{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,1]],"date-time":"2026-06-01T19:41:52Z","timestamp":1780342912950,"version":"3.54.1"},"reference-count":11,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2014,10,2]],"date-time":"2014-10-02T00:00:00Z","timestamp":1412208000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2016,8]]},"DOI":"10.1007\/s10951-014-0397-6","type":"journal-article","created":{"date-parts":[[2014,10,1]],"date-time":"2014-10-01T04:57:07Z","timestamp":1412139427000},"page":"367-376","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":74,"title":["A memetic algorithm to solve an unrelated parallel machine scheduling problem with auxiliary resources in semiconductor manufacturing"],"prefix":"10.1007","volume":"19","author":[{"given":"Abdoul","family":"Bitar","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"St\u00e9phane","family":"Dauz\u00e8re-P\u00e9r\u00e8s","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Claude","family":"Yugma","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Renaud","family":"Roussel","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2014,10,2]]},"reference":[{"issue":"1","key":"397_CR1","doi-asserted-by":"crossref","first-page":"48","DOI":"10.1109\/66.909654","volume":"14","author":"E Ak\u00e7ali","year":"2001","unstructured":"Ak\u00e7ali, E., Nemoto, K., & Uzsoy, R. (2001). Cycle time improvements for photolithography process in semiconductor manufacturing. IEEE Transaction of Semiconductor Manufacturing, 14(1), 48\u201356.","journal-title":"IEEE Transaction of Semiconductor Manufacturing"},{"issue":"1","key":"397_CR2","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1016\/0166-218X(83)90012-4","volume":"5","author":"J Blazewicz","year":"1983","unstructured":"Blazewicz, J., Lenstra, J. K., & Rinnooy Kan, A. H. (1983). Scheduling subject to resource constraints: Classification and complexity. Discrete Applied Mathematics, 5(1), 11\u201324.","journal-title":"Discrete Applied Mathematics"},{"issue":"3","key":"397_CR3","doi-asserted-by":"crossref","first-page":"217","DOI":"10.1080\/09537280601035836","volume":"18","author":"E Cakici","year":"2007","unstructured":"Cakici, E., & Mason, S. J. (2007). Parallel machine scheduling subject to auxiliary resource constraints. Production Planning and Control, 18(3), 217\u2013225.","journal-title":"Production Planning and Control"},{"issue":"1\u20132","key":"397_CR4","first-page":"119","volume":"3","author":"SM Chandra","year":"2008","unstructured":"Chandra, S. M., Mathirajan, M., Gopinath, R., & Sivakumar, A. I. (2008). Taboo search methods for scheduling a burn-in oven with non-identical job sizes and secondary resource constraints. International Journal of Operational Research, 3(1\u20132), 119\u2013139.","journal-title":"International Journal of Operational Research"},{"issue":"4","key":"397_CR5","doi-asserted-by":"crossref","first-page":"622","DOI":"10.1109\/TSM.2005.858502","volume":"18","author":"SLM Diaz de","year":"2005","unstructured":"de Diaz, S. L. M., Fowler, J. W., Pfund, M. E., Mackulak, G. T., & Hickie, M. (2005). Evaluating the impacts of reticle requirements in semiconductor wafer fabrication. IEEE Transactions on Semiconductor Manufacturing, 18(4), 622\u2013632.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"issue":"1","key":"397_CR6","doi-asserted-by":"crossref","first-page":"37","DOI":"10.1016\/S0278-6125(98)80008-3","volume":"17","author":"K Kempf","year":"1998","unstructured":"Kempf, K., Uzsoy, R., & Wang, C.-S. (1998). Scheduling a single batch processing machine with secondary resource constraints. Journal of Manufacturing Systems, 17(1), 37\u201351.","journal-title":"Journal of Manufacturing Systems"},{"issue":"2","key":"397_CR7","doi-asserted-by":"crossref","first-page":"251","DOI":"10.1016\/j.ijpe.2008.09.003","volume":"116","author":"JYT Leung","year":"2008","unstructured":"Leung, J. Y. T., & Li, C. L. (2008). Scheduling with processing set restrictions: A survey. International Journal of Production Economics, 116(2), 251\u2013262.","journal-title":"International Journal of Production Economics"},{"key":"397_CR8","unstructured":"M\u00f6nch, L. (2002). A genetic algorithm heuristic applied to stepper scheduling. In Proceedings of the International Conference on Modelling and Analysis of Semiconductor Manufacturing, Tempe, USA, (pp. 276\u2013281)."},{"key":"397_CR9","volume-title":"Production planning and control for semiconductor wafer fabrication facilities: Modeling, analysis, and systems","author":"L M\u00f6nch","year":"2012","unstructured":"M\u00f6nch, L., Fowler, J. W., & Mason, S. J. (2012). Production planning and control for semiconductor wafer fabrication facilities: Modeling, analysis, and systems. New York: Springer."},{"issue":"6","key":"397_CR10","doi-asserted-by":"crossref","first-page":"583","DOI":"10.1007\/s10951-010-0222-9","volume":"14","author":"L M\u00f6nch","year":"2011","unstructured":"M\u00f6nch, L., Fowler, J. W., Dauz\u00e8re-P\u00e9r\u00e8s, S., Mason, S. J., & Rose, O. (2011). A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations. Journal of Scheduling, 14(6), 583\u2013599.","journal-title":"Journal of Scheduling"},{"issue":"1","key":"397_CR11","doi-asserted-by":"crossref","first-page":"4","DOI":"10.1080\/09537287.2010.490014","volume":"22","author":"SC Sarin","year":"2011","unstructured":"Sarin, S. C., Varadarajan, A., & Wang, L. (2011). A survey of dispatching rules for operational control in wafer fabrication. Production Planning & Control, 22(1), 4\u201324.","journal-title":"Production Planning & Control"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-014-0397-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-014-0397-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-014-0397-6","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T05:39:50Z","timestamp":1559453990000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-014-0397-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,10,2]]},"references-count":11,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2016,8]]}},"alternative-id":["397"],"URL":"https:\/\/doi.org\/10.1007\/s10951-014-0397-6","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,10,2]]}}}