{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,4,5]],"date-time":"2022-04-05T04:46:02Z","timestamp":1649133962468},"reference-count":15,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2014,6,19]],"date-time":"2014-06-19T00:00:00Z","timestamp":1403136000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2016,6]]},"DOI":"10.1007\/s10951-014-0384-y","type":"journal-article","created":{"date-parts":[[2014,6,19]],"date-time":"2014-06-19T10:25:58Z","timestamp":1403173558000},"page":"215-225","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Time-hierarchical scheduling"],"prefix":"10.1007","volume":"19","author":[{"given":"Jens","family":"Leoff","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Heiner","family":"Ackermann","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Karl-Heinz","family":"K\u00fcfer","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2014,6,19]]},"reference":[{"issue":"2","key":"384_CR1","doi-asserted-by":"crossref","first-page":"361","DOI":"10.1016\/j.cie.2010.12.005","volume":"60","author":"EH Aghezzaf","year":"2011","unstructured":"Aghezzaf, E. H., Sitompul, C., & Van den Broecke, F. (2011). A robust hierarchical production planning for a capacitated two-stage production system. Computers & Industrial Engineering, 60(2), 361\u2013372.","journal-title":"Computers & Industrial Engineering"},{"issue":"5\u20138","key":"384_CR2","doi-asserted-by":"crossref","first-page":"721","DOI":"10.1007\/s00170-009-2147-z","volume":"46","author":"J Behnamian","year":"2010","unstructured":"Behnamian, J., & Zandieh, M. (2010). Due windows group scheduling using an effective hybrid optimization approach. The International Journal of Advanced Manufacturing Technology, 46(5\u20138), 721\u2013735.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"2","key":"384_CR3","doi-asserted-by":"crossref","first-page":"156","DOI":"10.1016\/0377-2217(89)90100-8","volume":"38","author":"T Cheng","year":"1989","unstructured":"Cheng, T., & Gupta, M. (1989). Survey of scheduling research involving due date determination decisions. European Journal of Operational Research, 38(2), 156\u2013166.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"384_CR4","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1287\/opre.1080.0662","volume":"58","author":"W Heuvel Van den","year":"2010","unstructured":"Van den Heuvel, W., & Wagelmans, A. P. M. (2010). Worst-case analysis for a general class of online lot-sizing heuristics. Operations Research, 58(1), 59\u201367.","journal-title":"Operations Research"},{"issue":"1","key":"384_CR5","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1111\/j.1937-5956.2004.tb00146.x","volume":"13","author":"S Kreipl","year":"2004","unstructured":"Kreipl, S., & Pinedo, M. (2004). Planning and scheduling in supply chains: An overview of issues in practice. Production and Operations Management, 13(1), 77\u201392.","journal-title":"Production and Operations Management"},{"issue":"2","key":"384_CR6","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1504\/IJMR.2010.031630","volume":"5","author":"X Li","year":"2010","unstructured":"Li, X., Gao, L., Zhang, C., & Shao, X. (2010). A review on integrated process planning and scheduling. International Journal of Manufacturing Research, 5(2), 161\u2013180.","journal-title":"International Journal of Manufacturing Research"},{"issue":"22","key":"384_CR7","doi-asserted-by":"crossref","first-page":"5887","DOI":"10.1016\/j.ces.2010.08.010","volume":"65","author":"Z Li","year":"2010","unstructured":"Li, Z., & Ierapetritou, M. G. (2010). Rolling horizon based planning and scheduling integration with production capacity consideration. Chemical Engineering Science, 65(22), 5887\u20135900.","journal-title":"Chemical Engineering Science"},{"issue":"12","key":"384_CR8","doi-asserted-by":"crossref","first-page":"1919","DOI":"10.1016\/j.compchemeng.2009.06.007","volume":"33","author":"CT Maravelias","year":"2009","unstructured":"Maravelias, C. T., & Sung, C. (2009). Integration of production planning and scheduling: Overview, challenges and opportunities. Computers & Chemical Engineering, 33(12), 1919\u20131930.","journal-title":"Computers & Chemical Engineering"},{"issue":"3","key":"384_CR9","doi-asserted-by":"crossref","first-page":"718","DOI":"10.1016\/j.ejor.2013.03.036","volume":"229","author":"H Meyr","year":"2013","unstructured":"Meyr, H., & Mann, M. (2013). A decomposition approach for the general lotsizing and scheduling problem for parallel production lines. European Journal of Operational Research, 229(3), 718\u2013731.","journal-title":"European Journal of Operational Research"},{"key":"384_CR10","unstructured":"MISTA Proceedings (2013). In Kendall, G., Vanden Berghe, G., & McCollum, B. Proceedings of the Multidisciplinary International Scheduling Conference: Theory and Applications. MISTA, Ghent, ISSN 2305\u2013249X."},{"issue":"1","key":"384_CR11","doi-asserted-by":"crossref","first-page":"116","DOI":"10.1145\/321921.321934","volume":"23","author":"SK Sahni","year":"1976","unstructured":"Sahni, S. K. (1976). Algorithms for scheduling independent tasks. Journal of ACM, 23(1), 116\u2013127.","journal-title":"Journal of ACM"},{"key":"384_CR12","doi-asserted-by":"crossref","unstructured":"Schneeweiss, C. (2003). Distributed decision making. Berlin, Heidelberg, New York: Springer.","DOI":"10.1007\/978-3-540-24724-1"},{"issue":"1","key":"384_CR13","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2010.09.042","volume":"212","author":"SA Slotnick","year":"2011","unstructured":"Slotnick, S. A. (2011). Order acceptance and scheduling: A taxonomy and review. European Journal of Operational Research, 212(1), 1\u201311.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"384_CR14","doi-asserted-by":"crossref","first-page":"377","DOI":"10.1016\/S0007-8506(07)60720-3","volume":"53","author":"J V\u00e1ncza","year":"2004","unstructured":"V\u00e1ncza, J., Kis, T., & Kov\u00e1cs, A. (2004). Aggregation - the key to integrating production planning and scheduling. CIRP Annals - Manufacturing Technology, 53(1), 377\u2013380.","journal-title":"CIRP Annals - Manufacturing Technology"},{"issue":"2","key":"384_CR15","doi-asserted-by":"crossref","first-page":"919","DOI":"10.1016\/j.ijpe.2007.08.005","volume":"112","author":"M Zorzini","year":"2008","unstructured":"Zorzini, M., Corti, D., & Pozzetti, A. (2008). Due date (dd) quotation and capacity planning in make-to-order companies: Results from an empirical analysis. International Journal of Production Economics, 112(2), 919\u2013933.","journal-title":"International Journal of Production Economics"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-014-0384-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-014-0384-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-014-0384-y","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T09:39:50Z","timestamp":1559468390000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-014-0384-y"}},"subtitle":["A worst case analysis of a hierarchical approach integrating planning and scheduling in an online problem"],"short-title":[],"issued":{"date-parts":[[2014,6,19]]},"references-count":15,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2016,6]]}},"alternative-id":["384"],"URL":"https:\/\/doi.org\/10.1007\/s10951-014-0384-y","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,6,19]]}}}