{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,4,3]],"date-time":"2022-04-03T05:09:25Z","timestamp":1648962565405},"reference-count":24,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2013,10,31]],"date-time":"2013-10-31T00:00:00Z","timestamp":1383177600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2015,4]]},"DOI":"10.1007\/s10951-013-0355-8","type":"journal-article","created":{"date-parts":[[2013,10,30]],"date-time":"2013-10-30T01:09:34Z","timestamp":1383095374000},"page":"155-163","source":"Crossref","is-referenced-by-count":1,"title":["How small are shifts required in optimal preemptive schedules?"],"prefix":"10.1007","volume":"18","author":[{"suffix":"Jr.","given":"E. G.","family":"Coffman","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"C. T.","family":"Ng","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"V. G.","family":"Timkovsky","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2013,10,31]]},"reference":[{"key":"355_CR1","unstructured":"Baptiste, Ph. (2002). On preemption redundancy. Technical report. Yorktown Heights, NY: IBM Watson Research Center."},{"key":"355_CR2","doi-asserted-by":"crossref","unstructured":"Baptiste, Ph, Carlier, J., Kononov, A., Sevastyanov, S., & Sviridenko, M. (2009a). Integrality property in preemptive parallel machine scheduling. Lectue Notes in Computer Science, 5675, 38\u201346.","DOI":"10.1007\/978-3-642-03351-3_6"},{"issue":"5","key":"355_CR3","doi-asserted-by":"publisher","first-page":"272","DOI":"10.1016\/j.dam.2010.11.015","volume":"159","author":"Ph Baptiste","year":"2011","unstructured":"Baptiste, Ph, Carlier, J., Kononov, A., Queyranne, M., Sevastyanov, S., & Sviridenko, M. (2011). Properties of optimal schedules in preemptive shop scheduling. Discrete Applied Mathematics, 159(5), 272\u2013280.","journal-title":"Discrete Applied Mathematics"},{"key":"355_CR4","unstructured":"Baptiste, Ph, Carlier, J., Kononov, A., Queyranne, M., Sevastianov, S., & Sviridenko, M. (2009b). Structural properties of preemptive schedules. Discrete Analysis and Operations Research, 16(1), 3\u201336."},{"issue":"5","key":"355_CR5","doi-asserted-by":"publisher","first-page":"205","DOI":"10.1016\/S0167-6377(01)00068-2","volume":"28","author":"Ph Baptiste","year":"2001","unstructured":"Baptiste, Ph, & Timkovsky, V. G. (2001). On preemption redundancy in scheduling unit processing time jobs on two parallel machines. Operations Research Letters, 28(5), 205\u2013212.","journal-title":"Operations Research Letters"},{"issue":"1","key":"355_CR6","doi-asserted-by":"publisher","first-page":"145","DOI":"10.1007\/s001860300336","volume":"60","author":"Ph Baptiste","year":"2004","unstructured":"Baptiste, Ph, & Timkovsky, V. G. (2004). Shortest path to nonpreemptive schedules of unit-time jobs on two identical parallel machines with minimum total completion time. Mathematical Methods of Operations Research, 60(1), 145\u2013153.","journal-title":"Mathematical Methods of Operations Research"},{"key":"355_CR7","unstructured":"Bertogna, M., Buttazzo, G. C., Marinoni, M., Yao, G., Esposito, F. & Caccamo. M. (2010). Preemption points placement for sporadic task sets. In ECRTS \u201910 proceedings of the 2010 22nd Euromicro conference on real-time systems (pp. 251\u2013260). Washington, DC: IEEE Computer Society."},{"key":"355_CR8","doi-asserted-by":"crossref","first-page":"129","DOI":"10.1016\/S0167-6377(02)00220-1","volume":"31","author":"P. Brucker","year":"2003","unstructured":"Brucker, P., Heitman, S., & Hurink, J. (2003). How useful are preemptive schedules. Operations Research Letters, 31, 129\u2013136.","journal-title":"Operations Research Letters"},{"key":"355_CR9","doi-asserted-by":"crossref","unstructured":"Brucker, P., Hurink, J., & Knust, S. (2002). A polynomial algorithm for \n                    \n                      \n                    \n                    $${P}\\vert p_j=1,r_j,\\text{ outtree }\\vert \\sum {C}j$$\n                    \n                      \n                        \n                          \n                            P\n                            |\n                          \n                          \n                            p\n                            j\n                          \n                          =\n                          1\n                          ,\n                          \n                            r\n                            j\n                          \n                          \n                            ,\n                            \n                            outtree\n                            \n                            |\n                            \u2211\n                            C\n                            j\n                          \n                        \n                      \n                    \n                  . Mathematical Methods of Operations Research, 56(3), 407\u2013412.","DOI":"10.1007\/s001860200228"},{"issue":"3","key":"355_CR10","first-page":"15","volume":"9","author":"GC Buttazzo","year":"2013","unstructured":"Buttazzo, G. C., Bertogna, M., & Yao, G. (2013). Limited preemptive scheduling for real-time systems: A survey. IEEE Transactions on Industrial Informatics, 9(3), 15.","journal-title":"IEEE Transactions on Industrial Informatics"},{"issue":"8","key":"355_CR11","doi-asserted-by":"publisher","first-page":"597","DOI":"10.1007\/s00236-003-0119-6","volume":"39","author":"EG Coffman Jr","year":"2003","unstructured":"Coffman, E. G, Jr, Sethuraman, J., & Timkovsky, V. G. (2003). Ideal preemptive schedules on two processors. Acta Informatica, 39(8), 597\u2013612.","journal-title":"Acta Informatica"},{"issue":"2","key":"355_CR12","doi-asserted-by":"publisher","first-page":"219","DOI":"10.1016\/0890-5401(91)90009-Q","volume":"92","author":"J Du","year":"1991","unstructured":"Du, J., Leung, J. Y.-T., & Young, G. H. (1991). Scheduling chain-structured tasks to minimize makespan and mean flow time. Information and Computation, 92(2), 219\u2013236.","journal-title":"Information and Computation"},{"key":"355_CR13","doi-asserted-by":"publisher","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"5","author":"RL Graham","year":"1979","unstructured":"Graham, R. L., Lawler, E. L., Lenstra, J. K., & Rinnooy Kan, A. H. G. (1979). Optimization and approximation in deterministic sequencing and scheduling: A survey. Annals of Discrete Mathematics, 5, 287\u2013326.","journal-title":"Annals of Discrete Mathematics"},{"key":"355_CR14","unstructured":"Lawler, E. L. (1982). Preemptive scheduling of precedence-constrained jobs on parallel machines. In M. A. H. Dempster, J. K. Lenstra, & A. H. G. Rinnooy Kan (Eds.), Deterministic and stochastic scheduling (pp. 101\u2013123). Proceedings of the NATO advanced study and research institute on theoretical approaches to scheduling problems held in Durham, July 6\u201317, 1981, Vol. 84 of NATO advanced study institute series C: Mathematical and Physical Sciences Dordrecht: D. Reidel Publishing Co."},{"key":"355_CR15","first-page":"445","volume-title":"Handbook on operations research and management science, Vol. 4 of logistics of production and inventory","author":"EL Lawler","year":"1993","unstructured":"Lawler, E. L., Lenstra, J. K., Rinnooy Kan, A. H. G., & Shmoys, D. B. (1993). Sequencing and scheduling: Algorithms and complexity. In S. C. Graves, A. H. G. Rinnooy Kan, & P. Zipkin (Eds.), Handbook on operations research and management science, Vol. 4 of logistics of production and inventory (pp. 445\u2013552). Amsterdam: Elsevier."},{"key":"355_CR16","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1287\/mnsc.6.1.1","volume":"6","author":"R McNaughton","year":"1959","unstructured":"McNaughton, R. (1959). Scheduling with deadlines and loss functions. Management Science, 6, 1\u201312.","journal-title":"Management Science"},{"key":"355_CR17","unstructured":"Meumeu Yomsi, P., & Sorel, Y. (2007). Extending rate monotonic analysis with exact cost of preemptions for hard real-time systems. In ECRTS \u201907 Proceedings of the 19th Euromicro conference on real-time systems (pp. 280\u2013290). Washington, DC: IEEE Computer Society."},{"key":"355_CR18","doi-asserted-by":"publisher","first-page":"1014","DOI":"10.1109\/T-C.1969.222573","volume":"C18","author":"RR Muntz","year":"1969","unstructured":"Muntz, R. R., & Coffman, E. G, Jr. (1969). Optimal preemptive scheduling on two-processor systems. IEEE Transactions of Computers, C18, 1014\u20131020.","journal-title":"IEEE Transactions of Computers"},{"issue":"2","key":"355_CR19","doi-asserted-by":"publisher","first-page":"324","DOI":"10.1145\/321574.321586","volume":"17","author":"RR Muntz","year":"1970","unstructured":"Muntz, R. R., & Coffman, E. G, Jr. (1970). Preemptive scheduling of real-time tasks on multiprocessor system. Journal of the ACM, 17(2), 324\u2013338.","journal-title":"Journal of the ACM"},{"key":"355_CR20","unstructured":"Ndoye, F. & Sorel, Y. (2011). Preemptive multiprocessor real-time scheduling with exact preemption cost. In Proceedings of 5th Junior researcher workshop on real-time computing (pp. 25\u201328). Nantes, 29\u201330 September."},{"key":"355_CR21","first-page":"756","volume":"30","author":"HJ Ryser","year":"1956","unstructured":"Ryser, H. J. (1956). Maximal determinants in combinatorial investigations. Canadian Journal of Mathematics, 30, 756\u2013762.","journal-title":"Canadian Journal of Mathematics"},{"key":"355_CR22","doi-asserted-by":"publisher","first-page":"195","DOI":"10.1007\/BF00337697","volume":"4","author":"NW Sauer","year":"1987","unstructured":"Sauer, N. W., & Stone, M. G. (1987). Rational preemptive scheduling. Order, 4, 195\u2013206.","journal-title":"Order"},{"key":"355_CR23","doi-asserted-by":"publisher","first-page":"309","DOI":"10.1007\/s00453-005-1171-0","volume":"42","author":"H Shachnai","year":"2005","unstructured":"Shachnai, H., Tamir, T., & Woeginger, G. J. (2005). Minimizing makespan and preemption costs on a system of uniform machines. Algorithmica, 42, 309\u2013334.","journal-title":"Algorithmica"},{"key":"355_CR24","unstructured":"Timkovsky, V. G. (2004). Reducibility among scheduling classes. In J. Y. -T. Leung (Ed.), Handbook of scheduling: Algorithms, models, and performance analysis, Chapter 8 (pp. 8.1\u20138.42). London: CRC Press."}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-013-0355-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-013-0355-8\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-013-0355-8","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-013-0355-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,2,17]],"date-time":"2020-02-17T12:50:25Z","timestamp":1581943825000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-013-0355-8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,10,31]]},"references-count":24,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2015,4]]}},"alternative-id":["355"],"URL":"https:\/\/doi.org\/10.1007\/s10951-013-0355-8","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,10,31]]}}}