doi-asserted-by":"crossref","first-page":"379","DOI":"10.1023\/A:1008009621190","volume":"10","author":"C-Y Lee","year":"1998","unstructured":"Lee, C.-Y., & Vairaktarakis, G. L. (1998). Performance comparison of some classes of flexible flowshops and jobshops. The International Journal of Flexible Manufacturing Systems, 10, 379\u2013405.","journal-title":"The International Journal of Flexible Manufacturing Systems"},{"key":"343_CR17","doi-asserted-by":"crossref","first-page":"695","DOI":"10.1016\/S0305-0548(98)00080-X","volume":"26","author":"BMT Lin","year":"1999","unstructured":"Lin, B. M. T. (1999). The strong NP-hardness of two-stage flowshop scheduling with common second-stage machine. Computers and Operations Research, 26, 695\u2013698.","journal-title":"Computers and Operations Research"},{"key":"343_CR18","doi-asserted-by":"crossref","first-page":"133","DOI":"10.1016\/S0925-5273(03)00011-2","volume":"86","author":"H-T Lin","year":"2003","unstructured":"Lin, H.-T., & Liao, C.-J. (2003). A case study in a two-stage hybrid flow shop with setup time and dedicated machines. International Journal of Production Economics, 86, 133\u2013143.","journal-title":"International Journal of Production Economics"},{"key":"343_CR19","first-page":"789","volume":"37","author":"CL Monma","year":"1989","unstructured":"Monma, C. L., & Potts, C. N. (1989). On the complexity of scheduling with batch setup times. Operations Research, 37, 789\u2013804.","journal-title":"Operations Research"},{"key":"343_CR20","doi-asserted-by":"crossref","first-page":"285","DOI":"10.1016\/j.ejor.2003.09.010","volume":"161","author":"G Mosheiov","year":"2005","unstructured":"Mosheiov, G., & Oron, D. (2005). A note on flow-shop and job-shop batch scheduling with identical processing-time jobs. European Journal of Operational Research, 161, 285\u2013291.","journal-title":"European Journal of Operational Research"},{"key":"343_CR21","doi-asserted-by":"crossref","first-page":"497","DOI":"10.1016\/j.orl.2004.09.007","volume":"33","author":"G Mosheiov","year":"2005","unstructured":"Mosheiov, G., Oron, D., & Ritov, Y. (2005). Minimizing flowtime on a single machine with integer batch sizes. Operations Research Letters, 33, 497\u2013501.","journal-title":"Operations Research Letters"},{"key":"343_CR22","doi-asserted-by":"crossref","first-page":"257","DOI":"10.1016\/S0377-2217(03)00236-4","volume":"157","author":"G Mosheiov","year":"2004","unstructured":"Mosheiov, G., & Yovel, U. (2004). Comments on \u201cFlow shop and open shop scheduling with critical machine and two operations per job\u201d. European Journal of Operational Research, 157, 257\u2013261.","journal-title":"European Journal of Operational Research"},{"key":"343_CR23","doi-asserted-by":"crossref","first-page":"323","DOI":"10.1007\/s10951-005-1640-y","volume":"8","author":"C Oguz","year":"2005","unstructured":"Oguz, C., & Ercan, M. F. (2005). A genetic algorithm for hybrid flow-shop scheduling with multiprocessor tasks. Journal of Scheduling, 8, 323\u2013351.","journal-title":"Journal of Scheduling"},{"key":"343_CR24","doi-asserted-by":"crossref","first-page":"1169","DOI":"10.1016\/S0305-0548(97)00023-3","volume":"24","author":"C Oguz","year":"1997","unstructured":"Oguz, C., Lin, B. M. T., & Cheng, T. C. E. (1997). Two-stage scheduling with a common second-stage machine. Computers and Operations Research, 24, 1169\u20131174.","journal-title":"Computers and Operations Research"},{"key":"343_CR25","doi-asserted-by":"crossref","unstructured":"Raine, F., Artiba, A., & Elmaghraby, S. E. (2002). Sequencing a hybrid two-stage flowshop with dedicated machines. International Journal of Production Research, 40, 4353\u20134380.","DOI":"10.1080\/00207540210159536"},{"key":"343_CR26","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2009.09.024","volume":"205","author":"R Ruiz","year":"2010","unstructured":"Ruiz, R., & Vazquez-Rodriguez, J. A. (2010). The hybrid flow shop scheduling problem. European Journal of Operational Research, 205, 1\u201318.","journal-title":"European Journal of Operational Research"},{"key":"343_CR27","doi-asserted-by":"crossref","first-page":"99","DOI":"10.1016\/0167-6377(85)90011-2","volume":"4","author":"C Santos","year":"1985","unstructured":"Santos, C., & Magazine, M. (1985). Batching in single operation manufacturing systems. Operations Research Letters, 4, 99\u2013103.","journal-title":"Operations Research Letters"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-013-0343-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-013-0343-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-013-0343-z","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T05:39:48Z","timestamp":1559453988000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-013-0343-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,8,8]]},"references-count":27,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2014,4]]}},"alternative-id":["343"],"URL":"https:\/\/doi.org\/10.1007\/s10951-013-0343-z","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,8,8]]}}}