{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,6]],"date-time":"2026-03-06T08:28:23Z","timestamp":1772785703423,"version":"3.50.1"},"reference-count":23,"publisher":"Springer Science and Business Media LLC","issue":"5","license":[{"start":{"date-parts":[[2015,6,10]],"date-time":"2015-06-10T00:00:00Z","timestamp":1433894400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2016,10]]},"DOI":"10.1007\/s10951-015-0436-y","type":"journal-article","created":{"date-parts":[[2015,6,11]],"date-time":"2015-06-11T08:03:04Z","timestamp":1434009784000},"page":"563-582","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":37,"title":["A reclaimer scheduling problem arising in coal stockyard management"],"prefix":"10.1007","volume":"19","author":[{"given":"Enrico","family":"Angelelli","sequence":"first","affiliation":[]},{"given":"Thomas","family":"Kalinowski","sequence":"additional","affiliation":[]},{"given":"Reena","family":"Kapoor","sequence":"additional","affiliation":[]},{"given":"Martin W. P.","family":"Savelsbergh","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2015,6,10]]},"reference":[{"issue":"4","key":"436_CR1","doi-asserted-by":"crossref","first-page":"345","DOI":"10.1007\/s10951-009-0105-0","volume":"12","author":"C Bierwirth","year":"2009","unstructured":"Bierwirth, C., & Meisel, F. (2009). A fast heuristic for quay crane scheduling with interference constraints. Journal of Scheduling, 12(4), 345\u2013360.","journal-title":"Journal of Scheduling"},{"issue":"3","key":"436_CR2","doi-asserted-by":"crossref","first-page":"615","DOI":"10.1016\/j.ejor.2009.05.031","volume":"202","author":"C Bierwirth","year":"2010","unstructured":"Bierwirth, C., & Meisel, F. (2010). A survey of berth allocation and quay crane scheduling problems in container terminals. European Journal of Operational Research, 202(3), 615\u2013627.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"436_CR3","doi-asserted-by":"crossref","first-page":"197","DOI":"10.1007\/s13676-012-0011-z","volume":"1","author":"N Boland","year":"2012","unstructured":"Boland, N., Gulczynski, D., & Savelsbergh, M. (2012). A stockyard planning problem. EURO Journal on Transportation and Logistics, 1(3), 197\u2013236.","journal-title":"EURO Journal on Transportation and Logistics"},{"issue":"3","key":"436_CR4","doi-asserted-by":"crossref","first-page":"159","DOI":"10.1016\/0191-2615(89)90001-5","volume":"23","author":"CF Daganzo","year":"1989","unstructured":"Daganzo, C. F. (1989). The crane scheduling problem. Transportation Research Part B, 23(3), 159\u2013175.","journal-title":"Transportation Research Part B"},{"issue":"11","key":"436_CR5","doi-asserted-by":"crossref","first-page":"1047","DOI":"10.1080\/0951192X.2012.684707","volume":"25","author":"D Hu","year":"2012","unstructured":"Hu, D., & Yao, Z. (2012). Stacker-reclaimer scheduling in a dry bulk terminal. International Journal of Computer Integrated Manufacturing, 25(11), 1047\u20131058.","journal-title":"International Journal of Computer Integrated Manufacturing"},{"issue":"3","key":"436_CR6","doi-asserted-by":"crossref","first-page":"752","DOI":"10.1016\/S0377-2217(03)00133-4","volume":"156","author":"KH Kim","year":"2004","unstructured":"Kim, K. H., & Park, Y.-M. (2004). A crane scheduling method for port container terminals. European Journal of Operational Research, 156(3), 752\u2013768.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"436_CR7","first-page":"425","volume":"59","author":"KY Kim","year":"1999","unstructured":"Kim, K. Y., & Kim, K. H. (1999). A routing algorithm for a single straddle carrier to load export containers onto a containership. International Journal of Production Economics, 59(1), 425\u2013433.","journal-title":"International Journal of Production Economics"},{"issue":"5","key":"436_CR8","doi-asserted-by":"crossref","first-page":"498","DOI":"10.1002\/nav.10076","volume":"50","author":"KY Kim","year":"2003","unstructured":"Kim, K. Y., & Kim, K. H. (2003). Heuristic algorithms for routing yard-side equipment for minimizing loading times in container terminals. Naval Research Logistics (NRL), 50(5), 498\u2013514.","journal-title":"Naval Research Logistics (NRL)"},{"issue":"9","key":"436_CR9","doi-asserted-by":"crossref","first-page":"2063","DOI":"10.1016\/j.cor.2011.09.025","volume":"39","author":"P Legato","year":"2012","unstructured":"Legato, P., Trunfio, R., & Meisel, F. (2012). Modeling and solving rich quay crane scheduling problems. Computers & Operations Research, 39(9), 2063\u20132078.","journal-title":"Computers & Operations Research"},{"issue":"2","key":"436_CR10","doi-asserted-by":"crossref","first-page":"115","DOI":"10.1002\/nav.20189","volume":"54","author":"A Lim","year":"2007","unstructured":"Lim, A., Rodrigues, B., & Xu, Z. (2007). A m-parallel crane scheduling problem with a non-crossing constraint. Naval Research Logistics (NRL), 54(2), 115\u2013127.","journal-title":"Naval Research Logistics (NRL)"},{"issue":"1","key":"436_CR11","doi-asserted-by":"crossref","first-page":"60","DOI":"10.1002\/nav.20108","volume":"53","author":"J Liu","year":"2006","unstructured":"Liu, J., Wan, Y.-W., & Wang, L. (2006). Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures. Naval Research Logistics (NRL), 53(1), 60\u201374.","journal-title":"Naval Research Logistics (NRL)"},{"issue":"1","key":"436_CR12","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1002\/nav.20121","volume":"53","author":"L Moccia","year":"2006","unstructured":"Moccia, L., Cordeau, J.-F., Gaudioso, M., & Laporte, G. (2006). A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal. Naval Research Logistics (NRL), 53(1), 45\u201359.","journal-title":"Naval Research Logistics (NRL)"},{"issue":"1","key":"436_CR13","doi-asserted-by":"crossref","first-page":"64","DOI":"10.1016\/j.ejor.2003.11.025","volume":"164","author":"W Ng","year":"2005","unstructured":"Ng, W. (2005). Crane scheduling in container yards with inter-crane interference. European Journal of Operational Research, 164(1), 64\u201378.","journal-title":"European Journal of Operational Research"},{"issue":"8","key":"436_CR14","doi-asserted-by":"crossref","first-page":"867","DOI":"10.1080\/03052150500323849","volume":"37","author":"WC Ng","year":"2005","unstructured":"Ng, W. C., & Mak, K. L. (2005a). An effective heuristic for scheduling a yard crane to handle jobs with different ready times. Engineering Optimization, 37(8), 867\u2013877.","journal-title":"Engineering Optimization"},{"issue":"3","key":"436_CR15","doi-asserted-by":"crossref","first-page":"263","DOI":"10.1016\/j.apm.2004.09.009","volume":"29","author":"WC Ng","year":"2005","unstructured":"Ng, W. C., & Mak, K. L. (2005b). Yard crane scheduling in port container terminals. Applied Mathematical Modelling, 29(3), 263\u2013276.","journal-title":"Applied Mathematical Modelling"},{"issue":"6","key":"436_CR16","doi-asserted-by":"crossref","first-page":"723","DOI":"10.1080\/03052150600691038","volume":"38","author":"WC Ng","year":"2006","unstructured":"Ng, W. C., & Mak, K. L. (2006). Quay crane scheduling in container terminals. Engineering Optimization, 38(6), 723\u2013737.","journal-title":"Engineering Optimization"},{"issue":"4","key":"436_CR17","doi-asserted-by":"crossref","first-page":"591","DOI":"10.1016\/j.tre.2008.11.004","volume":"45","author":"ME Petering","year":"2009","unstructured":"Petering, M. E. (2009). Effect of block width and storage yard layout on marine container terminal performance. Transportation Research Part E, 45(4), 591\u2013610.","journal-title":"Transportation Research Part E"},{"issue":"3","key":"436_CR18","doi-asserted-by":"crossref","first-page":"159","DOI":"10.1016\/0191-2615(90)90014-P","volume":"24","author":"RI Peterkofsky","year":"1990","unstructured":"Peterkofsky, R. I., & Daganzo, C. F. (1990). A branch and bound solution method for the crane scheduling problem. Transportation Research Part B, 24(3), 159\u2013172.","journal-title":"Transportation Research Part B"},{"issue":"2","key":"436_CR19","doi-asserted-by":"crossref","first-page":"212","DOI":"10.1287\/mnsc.36.2.212","volume":"36","author":"HN Psaraftis","year":"1990","unstructured":"Psaraftis, H. N., Solomon, M. M., Magnanti, T. L., & Kim, T.-U. (1990). Routing and scheduling on a shoreline with release times. Management Science, 36(2), 212\u2013223.","journal-title":"Management Science"},{"key":"436_CR20","doi-asserted-by":"crossref","unstructured":"D. Sun, L. Tang, Benders approach for the raw material transportation scheduling problem in steel industry, in 2013 10th IEEE International Conference on Control and Automation (ICCA), pp. 481\u2013484","DOI":"10.1109\/ICCA.2013.6565191"},{"issue":"3","key":"436_CR21","doi-asserted-by":"crossref","first-page":"263","DOI":"10.1002\/net.3230220305","volume":"22","author":"JN Tsitsiklis","year":"1992","unstructured":"Tsitsiklis, J. N. (1992). Special cases of traveling salesman and repairman problems with time windows. Networks, 22(3), 263\u2013282.","journal-title":"Networks"},{"issue":"6","key":"436_CR22","doi-asserted-by":"crossref","first-page":"537","DOI":"10.1016\/S0191-2615(01)00017-0","volume":"36","author":"C Zhang","year":"2002","unstructured":"Zhang, C., Wan, Y.-W., Liu, J., & Linn, R. J. (2002). Dynamic crane deployment in container storage yards. Transportation Research Part B, 36(6), 537\u2013555.","journal-title":"Transportation Research Part B"},{"issue":"12","key":"436_CR23","doi-asserted-by":"crossref","first-page":"1464","DOI":"10.1057\/palgrave.jors.2602110","volume":"57","author":"Y Zhu","year":"2006","unstructured":"Zhu, Y., & Lim, A. (2006). Crane scheduling with non-crossing constraint. The Journal of the Operational Research Society, 57(12), 1464\u20131471.","journal-title":"The Journal of the Operational Research Society"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-015-0436-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-015-0436-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-015-0436-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-015-0436-y","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T09:39:51Z","timestamp":1559468391000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-015-0436-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,6,10]]},"references-count":23,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2016,10]]}},"alternative-id":["436"],"URL":"https:\/\/doi.org\/10.1007\/s10951-015-0436-y","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,6,10]]}}}