{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,11,4]],"date-time":"2026-11-04T17:38:14Z","timestamp":1793813894211,"version":"4.6.1"},"reference-count":37,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2015,11,6]],"date-time":"2015-11-06T00:00:00Z","timestamp":1446768000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2016,4]]},"DOI":"10.1007\/s10951-015-0448-7","type":"journal-article","created":{"date-parts":[[2015,11,6]],"date-time":"2015-11-06T06:31:29Z","timestamp":1446791489000},"page":"165-176","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":17,"title":["Optimal K-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times"],"prefix":"10.1007","volume":"19","author":[{"given":"Xin","family":"Li","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Richard Y. K.","family":"Fung","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2015,11,6]]},"reference":[{"issue":"1","key":"448_CR1","doi-asserted-by":"crossref","first-page":"130","DOI":"10.1016\/0377-2217(94)90127-9","volume":"78","author":"R Armstrong","year":"1994","unstructured":"Armstrong, R., Lei, L., & Gu, S. (1994). A bounding scheme for deriving the minimal cycle time of a single-transporter n-stage process with time-window constraints. European Journal of Operational Research, 78(1), 130\u2013140.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"448_CR2","doi-asserted-by":"crossref","first-page":"636","DOI":"10.1016\/j.ejor.2009.06.035","volume":"202","author":"J Carlier","year":"2010","unstructured":"Carlier, J., Haouari, M., Kharbeche, M., & Moukrim, A. (2010). An optimization-based heuristic for the robotic cell problem. European Journal of Operational Research, 202(3), 636\u2013645.","journal-title":"European Journal of Operational Research"},{"key":"448_CR3","doi-asserted-by":"crossref","unstructured":"Chan, W. K., Yi, J., Ding, S. & Song, D. ( 2008). Optimal scheduling of k-unit production of cluster tools with single-blade robots. In Proceedings of 4th IEEE international conference on automation science and engineering, CASE 2008 (pp. 335\u2013340).","DOI":"10.1109\/COASE.2008.4626439"},{"issue":"1","key":"448_CR4","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1109\/TASE.2010.2046893","volume":"8","author":"WKV Chan","year":"2011","unstructured":"Chan, W. K. V., Ding, S., Yi, J., & Song, D. (2011a). Optimal scheduling of multicluster tools with constant robot moving times, part II: Tree-like topology configurations. IEEE Transactions on Automation Science and Engineering, 8(1), 17\u201328.","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"issue":"1","key":"448_CR5","doi-asserted-by":"crossref","first-page":"5","DOI":"10.1109\/TASE.2010.2046891","volume":"8","author":"WKV Chan","year":"2011","unstructured":"Chan, W. K. V., Yi, J., & Ding, S. (2011b). Optimal scheduling of multicluster tools with constant robot moving times, part I: Two-cluster analysis. IEEE Transactions on Automation Science and Engineering, 8(1), 5\u201316.","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"key":"448_CR6","doi-asserted-by":"crossref","unstructured":"Che, A., Lei, W., Feng, J. & Chu, C. ( 2014). An improved mixed integer programming approach for multi-hoist cyclic scheduling problem. IEEE Transactions on Automation Science and Engineering, 11(1), 302\u2013309.","DOI":"10.1109\/TASE.2013.2254713"},{"issue":"1","key":"448_CR7","doi-asserted-by":"crossref","first-page":"144","DOI":"10.1109\/70.660860","volume":"14","author":"H Chen","year":"1998","unstructured":"Chen, H., Chu, C., & Proth, J.-M. (1998). Cyclic scheduling of a hoist with time window constraints. IEEE Transactions on Robotics and Automation, 14(1), 144\u2013152.","journal-title":"IEEE Transactions on Robotics and Automation"},{"issue":"6","key":"448_CR8","doi-asserted-by":"crossref","first-page":"952","DOI":"10.1287\/opre.45.6.952","volume":"45","author":"Y Crama","year":"1997","unstructured":"Crama, Y., & van de Klundert, J. (1997). Cyclic scheduling of identical parts in a robotic cell. Operations Research, 45(6), 952\u2013965.","journal-title":"Operations Research"},{"issue":"5","key":"448_CR9","doi-asserted-by":"crossref","first-page":"387","DOI":"10.1007\/s10951-005-2861-9","volume":"8","author":"M Dawande","year":"2005","unstructured":"Dawande, M., Geismar, H. N., Sethi, S. P., & Sriskandarajah, C. (2005). Sequencing and scheduling in robotic cells: Recent developments. Journal of Scheduling, 8(5), 387\u2013426.","journal-title":"Journal of Scheduling"},{"key":"448_CR10","unstructured":"Dawande M. W., Geismar, H.\u00a0N., Sethi, S.\u00a0P. & Sriskandarajah, C. (2007). Throughput optimization in robotic cells in international series in operations research and management science (Vol. 101). New York, NY: Springer, LLC."},{"issue":"1","key":"448_CR11","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1080\/07408170902789092","volume":"42","author":"M Dawande","year":"2010","unstructured":"Dawande, M., Geismar, H. N., Pinedo, M., & Sriskandarajah, C. (2010). Throughput optimization in dual-gripper interval robotic cells. IIE Transactions, 42(1), 1\u201315.","journal-title":"IIE Transactions"},{"issue":"2","key":"448_CR12","doi-asserted-by":"crossref","first-page":"291","DOI":"10.1016\/j.ejor.2003.09.013","volume":"162","author":"HN Geismar","year":"2005","unstructured":"Geismar, H. N., Dawande, M., & Sriskandarajah, C. (2005). Approximation algorithms for k-unit cyclic solutions in robotic cells. European Journal of Operational Research, 162(2), 291\u2013309.","journal-title":"European Journal of Operational Research"},{"issue":"5","key":"448_CR13","doi-asserted-by":"crossref","first-page":"551","DOI":"10.3401\/poms.1080.0053","volume":"17","author":"HN Geismar","year":"2008","unstructured":"Geismar, H. N., Chan, L. M. A., Dawande, M., & Sriskandarajah, C. (2008). Approximations to optimal k-unit cycles for single-gripper and dual-gripper robotic cells. Production and Operations Management, 17(5), 551\u2013563.","journal-title":"Production and Operations Management"},{"issue":"12","key":"448_CR14","doi-asserted-by":"crossref","first-page":"1211","DOI":"10.1080\/07408170801965108","volume":"40","author":"HN Geismar","year":"2008","unstructured":"Geismar, H. N., Pinedo, M., & Sriskandarajah, C. (2008). Robotic cells with parallel machines and multiple dual gripper robots: A comparative overview. IIE Transactions, 40(12), 1211\u20131227.","journal-title":"IIE Transactions"},{"issue":"1","key":"448_CR15","doi-asserted-by":"crossref","first-page":"29","DOI":"10.1109\/TASE.2009.2039567","volume":"8","author":"N Geismar","year":"2011","unstructured":"Geismar, N., Dawande, M., & Sriskandarajah, C. (2011). Productivity improvement from using machine buffers in dual-gripper cluster tools. IEEE Transactions on Automation Science and Engineering, 8(1), 29\u201341.","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"issue":"3","key":"448_CR16","doi-asserted-by":"crossref","first-page":"230","DOI":"10.1080\/0740817X.2011.618174","volume":"44","author":"N Geismar","year":"2012","unstructured":"Geismar, N., Manoj, U. V., Sethi, A., & Sriskandarajah, C. (2012). Scheduling robotic cells served by a dual-arm robot. IIE Transactions, 44(3), 230\u2013248.","journal-title":"IIE Transactions"},{"issue":"2","key":"448_CR17","doi-asserted-by":"crossref","first-page":"186","DOI":"10.1109\/TSM.2011.2180547","volume":"25","author":"C Jung","year":"2012","unstructured":"Jung, C., & Lee, T.-E. (2012). An efficient mixed integer programming model based on timed petri nets for diverse complex cluster tool scheduling problems. IEEE Transactions on Semiconductor Manufacturing, 25(2), 186\u2013199.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"issue":"6","key":"448_CR18","doi-asserted-by":"crossref","first-page":"821","DOI":"10.1287\/opre.47.6.821","volume":"47","author":"H Kamoun","year":"1999","unstructured":"Kamoun, H., Hall, N. G., & Sriskandarajah, C. (1999). Scheduling in robotic cells: Heuristics and cell design. Operations Research, 47(6), 821\u2013835.","journal-title":"Operations Research"},{"issue":"1","key":"448_CR19","doi-asserted-by":"crossref","first-page":"23","DOI":"10.1002\/jos.92","volume":"5","author":"V Kats","year":"2002","unstructured":"Kats, V., & Levner, E. (2002). Cyclic scheduling in a robotic production line. Journal of Scheduling, 5(1), 23\u201341.","journal-title":"Journal of Scheduling"},{"key":"448_CR20","doi-asserted-by":"crossref","unstructured":"Kats, V., & Levner, E. (2011a). A faster algorithm for 2-cyclic robotic scheduling with a fixed robot route and interval processing times. European Journal of Operational Research, 209(1), 51\u201356.","DOI":"10.1016\/j.ejor.2010.10.002"},{"issue":"2","key":"448_CR21","doi-asserted-by":"crossref","first-page":"267","DOI":"10.1007\/s10951-010-0166-0","volume":"14","author":"V Kats","year":"2011","unstructured":"Kats, V., & Levner, E. (2011b). Parametric algorithm for 2-cyclic robot scheduling with interval processing times. Journal of Scheduling, 14(2), 267\u2013279.","journal-title":"Journal of Scheduling"},{"issue":"2","key":"448_CR22","doi-asserted-by":"crossref","first-page":"242","DOI":"10.1007\/s10696-011-9079-2","volume":"23","author":"M Kharbeche","year":"2011","unstructured":"Kharbeche, M., Carlier, J., Haouari, M., & Moukrim, A. (2011). Exact methods for the robotic cell problem. Flexible Services and Manufacturing Journal, 23(2), 242\u2013261.","journal-title":"Flexible Services and Manufacturing Journal"},{"key":"448_CR23","unstructured":"Lei, L. & Wang, T.\u00a0J. (1989). A proof: The cyclic hoist scheduling problem is np-complete. Working paper 89-0016. New Brunswick, NJ: Rutgers University."},{"issue":"6","key":"448_CR24","doi-asserted-by":"crossref","first-page":"965","DOI":"10.1287\/opre.1040.0144","volume":"52","author":"JMY Leung","year":"2004","unstructured":"Leung, J. M. Y., Zhang, G., Yang, X., Mak, R., & Lam, K. (2004). Optimal cyclic multi-hoist scheduling: A mixed integer programming approach. Operations Research, 52(6), 965\u2013976.","journal-title":"Operations Research"},{"key":"448_CR25","doi-asserted-by":"crossref","unstructured":"Li, X. & Fung, R. Y.\u00a0K. ( 2013). A mixed integer linear programming approach for multi-degree cyclic multi-hoist scheduling problems without overlapping. In 2013 IEEE international conference on automation science and engineering (CASE) (pp. 274\u2013279).","DOI":"10.1109\/CoASE.2013.6653893"},{"key":"448_CR26","doi-asserted-by":"crossref","unstructured":"Li, X., Fung, R. Y.\u00a0K. & Sun, H. (2011). An events-driven scheduling algorithm for two-cluster tools with processing time windows. In 2011 IEEE international conference on industrial engineering and engineering management (IEEM) (pp.\u00a01436\u20131440).","DOI":"10.1109\/IEEM.2011.6118154"},{"issue":"5","key":"448_CR27","doi-asserted-by":"crossref","first-page":"704","DOI":"10.1080\/0305215X.2013.795560","volume":"46","author":"X Li","year":"2014","unstructured":"Li, X., & Fung, R. Y. K. (2014). A mixed integer linear programming solution for single hoist multi-degree cyclic scheduling with reentrance. Engineering Optimization, 46(5), 704\u2013723.","journal-title":"Engineering Optimization"},{"issue":"6","key":"448_CR28","doi-asserted-by":"crossref","first-page":"583","DOI":"10.1007\/s10951-010-0222-9","volume":"14","author":"L Monch","year":"2011","unstructured":"Monch, L., Fowler, J. W., Dauzere-Peres, S., Mason, S. J., & Rose, O. (2011). A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations. Journal of Scheduling, 14(6), 583\u2013599.","journal-title":"Journal of Scheduling"},{"issue":"2","key":"448_CR29","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1080\/05695557608975070","volume":"8","author":"LW Phillips","year":"1976","unstructured":"Phillips, L. W., & Unger, P. S. (1976). Mathematical programming solution of a hoist scheduling program. AIIE Transactions, 8(2), 219\u2013225.","journal-title":"AIIE Transactions"},{"issue":"3\u20134","key":"448_CR30","doi-asserted-by":"crossref","first-page":"331","DOI":"10.1007\/BF01324886","volume":"4","author":"S Sethi","year":"1992","unstructured":"Sethi, S., Sriskandarajah, C., Sorger, G., Blazewicz, J., & Kubiak, W. (1992). Sequencing of parts and robot moves in a robotic cell. International Journal of Flexible Manufacturing Systems, 4(3\u20134), 331\u2013358.","journal-title":"International Journal of Flexible Manufacturing Systems"},{"key":"448_CR31","volume-title":"Microchip fabrication: A practical guide to semiconductor processing","author":"P Zant van","year":"2004","unstructured":"van Zant, P. (2004). Microchip fabrication: A practical guide to semiconductor processing (5th ed.). New York: McGraw-Hill.","edition":"5"},{"issue":"2","key":"448_CR32","doi-asserted-by":"crossref","first-page":"446","DOI":"10.1109\/TASE.2011.2178023","volume":"9","author":"N Wu","year":"2012","unstructured":"Wu, N., & Zhou, M. (2012). Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on petri nets. IEEE Transactions on Automation Science and Engineering, 9(2), 446\u2013454.","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"issue":"12","key":"448_CR33","doi-asserted-by":"crossref","first-page":"1584","DOI":"10.1109\/TSMC.2014.2327051","volume":"44","author":"F Yang","year":"2014","unstructured":"Yang, F., Wu, N., Qiao, Y., & Zhou, M. (2014). Optimal one-wafer cyclic scheduling of single-arm multicluster tools with two-space buffering modules. IEEE Transactions on Systems, Man, and Cybernetics: Systems, 44(12), 1584\u20131597.","journal-title":"IEEE Transactions on Systems, Man, and Cybernetics: Systems"},{"issue":"3","key":"448_CR34","doi-asserted-by":"crossref","first-page":"390","DOI":"10.1109\/TSM.2005.852103","volume":"18","author":"HJ Yoon","year":"2005","unstructured":"Yoon, H. J., & Lee, D. Y. (2005). Online scheduling of integrated single-wafer processing tools with temporal constraints. IEEE Transactions on Semiconductor Manufacturing, 18(3), 390\u2013398.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"issue":"8","key":"448_CR35","doi-asserted-by":"crossref","first-page":"3621","DOI":"10.1016\/j.apm.2011.10.032","volume":"36","author":"Z Zhou","year":"2012","unstructured":"Zhou, Z., Che, A., & Yan, P. (2012). A mixed integer programming approach for multi-cyclic robotic flowshop scheduling with time window constraints. Applied Mathematical Modelling, 36(8), 3621\u20133629.","journal-title":"Applied Mathematical Modelling"},{"issue":"1","key":"448_CR36","doi-asserted-by":"crossref","first-page":"5","DOI":"10.1007\/s10479-008-0372-8","volume":"168","author":"Z Zhou","year":"2009","unstructured":"Zhou, Z., & Li, L. (2009). A solution for cyclic scheduling of multi-hoists without overlapping. Annals of Operations Research, 168(1), 5\u201321.","journal-title":"Annals of Operations Research"},{"issue":"4","key":"448_CR37","doi-asserted-by":"crossref","first-page":"578","DOI":"10.1109\/TSM.2013.2278378","volume":"26","author":"Q Zhu","year":"2013","unstructured":"Zhu, Q., Wu, N., Qiao, Y., & Zhou, M. (2013). Petri net-based optimal one-wafer scheduling of single-arm multi-cluster tools in semiconductor manufacturing. IEEE Transactions on Semiconductor Manufacturing, 26(4), 578\u2013591.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-015-0448-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-015-0448-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-015-0448-7","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,9,1]],"date-time":"2019-09-01T05:27:01Z","timestamp":1567315621000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-015-0448-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,11,6]]},"references-count":37,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2016,4]]}},"alternative-id":["448"],"URL":"https:\/\/doi.org\/10.1007\/s10951-015-0448-7","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,11,6]]}}}