{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,17]],"date-time":"2025-10-17T13:43:22Z","timestamp":1760708602425},"reference-count":39,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2013,8,18]],"date-time":"2013-08-18T00:00:00Z","timestamp":1376784000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2014,4]]},"DOI":"10.1007\/s10951-013-0344-y","type":"journal-article","created":{"date-parts":[[2013,8,17]],"date-time":"2013-08-17T05:10:46Z","timestamp":1376716246000},"page":"145-160","source":"Crossref","is-referenced-by-count":21,"title":["The total adjustment cost problem: Applications, models, and solution algorithms"],"prefix":"10.1007","volume":"17","author":[{"given":"Stefan","family":"Kreter","sequence":"first","affiliation":[]},{"given":"Julia","family":"Rieck","sequence":"additional","affiliation":[]},{"given":"J\u00fcrgen","family":"Zimmermann","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2013,8,18]]},"reference":[{"key":"344_CR1","volume-title":"Construction performance control by networks","author":"HN Ahuja","year":"1976","unstructured":"Ahuja, H. N. (1976). Construction performance control by networks. New York: Wiley."},{"key":"344_CR2","volume-title":"Network flows","author":"R Ahuja","year":"1993","unstructured":"Ahuja, R., Magnanti, T., & Orlin, J. (1993). Network flows. Englewood Cliffs: Prentice Hall."},{"key":"344_CR3","unstructured":"Al-Joma, M. & Mangin, J.-C. (2004). A scheduling model for repetitive activities. In F. Khosrowshahi, (Ed.), Proceedings 20th Annual Association of Researchers in Construction Management (ARCOM) Conference (pp. 1197\u20131206), Edinburgh."},{"issue":"2","key":"344_CR4","first-page":"76","volume":"13","author":"F Ballestin","year":"2007","unstructured":"Ballestin, F., Schwindt, C., & Zimmermann, J. (2007). Resource leveling in make-to-order production: Modeling and heuristic solution method. International Journal of Operations Research, 13(2), 76\u201383.","journal-title":"International Journal of Operations Research"},{"key":"344_CR5","doi-asserted-by":"crossref","first-page":"162","DOI":"10.1016\/0377-2217(94)90380-8","volume":"78","author":"M Bandelloni","year":"1994","unstructured":"Bandelloni, M., Tucci, M., & Rinaldi, R. (1994). Optimal resource leveling using non-serial dynamic programming. European Journal of Operational Research, 78, 162\u2013177.","journal-title":"European Journal of Operational Research"},{"key":"344_CR6","doi-asserted-by":"crossref","first-page":"201","DOI":"10.1007\/BF02283745","volume":"16","author":"M Bartusch","year":"1988","unstructured":"Bartusch, M., M\u00f6hring, R., & Radermacher, F. (1988). Scheduling project networks with resource constraints and time windows. Annals of Operations Research, 16, 201\u2013240.","journal-title":"Annals of Operations Research"},{"key":"344_CR7","volume-title":"Motivation of human potential: Theory and practice","author":"M Blaskova","year":"2009","unstructured":"Blaskova, M., & Grazulis, V. (2009). Motivation of human potential: Theory and practice. Vilnius, Lithuania: Publishing Centre of Mykolas Romeris University."},{"key":"344_CR8","first-page":"76","volume":"13","author":"A Burgess","year":"1962","unstructured":"Burgess, A., & Killebrew, J. (1962). Variation in activity level on a cyclical arrow diagram. Journal of Industrial Engineering, 13, 76\u201383.","journal-title":"Journal of Industrial Engineering"},{"key":"344_CR9","volume-title":"Project scheduling: A research handbook","author":"E Demeulemeester","year":"2002","unstructured":"Demeulemeester, E., & Herroelen, W. (2002). Project scheduling: A research handbook. Boston: Kluwer."},{"key":"344_CR10","doi-asserted-by":"crossref","first-page":"302","DOI":"10.1061\/(ASCE)0733-9364(1989)115:2(302)","volume":"115","author":"SM Easa","year":"1989","unstructured":"Easa, S. M. (1989). Resource leveling in construction by optimization. Journal of Construction Engineering and Management, 115, 302\u2013316.","journal-title":"Journal of Construction Engineering and Management"},{"key":"344_CR11","doi-asserted-by":"crossref","first-page":"107","DOI":"10.1061\/JCCEAZ.0000122","volume":"91","author":"RV Galbreath","year":"1965","unstructured":"Galbreath, R. V. (1965). Computer program for leveling resource usage. Journal of the Construction Division, Proceedings of the American Society of Civil Engineers, 91, 107\u2013124.","journal-title":"Journal of the Construction Division, Proceedings of the American Society of Civil Engineers"},{"issue":"6","key":"344_CR12","doi-asserted-by":"crossref","first-page":"557","DOI":"10.1007\/s10951-010-0207-8","volume":"14","author":"T Gather","year":"2011","unstructured":"Gather, T., Zimmermann, J., & Bartels, J.-H. (2011). Exact methods for the resource levelling problem. Journal of Scheduling, 14(6), 557\u2013569.","journal-title":"Journal of Scheduling"},{"key":"344_CR13","doi-asserted-by":"crossref","first-page":"2300","DOI":"10.1016\/j.camwa.2010.09.058","volume":"61","author":"J Geng","year":"2011","unstructured":"Geng, J., Weng, L., & Liu, S. (2011). An improved ant colony optimization algorithm for nonlinear resource-leveling problems. Computers and Mathematics with Applications, 61, 2300\u20132305.","journal-title":"Computers and Mathematics with Applications"},{"key":"344_CR14","volume-title":"Precedence and arrow networking techniques for construction","author":"RB Harris","year":"1978","unstructured":"Harris, R. B. (1978). Precedence and arrow networking techniques for construction. New York: Wiley."},{"key":"344_CR15","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1061\/(ASCE)0733-9364(1990)116:2(199)","volume":"116","author":"RB Harris","year":"1990","unstructured":"Harris, R. B. (1990). Packing method for resource leveling (Pack). Journal of Construction Engineering and Management, 116, 39\u201343.","journal-title":"Journal of Construction Engineering and Management"},{"key":"344_CR16","doi-asserted-by":"crossref","first-page":"269","DOI":"10.1061\/(ASCE)0733-9364(1998)124:4(269)","volume":"124","author":"RB Harris","year":"1998","unstructured":"Harris, R. B., & Ioannou, P. G. (1998). Scheduling projects with repeating activities. Journal of Construction Engineering and Management, 124, 269\u2013279.","journal-title":"Journal of Construction Engineering and Management"},{"key":"344_CR17","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2009.11.005","volume":"207","author":"S Hartmann","year":"2010","unstructured":"Hartmann, S., & Briskorn, D. (2010). A survey of variants and extensions of the resource-constrained project scheduling problem. European Journal of Operational Research, 207, 1\u201314.","journal-title":"European Journal of Operational Research"},{"key":"344_CR18","first-page":"167","volume-title":"Netzintegration von Offshore-Gro\u00dfwindanlagen: Grundlast von der Nordsee","author":"H-J Haubrich","year":"2008","unstructured":"Haubrich, H.-J., Siemes, P., & Ohrem, S. (2008). M\u00f6glichkeiten der Netzintegration von Offshore-Gro\u00dfwindanlagen. In P. Dietz (Ed.), Netzintegration von Offshore-Gro\u00dfwindanlagen: Grundlast von der Nordsee (pp. 167\u2013177). Clausthal-Zellerfeld: Papierflieger."},{"key":"344_CR19","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/j.cor.2009.12.011","volume":"38","author":"O Kon\u00e9","year":"2011","unstructured":"Kon\u00e9, O., Artigues, C., Lopez, P., & Mongeau, M. (2011). Event-based MILP models for resource-constrained project scheduling problems. Computers and Operations Research, 38, 3\u201313.","journal-title":"Computers and Operations Research"},{"key":"344_CR20","unstructured":"Moder, J. J., & Phillips, C. R. (1970). Project Management with CPM and PERT (2nd ed.). New York: Van Nostrand Reinhold Company."},{"key":"344_CR21","doi-asserted-by":"crossref","first-page":"325","DOI":"10.1016\/S0377-2217(02)00765-8","volume":"149","author":"K Neumann","year":"2003","unstructured":"Neumann, K., Schwindt, C., & Zimmermann, J. (2003a). Order-based neighborhoods for project scheduling with nonregular objective functions. European Journal of Operational Research, 149, 325\u2013343.","journal-title":"European Journal of Operational Research"},{"key":"344_CR22","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-540-24800-2","volume-title":"Project scheduling with time windows and scarce resources","author":"K Neumann","year":"2003","unstructured":"Neumann, K., Schwindt, C., & Zimmermann, J. (2003b). Project scheduling with time windows and scarce resources (2nd ed.). Berlin: Springer.","edition":"2"},{"key":"344_CR23","unstructured":"Neumann, K., Schwindt, C., & Zimmermann, J. (2006). Resource-constrained project scheduling with time windows. In J. J\u00f3zefowska & J. Weglarz (Eds.), Perspectives in modern project scheduling (pp. 375\u2013407). New York: Springer."},{"key":"344_CR24","doi-asserted-by":"crossref","first-page":"591","DOI":"10.1016\/S0377-2217(98)00272-0","volume":"117","author":"K Neumann","year":"1999","unstructured":"Neumann, K., & Zimmermann, J. (1999). Resource levelling for projects with schedule-dependent time windows. European Journal of Operational Research, 117, 591\u2013605.","journal-title":"European Journal of Operational Research"},{"key":"344_CR25","doi-asserted-by":"crossref","first-page":"425","DOI":"10.1016\/S0377-2217(99)00498-1","volume":"127","author":"K Neumann","year":"2000","unstructured":"Neumann, K., & Zimmermann, J. (2000). Procedures for resource levelling and net present value problems in project scheduling with general temporal and resource constraints. European Journal of Operational Research, 127, 425\u2013443.","journal-title":"European Journal of Operational Research"},{"key":"344_CR26","doi-asserted-by":"crossref","first-page":"359","DOI":"10.1007\/PL00013357","volume":"23","author":"H N\u00fcbel","year":"2001","unstructured":"N\u00fcbel, H. (2001). The resource renting problem subject to temporal constraints. OR Spektrum, 23, 359\u2013381.","journal-title":"OR Spektrum"},{"key":"344_CR27","unstructured":"Petrovic, R. (1969). On optimization of resource leveling in project plans. In H. J. Lombaers (Ed.), Project Planning by Network Analysis: Proceedings of the Second International Congress (pp. 268\u2013273). Amsterdam, North-Holland."},{"key":"344_CR28","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1287\/mnsc.16.1.93","volume":"16","author":"AAB Pritsker","year":"1969","unstructured":"Pritsker, A. A. B., Watters, L. J., & Wolfe, P. M. (1969). Multi-project scheduling with limited resources: A zero-one programming approach. Management Science, 16, 93\u2013108.","journal-title":"Management Science"},{"issue":"5","key":"344_CR29","doi-asserted-by":"crossref","first-page":"317","DOI":"10.3844\/ajassp.2007.317.322","volume":"4","author":"K Raja","year":"2007","unstructured":"Raja, K., & Kumanan, S. (2007). Resource leveling using petrinet and memetic approach. American Journal of Applied Science, 4(5), 317\u2013322.","journal-title":"American Journal of Applied Science"},{"key":"344_CR30","doi-asserted-by":"crossref","first-page":"27","DOI":"10.1016\/j.ejor.2012.03.003","volume":"221","author":"J Rieck","year":"2012","unstructured":"Rieck, J., Zimmermann, J., & Gather, T. (2012). Mixed-integer linear programming for resource leveling problems. European Journal of Operational Research, 221, 27\u201337.","journal-title":"European Journal of Operational Research"},{"key":"344_CR31","doi-asserted-by":"crossref","first-page":"277","DOI":"10.1016\/S0965-9978(97)00019-7","volume":"28","author":"D Savin","year":"1997","unstructured":"Savin, D., Alkass, S., & Fazio, P. (1997). A procedure for calculating the weight-matrix of a neural network for resource leveling. Advances in Engineering Software, 28, 277\u2013283.","journal-title":"Advances in Engineering Software"},{"key":"344_CR32","unstructured":"Schwindt, C. (1998). Generation of resource-constrained project scheduling problems subject to temporal constraints. WIOR-Report 543, Institute for Economic Theory and Operations Research, University Karlsruhe, Germany."},{"key":"344_CR33","doi-asserted-by":"crossref","DOI":"10.1007\/3-540-27852-4","volume-title":"Resource allocation in project management","author":"C Schwindt","year":"2005","unstructured":"Schwindt, C. (2005). Resource allocation in project management. Berlin: Springer."},{"key":"344_CR34","doi-asserted-by":"crossref","first-page":"495","DOI":"10.1016\/j.conengprac.2012.11.012","volume":"21","author":"A Steinboeck","year":"2013","unstructured":"Steinboeck, A., Wild, D., & Kugi, A. (2013). Nonlinear model predictive control of a continuous slab reheating furnace. Control Engineering Practice, 21, 495\u2013508.","journal-title":"Control Engineering Practice"},{"issue":"10","key":"344_CR35","doi-asserted-by":"crossref","first-page":"68","DOI":"10.1002\/scj.4690261007","volume":"26","author":"M Takamoto","year":"1995","unstructured":"Takamoto, M., Yamada, N., Kobayashi, Y., & Nonaka, H. (1995). Zero-one quadratic programming algorithm for resource leveling of manufacturing process schedules. Systems and Computers in Japan, 26(10), 68\u201376.","journal-title":"Systems and Computers in Japan"},{"key":"344_CR36","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/0360-8352(96)00116-7","volume":"31","author":"MA Younis","year":"1996","unstructured":"Younis, M. A., & Saad, B. (1996). Optimal resource leveling of multi-resource projects. Computers and Industrial Engineering, 31, 1\u20134.","journal-title":"Computers and Industrial Engineering"},{"key":"344_CR37","doi-asserted-by":"crossref","first-page":"528","DOI":"10.1007\/s11015-005-0020-3","volume":"48","author":"SM Zhuchkov","year":"2004","unstructured":"Zhuchkov, S. M. (2004). Conserving energy and resources in the production of rolled sections and wire rod. Metallurgist, 48, 528\u2013535.","journal-title":"Metallurgist"},{"key":"344_CR38","unstructured":"Zimmermann, J. (1997). Heuristics for resource levelling problems in project scheduling with minimum and maximum time lags. WIOR-Report 491, Institute for Economic Theory and Operations Research, University Karlsruhe, Germany."},{"key":"344_CR39","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-322-81390-9","volume-title":"Ablauforientiertes Projektmanagement: Modelle Verfahren und Anwendungen","author":"J Zimmermann","year":"2001","unstructured":"Zimmermann, J. (2001). Ablauforientiertes Projektmanagement: Modelle Verfahren und Anwendungen. Wiesbaden: Gabler."}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-013-0344-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-013-0344-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-013-0344-y","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,3,4]],"date-time":"2022-03-04T01:45:30Z","timestamp":1646358330000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-013-0344-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,8,18]]},"references-count":39,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2014,4]]}},"alternative-id":["344"],"URL":"https:\/\/doi.org\/10.1007\/s10951-013-0344-y","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,8,18]]}}}