{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,7]],"date-time":"2025-10-07T14:33:30Z","timestamp":1759847610396},"reference-count":39,"publisher":"Springer Science and Business Media LLC","issue":"5","license":[{"start":{"date-parts":[[2015,6,2]],"date-time":"2015-06-02T00:00:00Z","timestamp":1433203200000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by\/4.0"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2015,10]]},"DOI":"10.1007\/s10951-015-0432-2","type":"journal-article","created":{"date-parts":[[2015,6,1]],"date-time":"2015-06-01T09:37:53Z","timestamp":1433151473000},"page":"497-511","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":7,"title":["Decentralized subcontractor scheduling with divisible jobs"],"prefix":"10.1007","volume":"18","author":[{"given":"Behzad","family":"Hezarkhani","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Wies\u0142aw","family":"Kubiak","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2015,6,2]]},"reference":[{"issue":"12","key":"432_CR1","doi-asserted-by":"crossref","first-page":"1469","DOI":"10.1080\/00207728108963831","volume":"12","author":"EJ Anderson","year":"1981","unstructured":"Anderson, E. J. (1981). A new continuous model for job\u2013shop scheduling. International Journal of System Science, 12(12), 1469\u20131475.","journal-title":"International Journal of System Science"},{"issue":"2","key":"432_CR2","doi-asserted-by":"crossref","first-page":"236","DOI":"10.1287\/msom.1090.0265","volume":"12","author":"T Aydinliyim","year":"2010","unstructured":"Aydinliyim, T., & Vairaktarakis, G. L. (2010). Coordination of outsourced operations to minimize weighted flow time and capacity booking costs. Manufacturing & Service Operations Management, 12(2), 236\u2013255.","journal-title":"Manufacturing & Service Operations Management"},{"key":"432_CR3","doi-asserted-by":"crossref","unstructured":"Aydinliyim, T., & Vairaktarakis, G. L. (2011). Planning production and inventories in the extended enterprise, chap Sequencing Strategies and Coordination Issues in Outsourcing and Subcontracting Operations, Springer, pp 269\u2013319.","DOI":"10.1007\/978-1-4419-6485-4_12"},{"key":"432_CR4","volume-title":"Scheduling divisible loads in parallel and distributed systems","author":"V Bharadwaj","year":"1996","unstructured":"Bharadwaj, V., Ghose, D., Mani, V., & Robertazzi, T. (1996). Scheduling divisible loads in parallel and distributed systems. Los Alamitos: IEEE Computer Society Press."},{"issue":"3","key":"432_CR5","doi-asserted-by":"crossref","first-page":"263","DOI":"10.1287\/msom.1070.0152","volume":"9","author":"Y Bukchin","year":"2007","unstructured":"Bukchin, Y., & Hanany, E. (2007). Decentralization cost in scheduling: A game-theoretic approach. Manufacturing & Service Operations Management, 9(3), 263\u2013275.","journal-title":"Manufacturing & Service Operations Management"},{"issue":"6","key":"432_CR6","doi-asserted-by":"crossref","first-page":"1436","DOI":"10.1287\/opre.1120.1110","volume":"60","author":"X Cai","year":"2012","unstructured":"Cai, X., & Vairaktarakis, G. L. (2012). Coordination of outsourced operations at a third-party facility subject to booking, overtime, and tardiness costs. Operations Research, 60(6), 1436\u20131450.","journal-title":"Operations Research"},{"issue":"4","key":"432_CR7","doi-asserted-by":"crossref","first-page":"675","DOI":"10.1016\/j.jcss.2004.04.012","volume":"69","author":"N Chen","year":"2004","unstructured":"Chen, N., Deng, X., & Sun, X. (2004). On complexity of single-minded auction. Journal of Computer and System Sciences, 69(4), 675\u2013687.","journal-title":"Journal of Computer and System Sciences"},{"issue":"12","key":"432_CR8","doi-asserted-by":"crossref","first-page":"1171","DOI":"10.1080\/07408170801975057","volume":"40","author":"Z Chen","year":"2008","unstructured":"Chen, Z., & Li, C. (2008). Scheduling with subcontracting options. IIE Transactions, 40(12), 1171\u20131184.","journal-title":"IIE Transactions"},{"key":"432_CR9","doi-asserted-by":"crossref","unstructured":"Christodoulou, G., Koutsoupias, E., & Nanavati, A. (2004). Coordination mechanisms. In Automata, languages and programming, Springer (pp. 345\u2013357).","DOI":"10.1007\/978-3-540-27836-8_31"},{"issue":"1","key":"432_CR10","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1007\/BF01726210","volume":"11","author":"E Clarke","year":"1971","unstructured":"Clarke, E. (1971). Multipart pricing of public goods. Public Choice, 11(1), 17\u201333.","journal-title":"Public Choice"},{"issue":"3","key":"432_CR11","doi-asserted-by":"crossref","first-page":"344","DOI":"10.1016\/0377-2217(89)90427-X","volume":"40","author":"I Curiel","year":"1989","unstructured":"Curiel, I., Pederzoli, G., & Tijs, S. (1989). Sequencing games. European Journal of Operational Research, 40(3), 344\u2013351.","journal-title":"European Journal of Operational Research"},{"key":"432_CR12","doi-asserted-by":"crossref","unstructured":"Curiel, I., Hamers, H., & Klijn, F. (2004). Sequencing games: a survey. In Chapters in game theory (pp. 27\u201350). US: Springer.","DOI":"10.1007\/0-306-47526-X_2"},{"key":"432_CR13","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-84882-310-5","volume-title":"Scheduling for parallel processing","author":"M Drozdowski","year":"2009","unstructured":"Drozdowski, M. (2009). Scheduling for parallel processing. London: Springer."},{"issue":"1","key":"432_CR14","first-page":"45","volume":"7","author":"D Foley","year":"1967","unstructured":"Foley, D. (1967). Resource allocation and the public sector. Yale Economic Essays, 7(1), 45\u201398.","journal-title":"Yale Economic Essays"},{"key":"432_CR15","doi-asserted-by":"crossref","unstructured":"Green, J., & Laffont, J. (1977). Characterization of satisfactory mechanisms for the revelation of preferences for public goods. Econometrica, 45(2), 427\u2013438.","DOI":"10.2307\/1911219"},{"key":"432_CR16","doi-asserted-by":"crossref","first-page":"617","DOI":"10.2307\/1914085","volume":"41","author":"T Groves","year":"1973","unstructured":"Groves, T. (1973). Incentives in teams. Econometrica, 41, 617\u2013631.","journal-title":"Econometrica"},{"issue":"4","key":"432_CR17","doi-asserted-by":"crossref","first-page":"437","DOI":"10.1111\/j.1937-5956.2007.tb00271.x","volume":"16","author":"B Heydenreich","year":"2007","unstructured":"Heydenreich, B., Muller, R., & Uetz, M. (2007). Games and mechanism design in machine schedulingan introduction. Production and Operations Management, 16(4), 437\u2013454.","journal-title":"Production and Operations Management"},{"key":"432_CR18","doi-asserted-by":"crossref","unstructured":"Immorlica, N., Li, L., Mirrokni, V.S., & Schulz, A. (2005). Coordination mechanisms for selfish scheduling. In Internet and network economics, Springer, pp 55\u201369.","DOI":"10.1007\/11600930_7"},{"key":"432_CR19","unstructured":"Jackson, M. (2000). Encyclopedia of life support systems, chap Mechanism theory, London: EOLSS Publishers."},{"issue":"11","key":"432_CR20","doi-asserted-by":"crossref","first-page":"1352","DOI":"10.1287\/mnsc.36.11.1352","volume":"36","author":"MI Kamien","year":"1990","unstructured":"Kamien, M. I., & Li, L. (1990). Subcontracting, coordination, flexibility, and production smoothing in aggregate planning. Management Science, 36(11), 1352\u20131363.","journal-title":"Management Science"},{"key":"432_CR21","doi-asserted-by":"crossref","unstructured":"Koutsoupias, E., & Papadimitriou, C. (1999). Worst-case equilibria. In STACS 99, Springer, pp 404\u2013413.","DOI":"10.1007\/3-540-49116-3_38"},{"issue":"9","key":"432_CR22","first-page":"813","volume":"31","author":"E Kutanoglu","year":"1999","unstructured":"Kutanoglu, E., & Wu, S. (1999). On combinatorial auction and lagrangean relaxation for distributed resource scheduling. IIE Transactions, 31(9), 813\u2013826.","journal-title":"IIE Transactions"},{"issue":"2","key":"432_CR23","doi-asserted-by":"crossref","first-page":"623","DOI":"10.1016\/j.ijpe.2007.02.036","volume":"111","author":"I Lee","year":"2008","unstructured":"Lee, I., & Sung, C. (2008). Single machine scheduling with outsourcing allowed. International Journal of Production Economics, 111(2), 623\u2013634.","journal-title":"International Journal of Production Economics"},{"issue":"1","key":"432_CR24","doi-asserted-by":"crossref","first-page":"53","DOI":"10.1016\/0047-2727(86)90071-X","volume":"31","author":"H Moulin","year":"1986","unstructured":"Moulin, H. (1986). Characterizations of the pivotal mechanism. Journal of Public Economics, 31(1), 53\u201378.","journal-title":"Journal of Public Economics"},{"key":"432_CR25","doi-asserted-by":"crossref","unstructured":"Nisan, N. (2007). Algorithmic game theory, chap Introduction to mechanism design (for computer scientists), Cambridge University Press, pp 209\u2013242.","DOI":"10.1017\/CBO9780511800481.011"},{"key":"432_CR26","doi-asserted-by":"crossref","first-page":"19","DOI":"10.1613\/jair.2046","volume":"29","author":"N Nisan","year":"2007","unstructured":"Nisan, N., & Ronen, A. (2007). Computationally feasible VCG mechanisms. Journal of Artificial Intelligence Research, 29, 19\u201347.","journal-title":"Journal of Artificial Intelligence Research"},{"key":"432_CR27","unstructured":"Parkes, D.C., & Shneidman, J. (2004). Distributed implementations of Vickery\u2013Clarke\u2013Groves mechanisms. In Proceedings of the Third International Joint Conference on Autonomous Agents and Multiagent Systems, 2004. AAMAS 2004, pp. 261\u2013268."},{"key":"432_CR28","unstructured":"Parmigiani, A.E. (2003). Concurrent sourcing: When do firms both make and buy? PhD thesis, University of Michigan."},{"issue":"6","key":"432_CR29","first-page":"773","volume":"15","author":"X Qi","year":"2012","unstructured":"Qi, X. (2012). Production scheduling with subcontracting: The subcontractors pricing game. Journal of Scheduling, 15(6), 773\u2013781.","journal-title":"Journal of Scheduling"},{"issue":"1\u20132","key":"432_CR30","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1002\/nav.3800030106","volume":"3","author":"W Smith","year":"1956","unstructured":"Smith, W. (1956). Various optimizers for single-stage production. Naval Research Logistics Quarterly, 3(1\u20132), 59\u201366.","journal-title":"Naval Research Logistics Quarterly"},{"issue":"1","key":"432_CR31","doi-asserted-by":"crossref","first-page":"193","DOI":"10.1007\/BF02499133","volume":"2","author":"J Suijs","year":"1996","unstructured":"Suijs, J. (1996). On incentive compatibility and budget balancedness in public decision making. Review of Economic Design, 2(1), 193\u2013209.","journal-title":"Review of Economic Design"},{"issue":"1","key":"432_CR32","doi-asserted-by":"crossref","first-page":"205","DOI":"10.1023\/B:ANOR.0000011192.23903.7f","volume":"125","author":"B Tan","year":"2004","unstructured":"Tan, B., & Gershwin, S. (2004). Production and subcontracting strategies for manufacturers with limited capacity and volatile demand. Annals of Operations Research, 125(1), 205\u2013232.","journal-title":"Annals of Operations Research"},{"issue":"5","key":"432_CR33","doi-asserted-by":"crossref","first-page":"633","DOI":"10.1080\/00343400500151913","volume":"39","author":"E Taymaz","year":"2005","unstructured":"Taymaz, E., & Kili\u00e7aslan, Y. (2005). Determinants of subcontracting and regional development: An empirical study on turkish textile and engineering industries. Regional Studies, 39(5), 633\u2013645.","journal-title":"Regional Studies"},{"issue":"1","key":"432_CR34","doi-asserted-by":"crossref","first-page":"148","DOI":"10.1287\/msom.1120.0410","volume":"15","author":"GL Vairaktarakis","year":"2013","unstructured":"Vairaktarakis, G. L. (2013). Noncooperative games for subcontracting operations. Manufacturing & Service Operations Management, 15(1), 148\u2013158.","journal-title":"Manufacturing & Service Operations Management"},{"key":"432_CR35","unstructured":"Vairaktarakis, G.L., & Aydinliyim, T. (2007). Centralization versus competition in subcontracting operations, technical Memorandum Number 819, Case Western Reserve University."},{"issue":"7","key":"432_CR36","doi-asserted-by":"crossref","first-page":"954","DOI":"10.1287\/mnsc.45.7.954","volume":"45","author":"J Mieghem Van","year":"1999","unstructured":"Van Mieghem, J. (1999). Coordinating investment, production, and subcontracting. Management Science, 45(7), 954\u2013971.","journal-title":"Management Science"},{"issue":"1","key":"432_CR37","doi-asserted-by":"crossref","first-page":"8","DOI":"10.1111\/j.1540-6261.1961.tb02789.x","volume":"16","author":"W Vickrey","year":"1961","unstructured":"Vickrey, W. (1961). Counterspeculation, auctions, and competitive sealed tenders. The Journal of finance, 16(1), 8\u201337.","journal-title":"The Journal of finance"},{"issue":"9","key":"432_CR38","doi-asserted-by":"crossref","first-page":"827","DOI":"10.1108\/01443579710171055","volume":"17","author":"M Webster","year":"1997","unstructured":"Webster, M., Alder, C., & Muhlemann, A. (1997). Subcontracting within the supply chain for electronics assembly manufacture. International Journal of Operations & Production Management, 17(9), 827\u2013841.","journal-title":"International Journal of Operations & Production Management"},{"issue":"1\u20132","key":"432_CR39","doi-asserted-by":"crossref","first-page":"271","DOI":"10.1006\/game.2000.0822","volume":"35","author":"M Wellman","year":"2001","unstructured":"Wellman, M., Walsh, W., Wurman, P., & MacKie-Mason, J. (2001). Auction protocols for decentralized scheduling. Games and Economic Behavior, 35(1\u20132), 271\u2013303.","journal-title":"Games and Economic Behavior"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-015-0432-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-015-0432-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-015-0432-2","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,8,25]],"date-time":"2019-08-25T22:30:28Z","timestamp":1566772228000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-015-0432-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,6,2]]},"references-count":39,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2015,10]]}},"alternative-id":["432"],"URL":"https:\/\/doi.org\/10.1007\/s10951-015-0432-2","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,6,2]]}}}