{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,9]],"date-time":"2026-04-09T14:35:18Z","timestamp":1775745318734,"version":"3.50.1"},"reference-count":69,"publisher":"Springer Science and Business Media LLC","issue":"5","license":[{"start":{"date-parts":[[2015,1,20]],"date-time":"2015-01-20T00:00:00Z","timestamp":1421712000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2015,10]]},"DOI":"10.1007\/s10951-015-0416-2","type":"journal-article","created":{"date-parts":[[2015,1,19]],"date-time":"2015-01-19T14:23:26Z","timestamp":1421677406000},"page":"471-486","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":25,"title":["A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines"],"prefix":"10.1007","volume":"18","author":[{"given":"Maliheh","family":"Aramon Bajestani","sequence":"first","affiliation":[]},{"given":"J. Christopher","family":"Beck","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2015,1,20]]},"reference":[{"key":"416_CR1","doi-asserted-by":"crossref","first-page":"534","DOI":"10.1016\/S0377-2217(03)00261-3","volume":"153","author":"R Aggoune","year":"2004","unstructured":"Aggoune, R. (2004). Minimizing the makespan for the flow shop scheduling problem with availability constraints. European Journal of Operational Research, 153, 534\u2013543.","journal-title":"European Journal of Operational Research"},{"key":"416_CR2","doi-asserted-by":"crossref","first-page":"3382","DOI":"10.1016\/j.ins.2008.05.007","volume":"178","author":"E Aghezzaf","year":"2008","unstructured":"Aghezzaf, E., & Najid, N. M. (2008). Integrated production planning and preventive maintenance in deteriorating production systems. Information Sciences, 178, 3382\u20133392.","journal-title":"Information Sciences"},{"key":"416_CR3","doi-asserted-by":"crossref","first-page":"784","DOI":"10.1016\/S0377-2217(03)00232-7","volume":"157","author":"MS Akturk","year":"2004","unstructured":"Akturk, M. S., Ghosh, J. B., & Gunes, E. D. (2004). Scheduling with tool changes to minimize total completion time: Basic results and SPT performance. European Journal of Operational Research, 157, 784\u2013790.","journal-title":"European Journal of Operational Research"},{"key":"416_CR4","doi-asserted-by":"crossref","first-page":"431","DOI":"10.1016\/j.cie.2004.09.002","volume":"47","author":"H Allaoui","year":"2004","unstructured":"Allaoui, H., & Artiba, A. (2004). Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints. Computers and Industrial Engineering, 47, 431\u2013450.","journal-title":"Computers and Industrial Engineering"},{"key":"416_CR5","doi-asserted-by":"crossref","first-page":"1399","DOI":"10.1016\/j.cor.2004.09.034","volume":"33","author":"H Allaoui","year":"2006","unstructured":"Allaoui, H., & Artiba, A. (2006). Scheduling two-stage hybrid flow shop with availability constraints. Computers and Operations Research, 33, 1399\u20131419.","journal-title":"Computers and Operations Research"},{"key":"416_CR6","doi-asserted-by":"crossref","first-page":"7377","DOI":"10.1080\/00207543.2014.931609","volume":"52","author":"M Aramon Bajestani","year":"2014","unstructured":"Aramon Bajestani, M., Banjevic, D., & Beck, J. C. (2014). Integrated maintenance planning and production scheduling with Markovian deteriorating machine conditions. International Journal of Production Research, 52, 7377\u20137400.","journal-title":"International Journal of Production Research"},{"key":"416_CR7","unstructured":"Aramon Bajestani, M., & Beck, J. C. (2012). Minimizing the number of late jobs in a flow shop with processing times dependent on maintenance. In Technical Report MIE-OR-TR2012-03, Department of Mechanical & Industrial Engineering, University of Toronto."},{"key":"416_CR8","doi-asserted-by":"crossref","first-page":"35","DOI":"10.1613\/jair.3902","volume":"47","author":"M Aramon Bajestani","year":"2013","unstructured":"Aramon Bajestani, M., & Beck, J. C. (2013). Scheduling a dynamic aircraft repair shop with limited repair resources. Journal of Artificial Intelligence Research, 47, 35\u201370.","journal-title":"Journal of Artificial Intelligence Research"},{"key":"416_CR9","doi-asserted-by":"crossref","unstructured":"Beck, J. C. (2010). Checking-up on branch-and-check. In Proceedings of the Sixteenth International Conference on Principles and Practice of Constraint Programming (CP2010) (pp. 84\u201398).","DOI":"10.1007\/978-3-642-15396-9_10"},{"key":"416_CR10","doi-asserted-by":"crossref","first-page":"183","DOI":"10.1613\/jair.2080","volume":"28","author":"JC Beck","year":"2007","unstructured":"Beck, J. C., & Wilson, N. (2007). Proactive algorithms for job shop scheduling with probabilistic durations. Journal of Artificial Intelligence Research, 28, 183\u2013232.","journal-title":"Journal of Artificial Intelligence Research"},{"key":"416_CR11","doi-asserted-by":"crossref","first-page":"238","DOI":"10.1007\/BF01386316","volume":"4","author":"J Benders","year":"1962","unstructured":"Benders, J. (1962). Partitioning procedures for solving mixed-variables programming problems. Numerische Mathematik, 4, 238\u2013252.","journal-title":"Numerische Mathematik"},{"key":"416_CR12","unstructured":"Blau, J. (2003). News analysis: Europe\u2019s semiconductor makers are back in the game. IEEE Specrnim Magazine, 18\u201319."},{"key":"416_CR13","doi-asserted-by":"crossref","first-page":"1035","DOI":"10.1057\/palgrave.jors.2602085","volume":"57","author":"G Budai","year":"2006","unstructured":"Budai, G., Huisman, D., & Dekker, R. (2006). Scheduling preventive railway maintenance activities. Journal of the Operational Research Society, 57, 1035\u20131044.","journal-title":"Journal of the Operational Research Society"},{"key":"416_CR14","doi-asserted-by":"crossref","first-page":"467","DOI":"10.1017\/S0269964803174037","volume":"17","author":"X Cai","year":"2003","unstructured":"Cai, X., Sun, A., & Zhou, X. (2003). Stochastic scheduling with preemptive-repeat machine breakdowns to minimize the expected weighted flow time. Probability in the Engineering and Information Sciences, 17, 467\u2013485.","journal-title":"Probability in the Engineering and Information Sciences"},{"key":"416_CR15","doi-asserted-by":"crossref","first-page":"800","DOI":"10.1002\/nav.20024","volume":"51","author":"X Cai","year":"2004","unstructured":"Cai, X., Sun, X., & Zhou, X. (2004). Stochastic scheduling subject to machine breakdowns: The preemptive-repeat model with discounted reward and other criteria. Naval Research Logistics, 51, 800\u2013817.","journal-title":"Naval Research Logistics"},{"key":"416_CR16","doi-asserted-by":"crossref","first-page":"1436","DOI":"10.1287\/opre.1120.1110","volume":"60","author":"X Cai","year":"2012","unstructured":"Cai, X., & Vairaktarakis, G. L. (2012). Coordination of outsourced operations at a third-party facility subject to booking, overtime, and tardiness costs. Operations Research, 60, 1436\u20131450.","journal-title":"Operations Research"},{"key":"416_CR17","doi-asserted-by":"crossref","first-page":"503","DOI":"10.1080\/07408170304416","volume":"35","author":"CR Cassady","year":"2003","unstructured":"Cassady, C. R., & Kutanoglu, E. (2003). Minimizing job tardiness using integrated preventive maintenance planning and production scheduling. IIE Transactions, 35, 503\u2013513.","journal-title":"IIE Transactions"},{"key":"416_CR18","doi-asserted-by":"crossref","first-page":"304","DOI":"10.1109\/TR.2005.845967","volume":"54","author":"CR Cassady","year":"2005","unstructured":"Cassady, C. R., & Kutanoglu, E. (2005). Integrating preventive maintenance planning and production scheduling for a single machine. IEEE Transactions on Reliability, 54, 304\u2013309.","journal-title":"IEEE Transactions on Reliability"},{"key":"416_CR19","doi-asserted-by":"crossref","first-page":"703","DOI":"10.1057\/palgrave.jors.2602043","volume":"57","author":"JS Chen","year":"2006","unstructured":"Chen, J. S. (2006). Single-machine scheduling with flexible and periodic maintenance. Journal of the Operational Research Society, 57, 703\u2013710.","journal-title":"Journal of the Operational Research Society"},{"key":"416_CR20","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/0377-2217(91)90141-H","volume":"51","author":"ID Cho","year":"1991","unstructured":"Cho, I. D., & Parlar, M. (1991). A survey of maintenance models for multi-unit systems. European Journal of Operational Research, 51, 1\u201323.","journal-title":"European Journal of Operational Research"},{"key":"416_CR21","doi-asserted-by":"crossref","first-page":"411","DOI":"10.1007\/BF01194788","volume":"45","author":"R Dekker","year":"1997","unstructured":"Dekker, R., Wildeman, R. E., & van der Duyn Schouten, F. A. (1997). A review of multi-component maintenance models with economic dependence. Mathematical Methods of Operations Research, 45, 411\u2013435.","journal-title":"Mathematical Methods of Operations Research"},{"key":"416_CR22","doi-asserted-by":"crossref","first-page":"74","DOI":"10.1016\/0377-2217(94)00363-7","volume":"91","author":"R Dekker","year":"1996","unstructured":"Dekker, R., Wildeman, R. E., & van Egmond, R. (1996). Joint replacement in an operational planning phase. European Journal of Operational Research, 91, 74\u201388.","journal-title":"European Journal of Operational Research"},{"key":"416_CR23","first-page":"399","volume":"24","author":"MM Fazel-Zarandi","year":"2011","unstructured":"Fazel-Zarandi, M. M., & Beck, J. C. (2011). Using logic-based Benders decomposition to solve the capacity- and distance-constrained plant location problem. INFORMS Journal on Computing, 24, 399\u2013415.","journal-title":"INFORMS Journal on Computing"},{"key":"416_CR24","doi-asserted-by":"crossref","first-page":"822","DOI":"10.1287\/mnsc.20.5.822","volume":"20","author":"AM Geoffrion","year":"1974","unstructured":"Geoffrion, A. M., & Graves, G. W. (1974). Multicommodity distribution system design by Benders decomposition. Management Science, 20, 822\u2013844.","journal-title":"Management Science"},{"key":"416_CR25","doi-asserted-by":"crossref","first-page":"783","DOI":"10.1016\/j.ejor.2004.11.013","volume":"172","author":"A Grigoriev","year":"2006","unstructured":"Grigoriev, A., van de Klundert, J., & Spieksma, F. C. R. (2006). Modeling and solving the periodic maintenance problem. European Journal of Operational Research, 172, 783\u2013797.","journal-title":"European Journal of Operational Research"},{"key":"416_CR26","doi-asserted-by":"crossref","first-page":"699","DOI":"10.1016\/j.ejor.2005.02.001","volume":"169","author":"JND Gupta","year":"2006","unstructured":"Gupta, J. N. D., & Stafford, E. F, Jr. (2006). Flowshop scheduling research after five decades. European Journal of Operational Research, 169, 699\u2013711.","journal-title":"European Journal of Operational Research"},{"key":"416_CR27","doi-asserted-by":"crossref","first-page":"395","DOI":"10.1504\/IJMOR.2011.040875","volume":"3","author":"LA Hadidi","year":"2011","unstructured":"Hadidi, L. A., Al-Turki, U. M., & Rahim, M. A. (2011). An integrated cost model for production scheduling and perfect maintenance. International Journal of Mathematics in Operational Research, 3, 395\u2013413.","journal-title":"International Journal of Mathematics in Operational Research"},{"key":"416_CR28","doi-asserted-by":"crossref","first-page":"21","DOI":"10.1504\/IJISE.2012.044042","volume":"10","author":"LA Hadidi","year":"2012","unstructured":"Hadidi, L. A., Al-Turki, U. M., & Rahim, M. A. (2012a). Integrated models in production planning and scheduling, maintenance and quality: A review. International Journal of Industrial and Systems Engineering, 10, 21\u201350.","journal-title":"International Journal of Industrial and Systems Engineering"},{"key":"416_CR29","doi-asserted-by":"crossref","first-page":"174","DOI":"10.1504\/IJOR.2012.045185","volume":"13","author":"LA Hadidi","year":"2012","unstructured":"Hadidi, L. A., Al-Turki, U. M., & Rahim, M. A. (2012b). Joint job scheduling and preventive maintenance on a single machine. International Journal of Operational Research, 13, 174\u2013184.","journal-title":"International Journal of Operational Research"},{"key":"416_CR30","doi-asserted-by":"crossref","first-page":"385","DOI":"10.1007\/s10601-005-2812-2","volume":"10","author":"J Hooker","year":"2005","unstructured":"Hooker, J. (2005). A hybrid method for planning and scheduling. Constraints, 10, 385\u2013401.","journal-title":"Constraints"},{"key":"416_CR31","doi-asserted-by":"crossref","first-page":"588","DOI":"10.1287\/opre.1060.0371","volume":"55","author":"J Hooker","year":"2007","unstructured":"Hooker, J. (2007). Planning and scheduling by logic-based Benders decomposition. Operations Research, 55, 588\u2013602.","journal-title":"Operations Research"},{"key":"416_CR32","doi-asserted-by":"crossref","first-page":"33","DOI":"10.1007\/s10107-003-0375-9","volume":"96","author":"J Hooker","year":"2003","unstructured":"Hooker, J., & Ottosson, G. (2003). Logic-based Benders decomposition. Mathematical Programming, 96, 33\u201360.","journal-title":"Mathematical Programming"},{"key":"416_CR33","unstructured":"Hooker, J., & Yan, H. (1995). Logic circuit verification by Benders decomposition. In V. Saraswat & P. Van Hentenryck (Eds.), Principles and Practice of Constraint Programming: The Newport Papers, Chap. 15 (pp. 267\u2013288). Cambridge, MA: MIT Press."},{"key":"416_CR34","doi-asserted-by":"crossref","first-page":"1764","DOI":"10.1016\/j.cor.2005.05.034","volume":"34","author":"M Ji","year":"2007","unstructured":"Ji, M., He, Y., & Cheng, T. C. E. (2007). Single machine scheduling with periodic maintenance to minimize makespan. Computers and Operations Research, 34, 1764\u20131770.","journal-title":"Computers and Operations Research"},{"key":"416_CR35","doi-asserted-by":"crossref","first-page":"675","DOI":"10.1007\/s10951-012-0287-8","volume":"16","author":"H Kellerer","year":"2013","unstructured":"Kellerer, H., Rustogi, K., & Strusevich, A. (2013). Approximation schemes for scheduling on a single machine subject to cumulative deterioration and maintenance. Journal of Scheduling, 16, 675\u2013683.","journal-title":"Journal of Scheduling"},{"key":"416_CR36","doi-asserted-by":"crossref","first-page":"1127","DOI":"10.1007\/s00170-012-4553-x","volume":"67","author":"BS Kim","year":"2013","unstructured":"Kim, B. S., & Ozturkoglu, Y. (2013). Scheduling a single machine with multiple preventive maintenance activities and position based deteriorations using genetic algorithms. International Journal of Advanced Manufacturing Technology, 67, 1127\u20131137.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"416_CR37","unstructured":"Kovacs, A., & Beck, J. C. (2007). Single-machine scheduling with tool changes: A constraint-based approach. In Proceedings of the 26th Workshop of the UK Planning and Scheduling Special Interest Group (pp. 71\u201378)."},{"key":"416_CR38","doi-asserted-by":"crossref","first-page":"548","DOI":"10.1109\/70.964657","volume":"17","author":"S Kumar","year":"2001","unstructured":"Kumar, S., & Kumar, P. R. (2001). Queueing network models in the design and analysis of semiconductor wafer fabs. IEEE Transactions on Robotics and Automation, 17, 548\u2013561.","journal-title":"IEEE Transactions on Robotics and Automation"},{"key":"416_CR39","doi-asserted-by":"crossref","first-page":"416","DOI":"10.1057\/palgrave.jors.2602363","volume":"59","author":"WH Kuo","year":"2008","unstructured":"Kuo, W. H., & Yang, D. L. (2008). Minimizing the makespan in a single-machine scheduling problem with the cyclic process of an aging effect. Journal of the Operational Research Society, 59, 416\u2013420.","journal-title":"Journal of the Operational Research Society"},{"key":"416_CR40","doi-asserted-by":"crossref","first-page":"602","DOI":"10.1002\/nav.20232","volume":"54","author":"Y Kuo","year":"2007","unstructured":"Kuo, Y., & Chang, Z. (2007). Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process. Naval Research Logistics, 54, 602\u2013614.","journal-title":"Naval Research Logistics"},{"key":"416_CR41","doi-asserted-by":"crossref","first-page":"395","DOI":"10.1007\/BF00121681","volume":"9","author":"CY Lee","year":"1996","unstructured":"Lee, C. Y. (1996). Machine scheduling with an availability constraint. Journal of Global Optimization, 9, 395\u2013416.","journal-title":"Journal of Global Optimization"},{"key":"416_CR42","doi-asserted-by":"crossref","first-page":"420","DOI":"10.1016\/S0377-2217(97)00452-9","volume":"114","author":"CY Lee","year":"1999","unstructured":"Lee, C. Y. (1999). Two-machine flow shop scheduling with availability constraints. European Journal of Operational Research, 114, 420\u2013429.","journal-title":"European Journal of Operational Research"},{"key":"416_CR43","volume-title":"Machine scheduling with availability constraints","author":"C-Y Lee","year":"2004","unstructured":"Lee, C.-Y. (2004). Handbook of scheduling: Algorithms, models and performance analysis. Machine scheduling with availability constraints. London: Chapman & Hall\/CRC."},{"key":"416_CR44","doi-asserted-by":"crossref","first-page":"119","DOI":"10.1016\/S0377-2217(99)00066-1","volume":"128","author":"CY Lee","year":"2001","unstructured":"Lee, C. Y., & Leon, V. J. (2001). Machine scheduling with a rate-modifying activity. European Journal of Operational Research, 128, 119\u2013128.","journal-title":"European Journal of Operational Research"},{"key":"416_CR45","first-page":"342","volume":"1","author":"JK Lenstra","year":"1977","unstructured":"Lenstra, J. K., Rinnooy Kan, A. H. G., & Brucker, P. (1977). Complexity of machine scheduling problems. Annals of Discrete Mathematics, 1, 342\u2013362.","journal-title":"Annals of Discrete Mathematics"},{"key":"416_CR46","doi-asserted-by":"crossref","first-page":"1335","DOI":"10.1016\/S0305-0548(02)00074-6","volume":"30","author":"CJ Liao","year":"2003","unstructured":"Liao, C. J., & Chen, W. J. (2003). Single-machine scheduling with periodic maintenance and non-resumable jobs. Computers and Operations Research, 30, 1335\u20131347.","journal-title":"Computers and Operations Research"},{"key":"416_CR47","doi-asserted-by":"crossref","first-page":"644","DOI":"10.1016\/j.ejor.2009.03.027","volume":"201","author":"EJ Lodree Jr","year":"2010","unstructured":"Lodree, E. J, Jr, & Geiger, C. D. (2010). A note on the optimal sequence position for a rate-modifying activity under simple linear deterioration. European Journal of Operational Research, 201, 644\u2013648.","journal-title":"European Journal of Operational Research"},{"key":"416_CR48","doi-asserted-by":"crossref","first-page":"199","DOI":"10.1016\/j.cie.2009.04.014","volume":"58","author":"Y Ma","year":"2010","unstructured":"Ma, Y., & Chu, C. (2010). A survey of scheduling with deterministic machine availability constraints. Computers and Industrial Engineering, 58, 199\u2013211.","journal-title":"Computers and Industrial Engineering"},{"key":"416_CR49","doi-asserted-by":"crossref","first-page":"493","DOI":"10.1287\/mnsc.11.5.493","volume":"11","author":"JJ McCall","year":"1965","unstructured":"McCall, J. J. (1965). Maintenance policies for stochastically failing equipment. Management Science, 11, 493\u2013524.","journal-title":"Management Science"},{"key":"416_CR50","doi-asserted-by":"crossref","first-page":"583","DOI":"10.1007\/s10951-010-0222-9","volume":"14","author":"L M\u00f6nch","year":"2011","unstructured":"M\u00f6nch, L., Fowler, J. W., Dauz\u00e9re-P\u00e8r\u00e9s, S., Mason, S. J., & Rose, O. (2011). A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations. Journal of Scheduling, 14, 583\u2013599.","journal-title":"Journal of Scheduling"},{"key":"416_CR51","doi-asserted-by":"crossref","first-page":"2541","DOI":"10.1016\/j.cor.2008.10.007","volume":"36","author":"G Mosheiov","year":"2009","unstructured":"Mosheiov, G., & Sarig, A. (2009). Scheduling a maintenance activity and due-window assignment on a single machine. Computers and Operations Research, 36, 2541\u20132545.","journal-title":"Computers and Operations Research"},{"key":"416_CR52","doi-asserted-by":"crossref","first-page":"882","DOI":"10.1057\/jors.2009.5","volume":"61","author":"G Mosheiov","year":"2010","unstructured":"Mosheiov, G., & Sidney, J. B. (2010). Scheduling a deteriorating maintenance activity on a single machine. Journal of the Operational Research Society, 61, 882\u2013887.","journal-title":"Journal of the Operational Research Society"},{"key":"416_CR53","doi-asserted-by":"crossref","unstructured":"Naderi, B., Zandieh, M., & Fatemi Ghomi, S. M. T. (2009). A study on integrating sequence dependent setup time flexible flow lines and preventive maintenance scheduling. Journal of Intelligent Manufacturing, 20, 683\u2013694.","DOI":"10.1007\/s10845-008-0157-6"},{"key":"416_CR54","doi-asserted-by":"crossref","unstructured":"Nicolai, R. P., & Dekker, R. (2008). Optimal maintenance of multi-component systems: A review. Complex system maintenance handbook. Berlin: Springer Series in Reliability Engineering.","DOI":"10.1007\/978-1-84800-011-7_11"},{"key":"416_CR55","volume-title":"Scheduling, theory, algorithms, and systems","author":"M Pinedo","year":"2002","unstructured":"Pinedo, M. (2002). Scheduling, theory, algorithms, and systems (2nd ed.). New Jersey: Prentice Hall.","edition":"2"},{"key":"416_CR56","volume-title":"Complex system maintenance handbook","author":"L Pintelon","year":"2008","unstructured":"Pintelon, L., & Parodi-Herz, A. (2008). Maintenance: An evolutionary perspective. Complex system maintenance handbook. Berlin: Springer Series in Reliability Engineering."},{"key":"416_CR57","unstructured":"Ram\u00edez-Hern\u00e1ndez, J. A., & Fern\u00e1ndez-Gaucherand, E. (2003). An algorithm to convert wafer to calendar-based preventive maintenance schedules for semiconductor manufacturing systems. In Proceedings of the 42nd IEEE Conference on Decision and Control (pp. 5926\u20135931)."},{"key":"416_CR58","doi-asserted-by":"crossref","first-page":"3314","DOI":"10.1016\/j.cor.2005.12.007","volume":"34","author":"R Ruiz","year":"2007","unstructured":"Ruiz, R., Garc\u00eda-D\u00edaz, J. C., & Maroto, C. (2007). Considering scheduling and preventive maintenance in the flowshop sequencing problem. Computers and Operations Research, 34, 3314\u20133330.","journal-title":"Computers and Operations Research"},{"key":"416_CR59","doi-asserted-by":"crossref","unstructured":"Rustogi, K., & Strusevich, A. (2012). Single machine scheduling with general positional deterioration and rate-modifying maintenance. Omega, 40, 791\u2013804.","DOI":"10.1016\/j.omega.2011.12.007"},{"key":"416_CR60","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0377-2217(98)00367-1","volume":"121","author":"G Schmidt","year":"2000","unstructured":"Schmidt, G. (2000). Scheduling with limited machine availability. European Journal of Operational Research, 121, 1\u201315.","journal-title":"European Journal of Operational Research"},{"key":"416_CR61","doi-asserted-by":"crossref","first-page":"521","DOI":"10.1016\/j.ejor.2011.07.053","volume":"216","author":"D Shabtay","year":"2012","unstructured":"Shabtay, D. (2012). The just-in-time scheduling problem in a flowshop scheduling system. European Journal of Operational Research, 216, 521\u2013532.","journal-title":"European Journal of Operational Research"},{"key":"416_CR62","doi-asserted-by":"crossref","first-page":"647","DOI":"10.1057\/palgrave.jors.2601725","volume":"55","author":"TW Sloan","year":"2004","unstructured":"Sloan, T. W. (2004). A periodic review production and maintenance model with random demand, deteriorating equipment, and binomial yield. Journal of Operational Research Society, 55, 647\u2013656.","journal-title":"Journal of Operational Research Society"},{"key":"416_CR63","doi-asserted-by":"crossref","first-page":"117","DOI":"10.1002\/nav.20270","volume":"55","author":"TW Sloan","year":"2008","unstructured":"Sloan, T. W. (2008). Simultaneous determination of production and maintenance schedules using in-line equipment condition and yield information. Naval Research Logistics, 55, 117\u2013129.","journal-title":"Naval Research Logistics"},{"key":"416_CR64","doi-asserted-by":"crossref","first-page":"47","DOI":"10.1080\/07408179208964233","volume":"24","author":"R Uzsoy","year":"1992","unstructured":"Uzsoy, R., Lee, C. Y., & Martin-Vega, L. A. (1992). A review of production planning and scheduling models in semiconductor industry, Part I: System characteristics, performance evaluation and production planning. IIE Transactions, 24, 47\u201360.","journal-title":"IIE Transactions"},{"key":"416_CR65","doi-asserted-by":"crossref","first-page":"469","DOI":"10.1016\/S0377-2217(01)00197-7","volume":"139","author":"H Wang","year":"2002","unstructured":"Wang, H. (2002). A survey of maintenance policies of deteriorating systems. European Journal of Operational Research, 139, 469\u2013489.","journal-title":"European Journal of Operational Research"},{"key":"416_CR66","doi-asserted-by":"crossref","first-page":"443","DOI":"10.1007\/s10951-010-0182-0","volume":"13","author":"D Xu","year":"2010","unstructured":"Xu, D., Yin, Y., & Li, H. (2010). Scheduling jobs under increasing linear machine maintenance time. Journal of Scheduling, 13, 443\u2013449.","journal-title":"Journal of Scheduling"},{"key":"416_CR67","doi-asserted-by":"crossref","first-page":"528","DOI":"10.1016\/j.omega.2010.01.003","volume":"38","author":"SJ Yang","year":"2010","unstructured":"Yang, S. J., & Yang, D. L. (2010). Minimizing the makespan on single-machine scheduling with aging effects and variable maintenance activities. Omega, 38, 528\u2013533.","journal-title":"Omega"},{"key":"416_CR68","doi-asserted-by":"crossref","first-page":"345","DOI":"10.1109\/TSM.2004.831948","volume":"17","author":"X Yao","year":"2004","unstructured":"Yao, X., Fern\u00e1ndez-Gaucherand, E., Fu, M. C., & Marcus, S. I. (2004). Optimal preventive maintenance scheduling in semiconductor manufacturing. IEEE Transactions on Semiconductor Manufacturing, 17, 345\u2013356.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"416_CR69","doi-asserted-by":"crossref","first-page":"263","DOI":"10.1007\/s10951-013-0350-0","volume":"17","author":"X Yu","year":"2014","unstructured":"Yu, X., Zhang, Y., & Steiner, G. (2014). Single-machine scheduling with periodic maintenance to minimize makespan revisited. Journal of Scheduling, 17, 263\u2013270.","journal-title":"Journal of Scheduling"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-015-0416-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-015-0416-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-015-0416-2","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,8,19]],"date-time":"2019-08-19T21:02:53Z","timestamp":1566248573000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-015-0416-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,1,20]]},"references-count":69,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2015,10]]}},"alternative-id":["416"],"URL":"https:\/\/doi.org\/10.1007\/s10951-015-0416-2","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,1,20]]}}}