{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,9,24]],"date-time":"2026-09-24T14:40:09Z","timestamp":1790260809878,"version":"4.1.0"},"reference-count":26,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2014,12,3]],"date-time":"2014-12-03T00:00:00Z","timestamp":1417564800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2015,6]]},"DOI":"10.1007\/s10951-014-0404-y","type":"journal-article","created":{"date-parts":[[2014,12,2]],"date-time":"2014-12-02T07:48:54Z","timestamp":1417506534000},"page":"225-241","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":19,"title":["Energetic reasoning for energy-constrained scheduling with a continuous resource"],"prefix":"10.1007","volume":"18","author":[{"given":"Christian","family":"Artigues","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Pierre","family":"Lopez","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2014,12,3]]},"reference":[{"issue":"1","key":"404_CR1","doi-asserted-by":"crossref","first-page":"13","DOI":"10.1016\/j.ijpe.2010.09.030","volume":"143","author":"C Artigues","year":"2013","unstructured":"Artigues, C., Lopez, P., & Ha\u00eft, A. (2013). The energy scheduling problem: Industrial case study and constraint propagation techniques. International Journal of Production Economics, 143(1), 13\u201323.","journal-title":"International Journal of Production Economics"},{"key":"404_CR2","doi-asserted-by":"crossref","first-page":"305","DOI":"10.1023\/A:1018995000688","volume":"92","author":"P Baptiste","year":"1999","unstructured":"Baptiste, P., Le Pape, C., & Nuijten, W. (1999). Satisfiability tests and time-bound adjustments for cumulative scheduling problems. Annals of Operations research, 92, 305\u2013333.","journal-title":"Annals of Operations research"},{"key":"404_CR3","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4615-1479-4","volume-title":"Constraint-based scheduling","author":"P Baptiste","year":"2001","unstructured":"Baptiste, P., Le Pape, C., & Nuijten, W. (2001). Constraint-based scheduling. Boston, MA: Kluwer Academic Publishers."},{"issue":"2","key":"404_CR4","doi-asserted-by":"crossref","first-page":"255","DOI":"10.2478\/bpasts-2014-0025","volume":"62","author":"MS Barketau","year":"2014","unstructured":"Barketau, M. S., Kovalyov, M. Y., Machowiak, M., & W\u0229glarz, J. (2014). Scheduling arbitrary number of malleable tasks on multiprocessor systems. Bulletin of the Polish Academy of Sciences: Technical Sciences, 62(2), 255\u2013261.","journal-title":"Bulletin of the Polish Academy of Sciences: Technical Sciences"},{"key":"404_CR5","first-page":"214","volume-title":"CPAIOR 2007 LNCS","author":"N Beldiceanu","year":"2007","unstructured":"Beldiceanu, N., & Poder, E. (2007). A continuous multi-resources cumulative constraint with positive-negative resource consumption-production. In P. Van Hentenryck & L. Wolsey (Eds.), CPAIOR 2007 LNCS (Vol. 4510, pp. 214\u2013228). Berlin: Springer."},{"key":"404_CR6","first-page":"229","volume-title":"TAPAS 2011 LNCS","author":"T Berthold","year":"2011","unstructured":"Berthold, T., Heinz, S., & Schulz, J. (2011). An approximative criterion for the potential of energetic reasoning. In A. Marchetti-Spaccamela & M. Segal (Eds.), TAPAS 2011 LNCS (Vol. 6595, pp. 229\u2013239). Berlin: Springer."},{"key":"404_CR7","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-662-03217-6","volume-title":"Scheduling computer and manufacturing processes","author":"J B\u0142a\u017cewicz","year":"1996","unstructured":"B\u0142a\u017cewicz, J., Ecker, K. H., Pesch, E., Schmidt, G., & W\u0229glarz, J. (1996). Scheduling computer and manufacturing processes. Berlin: Springer."},{"issue":"4","key":"404_CR8","doi-asserted-by":"crossref","first-page":"486","DOI":"10.1109\/TC.2006.58","volume":"55","author":"J B\u0142a\u017cewicz","year":"2006","unstructured":"B\u0142a\u017cewicz, J., Kovalyov, M. Y., Machowiak, M., Trystram, D., & W\u0229glarz, J. (2006). Preemptable malleable task scheduling problem. IEEE Transactions on Computers, 55(4), 486\u2013490.","journal-title":"IEEE Transactions on Computers"},{"issue":"1","key":"404_CR9","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1016\/j.ejor.2011.03.019","volume":"213","author":"J Coelho","year":"2011","unstructured":"Coelho, J., & Vanhoucke, M. (2011). Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers. European Journal of Operational Research, 213(1), 73\u201382.","journal-title":"European Journal of Operational Research"},{"key":"404_CR10","unstructured":"Erschler, J., Lopez, P. (1990). Energy-based approach for task scheduling under time and resources constraints. In 2nd International Workshop on Project Management and Scheduling (pp. 115\u2013121). France: Compi\u00e8gne."},{"issue":"3","key":"404_CR11","doi-asserted-by":"crossref","first-page":"568","DOI":"10.1016\/j.ejor.2009.09.019","volume":"203","author":"C-U F\u00fcndeling","year":"2010","unstructured":"F\u00fcndeling, C.-U., & Trautmann, N. (2010). A priority-rule method for project scheduling with work-content constraints. European Journal of Operational Research, 203(3), 568\u2013574.","journal-title":"European Journal of Operational Research"},{"key":"404_CR12","unstructured":"Gaoua, Y., Caux, S., Lopez, P. (2013). Energy management for an electric vehicle based on combinatorial modeling. In 5th International Conference on Industrial Engineering and Systems Management (IESM 2013). Morocco: Rabat."},{"key":"404_CR13","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1007\/s10479-010-0693-2","volume":"181","author":"A Horbach","year":"2010","unstructured":"Horbach, A. (2010). A Boolean satisfiability approach to the resource-constrained project scheduling problem. Annals of Operations Research, 181, 89\u2013107.","journal-title":"Annals of Operations Research"},{"issue":"2","key":"404_CR14","doi-asserted-by":"crossref","first-page":"63","DOI":"10.1145\/1067309.1067324","volume":"36","author":"S Irani","year":"2005","unstructured":"Irani, S., & Pruhs, K. (2005). Algorithmic problems in power management. SIGACT News, 36(2), 63\u201376.","journal-title":"SIGACT News"},{"issue":"1","key":"404_CR15","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1007\/s10288-011-0192-6","volume":"10","author":"M Jacomino","year":"2012","unstructured":"Jacomino, M., & Le, M.-H. (2012). Robust energy planning in buildings with energy and comfort costs. 4OR, 10(1), 81\u2013103.","journal-title":"4OR"},{"issue":"7","key":"404_CR16","doi-asserted-by":"crossref","first-page":"89","DOI":"10.3917\/proj.007.0089","volume":"1","author":"I Lizarralde","year":"2011","unstructured":"Lizarralde, I., Esquirol, P., & Rivi\u00e8re, A. (2011). A decision support system to schedule design activities with interdependency and resource constraints. Projectics \/ Proy\u00e9ctica \/ Projectique, 1(7), 89\u2013103.","journal-title":"Projectics \/ Proy\u00e9ctica \/ Projectique"},{"key":"404_CR17","unstructured":"Lopez, P., Esquirol, P. (1996). Consistency enforcing in scheduling: A general formulation based on energetic reasoning. In 5th International Workshop on Project Management and Scheduling (pp. 155\u2013158). Poland: Pozna\u0144."},{"key":"404_CR18","doi-asserted-by":"crossref","unstructured":"Mercier, L., & Van Hentenryck, P. (2007). Strong polynomiality of resource constraint propagation. Discrete Optimization, 4, 288\u2013314.","DOI":"10.1016\/j.disopt.2007.01.001"},{"key":"404_CR19","doi-asserted-by":"crossref","unstructured":"Nolde, K., & Morari, M. (2010). Electrical load tracking scheduling of a steel plant. Computers and Operations Research, 34(11), 1899\u20131903.","DOI":"10.1016\/j.compchemeng.2010.01.011"},{"issue":"1","key":"404_CR20","doi-asserted-by":"crossref","first-page":"35","DOI":"10.1016\/j.ejor.2007.10.042","volume":"193","author":"M Ranjbar","year":"2009","unstructured":"Ranjbar, M., De Reyck, B., & Kianfar, F. (2009). A hybrid scatter search for the discrete time\/resource trade-off problem in project scheduling. European Journal of Operational Research, 193(1), 35\u201348.","journal-title":"European Journal of Operational Research"},{"key":"404_CR21","doi-asserted-by":"crossref","unstructured":"Schutt, A., Feydy, T., Stuckey, P. J., & Wallace, M. (2011). Explaining the cumulative propagator. Constraints, 16(3), 173\u2013194.","DOI":"10.1007\/s10601-010-9103-2"},{"issue":"3","key":"404_CR22","doi-asserted-by":"crossref","first-page":"273","DOI":"10.1007\/s10951-012-0285-x","volume":"16","author":"A Schutt","year":"2013","unstructured":"Schutt, A., Feydy, T., Stuckey, P. J., & Wallace, M. (2013). Solving RCPSP\/max by lazy clause generation. Journal of Scheduling, 16(3), 273\u2013289.","journal-title":"Journal of Scheduling"},{"key":"404_CR23","first-page":"376","volume-title":"CPAIOR 2007 LNCS","author":"JM Akker van den","year":"2007","unstructured":"van den Akker, J. M., Diepen, G., & Hoogeveen, J. A. (2007). A column generation based destructive lower bound for resource constrained project scheduling problems. In P. Van Hentenryck & L. Wolsey (Eds.), CPAIOR 2007 LNCS (Vol. 4510, pp. 376\u2013390). Berlin: Springer."},{"key":"404_CR24","first-page":"294","volume-title":"CPAIOR 2009 LNCS","author":"P Vil\u00edm","year":"2009","unstructured":"Vil\u00edm, P. (2009). Max energy filtering algorithm for discrete cumulative resources. In W.-J. Van Hoeve & J. N. Hooker (Eds.), CPAIOR 2009 LNCS (Vol. 5547, pp. 294\u2013308). Berlin: Springer."},{"issue":"2","key":"404_CR25","doi-asserted-by":"crossref","first-page":"399","DOI":"10.1007\/s10589-010-9343-5","volume":"48","author":"G Walig\u00f3ra","year":"2011","unstructured":"Walig\u00f3ra, G. (2011). Heuristic approaches to discrete-continuous project scheduling problems to minimize the makespan. Computational Optimization and Applications, 48(2), 399\u2013421.","journal-title":"Computational Optimization and Applications"},{"key":"404_CR26","doi-asserted-by":"crossref","unstructured":"W\u0229glarz, J. (1981). Project scheduling with continuously-divisible, doubly constrained resources. Management Science, 27(9), 1040\u20131053.","DOI":"10.1287\/mnsc.27.9.1040"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-014-0404-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-014-0404-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-014-0404-y","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,8,17]],"date-time":"2019-08-17T21:48:42Z","timestamp":1566078522000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-014-0404-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,12,3]]},"references-count":26,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2015,6]]}},"alternative-id":["404"],"URL":"https:\/\/doi.org\/10.1007\/s10951-014-0404-y","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,12,3]]}}}