{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,8,5]],"date-time":"2026-08-05T21:15:22Z","timestamp":1785964522853,"version":"3.56.0"},"reference-count":20,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2014,11,22]],"date-time":"2014-11-22T00:00:00Z","timestamp":1416614400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2016,6]]},"DOI":"10.1007\/s10951-014-0402-0","type":"journal-article","created":{"date-parts":[[2014,11,21]],"date-time":"2014-11-21T08:45:27Z","timestamp":1416559527000},"page":"271-283","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":64,"title":["The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem"],"prefix":"10.1007","volume":"19","author":[{"given":"Tony","family":"Wauters","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Joris","family":"Kinable","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Pieter","family":"Smet","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Wim","family":"Vancroonenburg","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Greet","family":"Vanden Berghe","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Jannes","family":"Verstichel","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2014,11,22]]},"reference":[{"key":"402_CR1","unstructured":"Alonso-Pecina, F., Pecero, J. E., & Romero, D. (2013). A three-phases based algorithm for the multi-mode resource-constrained multi-project scheduling problem. In G. Kendall, G. Vanden Berghe, & B. McCollum (Eds.), Proceedings of the 6th Multidisciplinary International Scheduling Conference (pp. 812\u2013814). : MISTA."},{"key":"402_CR2","unstructured":"Artigues, C., & Hebrard, E. (2013). MIP relaxation and large neighborhood search for a multi-mode resource-constrained multi-project scheduling problem. In G. Kendall, G. Vanden Berghe, & B. McCollum (Eds.), Proceedings of the 6th Multidisciplinary International Scheduling Conference (pp. 815\u2013819). : MISTA."},{"key":"402_CR3","unstructured":"Asta, S., Karapetyan, D., Kheiri, A., \u00d6zcan, E., & Parkes, A. (2013). Combining monte-carlo and hyper-heuristic methods for the multi-mode resource-constrained multi-project scheduling problem. In G. Kendall, G. Vanden Berghe, & B. McCollum (Eds.), Proceedings of the 6th Multidisciplinary International Scheduling Conference (pp. 836\u2013839). : MISTA."},{"issue":"1","key":"402_CR4","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1016\/0166-218X(83)90012-4","volume":"5","author":"J Blazewicz","year":"1983","unstructured":"Blazewicz, J., Lenstra, J., & Rinnooy Kan, A. (1983). Scheduling subject to resource constraints: Classification and complexity. Discrete Applied Mathematics, 5(1), 11\u201324. doi: 10.1016\/0166-218X(83)90012-4 .","journal-title":"Discrete Applied Mathematics"},{"key":"402_CR5","unstructured":"Borba, L.M., Benavides, A.J., Zubaran, T., Carniel, G.C., & Ritt, M. (2013). A simple stochastic local search for multi-mode resource-constrained multi-project scheduling. In G. Kendall, G. Vanden Berghe, & B. McCollum (Eds.), Proceedings of the 6th Multidisciplinary International Scheduling Conference (pp. 826\u2013830). : MISTA."},{"key":"402_CR6","unstructured":"Bouly, H., Dang, D.C., Moukrim, A., & Xu, H. (2013). Evolutionary algorithm and post-processing to minimize the total delay in multi-project scheduling. In G. Kendall, G. Vanden Berghe, & B. McCollum (Eds.), Proceedings of the 6th Multidisciplinary International Scheduling Conference (pp. 831\u2013835). : MISTA."},{"key":"402_CR7","doi-asserted-by":"crossref","unstructured":"Burke, E. K., Gendreau, M., Hyde, M., Kendall, G., McCollum, B., Ochoa, G., et al. (2011). The cross-domain heuristic search challenge - an international research competition. In C. A. Coello Coello (Ed.), Learning and Intelligent Optimization, Lecture Notes in Computer Science (Vol. 6683, pp. 631\u2013634). Berlin Heidelberg: Springer. doi: 10.1007\/978-3-642-25566-3_49 .","DOI":"10.1007\/978-3-642-25566-3_49"},{"key":"402_CR8","unstructured":"Geiger, M.J. (2013). Iterated variable neighborhood search for the resource constrained multi-mode multi-project scheduling problem. In G. Kendall, G. Vanden Berghe, & B. McCollum (Eds.), Proceedings of the 6th Multidisciplinary International Scheduling Conference (pp. 807\u2013811). : MISTA."},{"key":"402_CR9","doi-asserted-by":"crossref","unstructured":"Haspeslagh, S., De Causmaecker, P., Schaerf, A., & St\u00f8levik, M., (2012). The first international nurse rostering competition 2010. Annals of Operations Research, pp 1\u201316, doi: 10.1007\/s10479-012-1062-0 .","DOI":"10.1007\/s10479-012-1062-0"},{"key":"402_CR10","first-page":"987","volume":"29","author":"R Kolisch","year":"1997","unstructured":"Kolisch, R., & Drexl, A. (1997). Local search for nonpreemptive multi-mode resource-constrained project scheduling. IIE Transactions, 29, 987\u2013999.","journal-title":"IIE Transactions"},{"key":"402_CR11","unstructured":"L\u00f3pez-Ib\u00e1\u00f1ez, M., Mascia, F., Marmion, M.E., & St\u00fctzle, T. (2013). Automatic design of a hybrid iterated local search for the multi-mode resource-constrained multi-project scheduling problem. In G. Kendall, G. Vanden Berghe, & B. McCollum (Eds.), Proceedings of the 6th Multidisciplinary International Scheduling Conference (pp. 820\u2013825). : MISTA."},{"issue":"2","key":"402_CR12","doi-asserted-by":"crossref","first-page":"302","DOI":"10.1016\/j.ijpe.2008.11.002","volume":"117","author":"A Lova","year":"2009","unstructured":"Lova, A., Tormos, P., Cervantes, M., & Barber, F. (2009). An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes. International Journal of Production Economics, 117(2), 302\u2013316. doi: 10.1016\/j.ijpe.2008.11.002 .","journal-title":"International Journal of Production Economics"},{"key":"402_CR13","unstructured":"McCollum, B., Mcmullan, P., Burke, E. K., Parkes, A. J., & Qu, R. (2007). The second international timetabling competition: Examination timetabling track."},{"key":"402_CR14","doi-asserted-by":"crossref","unstructured":"Post, G., Di Gaspero, L., Kingston, J., McCollum, B., Schaerf, A. (2013). The third international timetabling competition. Annals of Operations Research pp 1\u20137, doi: 10.1007\/s10479-013-1340-5 , http:\/\/dx.doi.org\/10.1007\/s10479-013-1340-5","DOI":"10.1007\/s10479-013-1340-5"},{"key":"402_CR15","unstructured":"Schnell, A. (2013). A hybrid local search algorithm integrating an exact cp-sat approach to solve the multi-mode resource-constrained multi-project scheduling problem. In G. Kendall, G. Vanden Berghe, & B. McCollum (Eds.), Proceedings of the 6th Multidisciplinary International Scheduling Conference (pp. 802\u2013806). : MISTA."},{"issue":"3","key":"402_CR16","doi-asserted-by":"crossref","first-page":"912","DOI":"10.1016\/j.ejor.2007.04.033","volume":"191","author":"C Solnon","year":"2008","unstructured":"Solnon, C., Cung, V. D., Nguyen, A., & Artigues, C. (2008). The car sequencing problem: Overview of state-of-the-art methods and industrial case-study of the roadef2005 challenge problem. European Journal of Operational Research, 191(3), 912\u2013927. doi: 10.1016\/j.ejor.2007.04.033 .","journal-title":"European Journal of Operational Research"},{"key":"402_CR17","unstructured":"Toffolo, T. A. M., Santos, H. G., Carvalho, M., & Soares, J. (2013). An integer programming approach for the multi-mode resource-constrained multi-project scheduling problem. In G. Kendall, G. Vanden Berghe, & B. McCollum (Eds.), Proceedings of the 6th Multidisciplinary International Scheduling Conference (pp. 840\u2013847). : MISTA."},{"issue":"2","key":"402_CR18","doi-asserted-by":"crossref","first-page":"375","DOI":"10.1016\/j.ejor.2004.04.008","volume":"165","author":"V Valls","year":"2005","unstructured":"Valls, V., Ballestin, F., & Quintanilla, S. (2005). Justification and rcpsp: A technique that pays. European Journal of Operational Research, 165(2), 375\u2013386. doi: 10.1016\/j.ejor.2004.04.008 .","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"402_CR19","doi-asserted-by":"crossref","first-page":"222","DOI":"10.1016\/j.engappai.2011.05.002","volume":"25","author":"T Wauters","year":"2012","unstructured":"Wauters, T., Verbeeck, K., Verstraete, P., & De Causmaecker, P. (2012). Real-world production scheduling for the food industry: An integrated approach. Engineering Applications of Artificial Intelligence, 25(2), 222\u2013228. doi: 10.1016\/j.engappai.2011.05.002 .","journal-title":"Engineering Applications of Artificial Intelligence"},{"key":"402_CR20","unstructured":"Wauters, T., Kinable, J., Smet, P., Vancroonenburg, W., Verstichel (2013). The MISTA 2013 challenge. http:\/\/allserv.kahosl.be\/mista2013challenge\/ , [Online]"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-014-0402-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-014-0402-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-014-0402-0","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,8,17]],"date-time":"2019-08-17T13:40:59Z","timestamp":1566049259000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-014-0402-0"}},"subtitle":["The MISTA 2013 challenge"],"short-title":[],"issued":{"date-parts":[[2014,11,22]]},"references-count":20,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2016,6]]}},"alternative-id":["402"],"URL":"https:\/\/doi.org\/10.1007\/s10951-014-0402-0","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,11,22]]}}}