{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,30]],"date-time":"2026-05-30T01:21:22Z","timestamp":1780104082936,"version":"3.54.0"},"reference-count":56,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2017,10,4]],"date-time":"2017-10-04T00:00:00Z","timestamp":1507075200000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100001665","name":"Agence Nationale de la Recherche","doi-asserted-by":"publisher","award":["ANR-13-BS02-0006"],"award-info":[{"award-number":["ANR-13-BS02-0006"]}],"id":[{"id":"10.13039\/501100001665","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2018,8]]},"DOI":"10.1007\/s10951-017-0542-0","type":"journal-article","created":{"date-parts":[[2017,10,4]],"date-time":"2017-10-04T12:10:15Z","timestamp":1507119015000},"page":"443-460","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":25,"title":["Integrated production and outbound distribution scheduling problems with job release dates and deadlines"],"prefix":"10.1007","volume":"21","author":[{"given":"Liang-Liang","family":"Fu","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Mohamed Ali","family":"Aloulou","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Christian","family":"Artigues","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2017,10,4]]},"reference":[{"key":"542_CR1","doi-asserted-by":"crossref","first-page":"377","DOI":"10.1016\/j.ejor.2008.12.030","volume":"200","author":"I Averbakh","year":"2010","unstructured":"Averbakh, I. (2010). Online integrated production-distribution scheduling problems with capacitated deliveries. European Journal of Operational Research, 200, 377\u2013384.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"542_CR2","doi-asserted-by":"crossref","first-page":"381","DOI":"10.1007\/s10951-011-0264-7","volume":"15","author":"I Averbakh","year":"2012","unstructured":"Averbakh, I., & Baysan, M. (2012). Semi-online two-level supply chain scheduling problems. Journal of Scheduling, 15(3), 381\u2013390.","journal-title":"Journal of Scheduling"},{"issue":"6","key":"542_CR3","doi-asserted-by":"crossref","first-page":"710","DOI":"10.1016\/j.orl.2013.10.002","volume":"41","author":"I Averbakh","year":"2013","unstructured":"Averbakh, I., & Baysan, M. (2013a). Approximation algorithm for the on-line multi-customer two-level supply chain scheduling problem. Operations Research Letters, 41(6), 710\u2013714.","journal-title":"Operations Research Letters"},{"key":"542_CR4","doi-asserted-by":"crossref","first-page":"28","DOI":"10.1016\/j.dam.2012.08.003","volume":"161","author":"I Averbakh","year":"2013","unstructured":"Averbakh, I., & Baysan, M. (2013b). Batching and delivery in semi-online distribution systems. Discrete Applied Mathematics, 161, 28\u201342.","journal-title":"Discrete Applied Mathematics"},{"issue":"1","key":"542_CR5","doi-asserted-by":"crossref","first-page":"500","DOI":"10.1016\/j.ejor.2006.06.004","volume":"181","author":"I Averbakh","year":"2007","unstructured":"Averbakh, I., & Xue, Z. (2007). On-line supply chain scheduling problems with preemption. European Journal of Operational Research, 181(1), 500\u2013504.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"542_CR6","doi-asserted-by":"crossref","first-page":"381","DOI":"10.1287\/opre.31.2.381","volume":"31","author":"KR Baker","year":"1983","unstructured":"Baker, K. R., Lawler, E. L., Lenstra, J. K., & Kan, A. H. G. R. (1983). Preemptive scheduling of a single machine to minimize maximum cost subject to release dates and precedence constraints. Operations Research, 31(2), 381\u2013386.","journal-title":"Operations Research"},{"key":"542_CR7","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1051\/ro\/2010007","volume":"44","author":"C Briand","year":"2010","unstructured":"Briand, C., Ourari, S., & Bouzouia, B. (2010). An efficient ilp formulation for the single machine scheduling problem. RAIRO-Operations Research, 44, 61\u201371.","journal-title":"RAIRO-Operations Research"},{"issue":"1","key":"542_CR8","doi-asserted-by":"crossref","first-page":"42","DOI":"10.1016\/S0377-2217(82)80007-6","volume":"11","author":"J Carlier","year":"1982","unstructured":"Carlier, J. (1982). The one-machine sequencing problem. European Journal of Operational Research, 11(1), 42\u201347.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"542_CR9","doi-asserted-by":"crossref","first-page":"130","DOI":"10.1287\/opre.1080.0688","volume":"58","author":"ZL Chen","year":"2010","unstructured":"Chen, Z. L. (2010). Integrated production and outbound distribution scheduling: Review and extensions. Operations Research, 58(1), 130\u2013148.","journal-title":"Operations Research"},{"issue":"7","key":"542_CR10","doi-asserted-by":"crossref","first-page":"2311","DOI":"10.1016\/j.cor.2008.09.010","volume":"36","author":"HK Chen","year":"2009","unstructured":"Chen, H. K., Hsueh, C. F., & Chang, M. S. (2009). Production scheduling and vehicle routing with time windows for perishable food products. Computers and Operations Research, 36(7), 2311\u20132319.","journal-title":"Computers and Operations Research"},{"issue":"6","key":"542_CR11","doi-asserted-by":"crossref","first-page":"672","DOI":"10.1111\/j.1937-5956.2009.01029.x","volume":"18","author":"ZL Chen","year":"2009","unstructured":"Chen, Z. L., & Pundoor, G. (2009). Integrated order scheduling and packing. Production and Operations Management, 18(6), 672\u2013692.","journal-title":"Production and Operations Management"},{"issue":"2","key":"542_CR12","doi-asserted-by":"crossref","first-page":"752","DOI":"10.1016\/j.ijpe.2009.03.001","volume":"121","author":"WC Chiang","year":"2009","unstructured":"Chiang, W. C., Russel, R., Xu, X., & Zepeda, D. (2009). A simulation\/metaheuristic approach to newspaper production and distribution supply chain problems. International Journal of Production Economics, 121(2), 752\u2013767.","journal-title":"International Journal of Production Economics"},{"issue":"3","key":"542_CR13","doi-asserted-by":"crossref","first-page":"886","DOI":"10.1016\/j.cor.2012.08.017","volume":"40","author":"A Condotta","year":"2013","unstructured":"Condotta, A., Knust, S., Meier, D., & Shakhlevich, N. V. (2013). Tabu search and lower bounds for a combined production-transportation problem. Computers and Operations Research, 40(3), 886\u2013900.","journal-title":"Computers and Operations Research"},{"issue":"2","key":"542_CR14","doi-asserted-by":"crossref","first-page":"141","DOI":"10.1287\/trsc.23.2.141","volume":"23","author":"M Dror","year":"1989","unstructured":"Dror, M., & Trudeau, P. (1989). Savings by split delivery routing. Transportation Science, 23(2), 141\u2013145.","journal-title":"Transportation Science"},{"key":"542_CR15","unstructured":"European Commission. (2011). Road Freight Transport Vademecum 2010 Report. Last visited January, 2017 \n                        http:\/\/ec.europa.eu\/transport\/sites\/transport\/files\/modes\/road\/doc\/2010-road-freight-vademecum.pdf\n                        \n                    ."},{"key":"542_CR16","doi-asserted-by":"crossref","unstructured":"Feng, X., Cheng, Y., Zheng, F., & Xu, Y. (2016). Online integrated production\u2013distribution scheduling problems without preemption. Journal of Combinatorial Optimization, 31(4), 1569\u20131585.","DOI":"10.1007\/s10878-015-9841-6"},{"key":"542_CR17","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1016\/j.tcs.2011.11.035","volume":"422","author":"B Fu","year":"2012","unstructured":"Fu, B., Huo, Y., & Zhao, H. (2012). Coordinated scheduling of production and delivery with production window and delivery capacity constraints. Theoretical Computer Science, 422, 39\u201351.","journal-title":"Theoretical Computer Science"},{"key":"542_CR18","volume-title":"Computers and intractability: A guide to the theory of NP-completeness","author":"M Garey","year":"1979","unstructured":"Garey, M., & Johnson, D. (1979). Computers and intractability: A guide to the theory of NP-completeness. New York: W.H Freeman."},{"issue":"4","key":"542_CR19","doi-asserted-by":"crossref","first-page":"329","DOI":"10.1002\/jos.103","volume":"5","author":"A Gharbi","year":"2002","unstructured":"Gharbi, A., & Haouari, M. (2002). Minimizing makespan on parallel machines subject to release dates and delivery times. Journal of Scheduling, 5(4), 329\u2013355.","journal-title":"Journal of Scheduling"},{"key":"542_CR20","first-page":"287","volume-title":"Discrete optimization II, annals of discrete mathematics","author":"RL Graham","year":"1979","unstructured":"Graham, R. L., Lawler, E. L., Lenstra, J. K., & Rinnooy Kan, A. H. G. (1979). Optimization and approximation in deterministic sequencing and scheduling: A survey. In E. J. P. L. Hammer & B. Korte (Eds.), Discrete optimization II, annals of discrete mathematics (Vol. 5, pp. 287\u2013326). Amsterdam: Elsevier."},{"key":"542_CR21","doi-asserted-by":"crossref","unstructured":"Hall, L. A., & Shmoys, D. B. (1989). Approximation algorithms for constrained scheduling problems. In Proceedings of the 30th annual symposium on foundations of computer science (pp. 134\u2013140).","DOI":"10.1109\/SFCS.1989.63468"},{"issue":"1","key":"542_CR22","doi-asserted-by":"crossref","first-page":"22","DOI":"10.1287\/moor.17.1.22","volume":"17","author":"LA Hall","year":"1992","unstructured":"Hall, L. A., & Shmoys, D. B. (1992). Jackson\u2019s rule for single-machine scheduling: Making a good heuristic better. Mathematics of Operations Research, 17(1), 22\u201335.","journal-title":"Mathematics of Operations Research"},{"issue":"1","key":"542_CR23","doi-asserted-by":"crossref","first-page":"41","DOI":"10.1007\/s10479-005-6234-8","volume":"135","author":"N Hall","year":"2005","unstructured":"Hall, N., & Potts, C. (2005). The coordination of scheduling and batch deliveries. Annals of Operations Research, 135(1), 41\u201364.","journal-title":"Annals of Operations Research"},{"issue":"4","key":"542_CR24","doi-asserted-by":"crossref","first-page":"566","DOI":"10.1287\/opre.51.4.566.16106","volume":"51","author":"NG Hall","year":"2003","unstructured":"Hall, N. G., & Potts, C. N. (2003). Supply chain scheduling: Batching and delivery. Operations Research, 51(4), 566\u2013584.","journal-title":"Operations Research"},{"issue":"1","key":"542_CR25","doi-asserted-by":"crossref","first-page":"177","DOI":"10.1002\/nav.3800210113","volume":"21","author":"WA Horn","year":"1974","unstructured":"Horn, W. A. (1974). Some simple scheduling algorithms. Naval Research Logistics Quarterly, 21(1), 177\u2013185.","journal-title":"Naval Research Logistics Quarterly"},{"issue":"1","key":"542_CR26","doi-asserted-by":"crossref","first-page":"75","DOI":"10.1016\/j.ijpe.2009.09.010","volume":"124","author":"HI Hsiao","year":"2010","unstructured":"Hsiao, H. I., Kemp, R. G. M., & van der Vist, J. G. A. J. (2010). A classification of logistic outsourcing levels and their impact on service performance: Evidence from the food processing industry. International Journal of Production Economics, 124(1), 75\u201386.","journal-title":"International Journal of Production Economics"},{"key":"542_CR27","unstructured":"Jackson, J. R. (1955). Scheduling a production line to minimize maximum tardiness. Technical report, University of California, Los Angeles."},{"key":"542_CR28","doi-asserted-by":"crossref","first-page":"105","DOI":"10.1016\/j.jmsy.2016.06.005","volume":"40","author":"N Jamili","year":"2016","unstructured":"Jamili, N., Ranjbar, M., & Salari, M. (2016). A bi-objective model for integrated scheduling of production and distribution in a supply chain with order release date restrictions. Journal of Manufacturing Systems, 40, 105\u2013118.","journal-title":"Journal of Manufacturing Systems"},{"key":"542_CR29","doi-asserted-by":"crossref","first-page":"257","DOI":"10.1002\/nav.10054","volume":"50","author":"P Kaminsky","year":"2003","unstructured":"Kaminsky, P. (2003). The effectiveness of the longest delivery time rule for the flow shop delivery time problem. Naval Research Logistics, 50, 257\u2013272.","journal-title":"Naval Research Logistics"},{"issue":"5","key":"542_CR30","doi-asserted-by":"crossref","first-page":"544","DOI":"10.1287\/mnsc.19.5.544","volume":"19","author":"EL Lawler","year":"1973","unstructured":"Lawler, E. L. (1973). Optimal sequencing of a single machine subject to precedence constraints. Management Science, 19(5), 544\u2013546.","journal-title":"Management Science"},{"key":"542_CR31","doi-asserted-by":"crossref","first-page":"343","DOI":"10.1016\/S0167-5060(08)70743-X","volume-title":"Studies in integer programming, annals of discrete mathematics","author":"J Lenstra","year":"1977","unstructured":"Lenstra, J., Rinnooy Kan, A., & Brucker, P. (1977). Complexity of machine scheduling problems. In P. Hammer, E. Johnson, B. Korte, & G. Nemhauser (Eds.), Studies in integer programming, annals of discrete mathematics (Vol. 1, pp. 343\u2013362). Amsterdam: Elsevier."},{"issue":"3","key":"542_CR32","doi-asserted-by":"crossref","first-page":"290","DOI":"10.1016\/j.orl.2013.02.006","volume":"41","author":"JYT Leung","year":"2013","unstructured":"Leung, J. Y. T., & Chen, Z. L. (2013). Integrated production and distribution with fixed delivery departure dates. Operations Research Letters, 41(3), 290\u2013293.","journal-title":"Operations Research Letters"},{"issue":"3","key":"542_CR33","doi-asserted-by":"crossref","first-page":"755","DOI":"10.1016\/j.ejor.2015.06.051","volume":"247","author":"K Li","year":"2015","unstructured":"Li, K., Jia, Z. H., & Leung, J. Y. T. (2015). Integrated production and delivery on parallel batching machines. European Journal of Operational Research, 247(3), 755\u2013763.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"542_CR34","doi-asserted-by":"crossref","first-page":"270","DOI":"10.1016\/j.tcs.2010.09.025","volume":"412","author":"P Liu","year":"2011","unstructured":"Liu, P., & Lu, X. (2011). An improved approximation algorithm for single machine scheduling with job delivery. Theoretical Computer Science, 412(3), 270\u2013274.","journal-title":"Theoretical Computer Science"},{"issue":"2","key":"542_CR35","doi-asserted-by":"crossref","first-page":"107","DOI":"10.1016\/S0020-0190(01)00251-4","volume":"82","author":"Z Liu","year":"2002","unstructured":"Liu, Z., & Cheng, T. (2002). Scheduling with job release dates, delivery times and preemption penalties. Information Processing Letters, 82(2), 107\u2013111.","journal-title":"Information Processing Letters"},{"issue":"1\u20133","key":"542_CR36","doi-asserted-by":"crossref","first-page":"102","DOI":"10.1016\/j.tcs.2007.11.008","volume":"393","author":"L Lu","year":"2008","unstructured":"Lu, L., Yuan, J., & Zhang, L. (2008). Single machine scheduling with release dates and job delivery to minimize the makespan. Theoretical Computer Science, 393(1\u20133), 102\u2013108.","journal-title":"Theoretical Computer Science"},{"issue":"6","key":"542_CR37","doi-asserted-by":"crossref","first-page":"521","DOI":"10.1023\/A:1026272526225","volume":"6","author":"M Mastrolilli","year":"2003","unstructured":"Mastrolilli, M. (2003). Efficient approximation schemes for scheduling problems with release dates and delivery times. Journal of Scheduling, 6(6), 521\u2013531.","journal-title":"Journal of Scheduling"},{"issue":"3","key":"542_CR38","doi-asserted-by":"crossref","first-page":"347","DOI":"10.5267\/j.ijiec.2012.01.004","volume":"3","author":"MM Mazdeh","year":"2012","unstructured":"Mazdeh, M. M., Esfahani, A. N., Sakkaki, S. E., & Pilerood, A. E. (2012). Single-machine batch scheduling minimizing weighted flow times and delivery costs with job release times. International Journal of Industrial Engineering Computations, 3(3), 347\u2013364.","journal-title":"International Journal of Industrial Engineering Computations"},{"issue":"4","key":"542_CR39","doi-asserted-by":"crossref","first-page":"1099","DOI":"10.1016\/j.cor.2006.07.006","volume":"35","author":"MM Mazdeh","year":"2008","unstructured":"Mazdeh, M. M., Sarhadi, M., & Hindi, K. S. (2008). A branch-and-bound algorithm for single-machine scheduling with batch delivery and job release times. Computers and Operations Research, 35(4), 1099\u20131111.","journal-title":"Computers and Operations Research"},{"issue":"2","key":"542_CR40","doi-asserted-by":"crossref","first-page":"514","DOI":"10.1016\/j.ejor.2014.12.002","volume":"243","author":"A Mensendiek","year":"2015","unstructured":"Mensendiek, A., Gupta, J. N., & Herrmann, J. (2015). Scheduling identical parallel machines with fixed delivery dates to minimize total tardiness. European Journal of Operational Research, 243(2), 514\u2013522.","journal-title":"European Journal of Operational Research"},{"key":"542_CR41","doi-asserted-by":"crossref","first-page":"224","DOI":"10.1016\/j.cie.2016.12.010","volume":"104","author":"S Moons","year":"2017","unstructured":"Moons, S., Ramaekers, K., Caris, A., & Arda, Y. (2017). Integrating production scheduling and vehicle routing decisions at the operational decision level: A review and discussion. Computers and Industrial Engineering, 104, 224\u2013225.","journal-title":"Computers and Industrial Engineering"},{"issue":"3","key":"542_CR42","doi-asserted-by":"crossref","first-page":"391","DOI":"10.1007\/s10951-011-0260-y","volume":"15","author":"C Ng","year":"2012","unstructured":"Ng, C., & Lu, L. (2012). On-line integrated production and outbound distribution scheduling to minimize the maximum delivery completion time. Journal of Scheduling, 15(3), 391\u2013398.","journal-title":"Journal of Scheduling"},{"issue":"6","key":"542_CR43","doi-asserted-by":"crossref","first-page":"1436","DOI":"10.1287\/opre.28.6.1436","volume":"28","author":"CN Potts","year":"1980","unstructured":"Potts, C. N. (1980). Analysis of a heuristic for one machine sequencing with release dates and delivery times. Operations Research, 28(6), 1436\u20131441.","journal-title":"Operations Research"},{"issue":"6","key":"542_CR44","doi-asserted-by":"crossref","first-page":"571","DOI":"10.1002\/nav.20100","volume":"52","author":"G Pundoor","year":"2005","unstructured":"Pundoor, G., & Chen, Z. L. (2005). Scheduling a production-distribution system to optimize the tradeoff between delivery tardiness and distribution cost. Naval Research Logistics, 52(6), 571\u2013589.","journal-title":"Naval Research Logistics"},{"key":"542_CR45","unstructured":"Queyranne, M., & Schulz, A.S. (1994). Polyhedral approaches to machine scheduling. Technical report, Preprint No. 408\/1994, Department of Mathematics, Technical University of Berlin, Germany."},{"key":"542_CR46","doi-asserted-by":"crossref","first-page":"1576","DOI":"10.1016\/j.cor.2006.09.002","volume":"35","author":"R Russel","year":"2008","unstructured":"Russel, R., Chaing, W. C., & Zepeda, D. (2008). Integrating multi-product production and distribution in newspaper logistics. Computers and Operations Research, 35, 1576\u20131588.","journal-title":"Computers and Operations Research"},{"issue":"1","key":"542_CR47","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1007\/s10951-011-0255-8","volume":"16","author":"E Selvarajah","year":"2013","unstructured":"Selvarajah, E., Steiner, G., & Zhang, R. (2013). Single machine batch scheduling with release times and delivery costs. Journal of Scheduling, 16(1), 69\u201379.","journal-title":"Journal of Scheduling"},{"key":"542_CR48","doi-asserted-by":"crossref","first-page":"206","DOI":"10.1287\/msom.1060.0138","volume":"9","author":"KE Stecke","year":"2007","unstructured":"Stecke, K. E., & Zhao, X. (2007). Production and transportation integration for a make-to-order manufacturing company with a commit-to-delivery business mode. Manufacturing and Service Operations Management, 9, 206\u2013224.","journal-title":"Manufacturing and Service Operations Management"},{"key":"542_CR49","volume-title":"Issues in supply chain scheduling and contracting","author":"CA Ullrich","year":"2013","unstructured":"Ullrich, C. A. (2013a). Issues in supply chain scheduling and contracting. Berlin: Springer."},{"issue":"1","key":"542_CR50","doi-asserted-by":"crossref","first-page":"152","DOI":"10.1016\/j.ejor.2012.11.049","volume":"227","author":"CA Ullrich","year":"2013","unstructured":"Ullrich, C. A. (2013b). Integrated machine scheduling and vehicle routing with time windows. European Journal of Operational Research, 227(1), 152\u2013165.","journal-title":"European Journal of Operational Research"},{"key":"542_CR51","unstructured":"Volpe, R., Roeger, E., & Leibtag, E. (2013). How transportation costs affect fresh fruit and vegetable prices. USDA-ERS (Economic Research Service), Economic Research Report 160."},{"issue":"1","key":"542_CR52","doi-asserted-by":"crossref","first-page":"94","DOI":"10.1504\/IJISE.2015.065949","volume":"19","author":"DY Wang","year":"2014","unstructured":"Wang, D. Y., Grunder, O., & Moudni, A. E. (2014). Integrated scheduling of production and distribution operations: a review. International Journal of Industrial and Systems Engineering, 19(1), 94\u2013122.","journal-title":"International Journal of Industrial and Systems Engineering"},{"issue":"8","key":"542_CR53","doi-asserted-by":"crossref","first-page":"796","DOI":"10.1002\/nav.20116","volume":"52","author":"H Wang","year":"2005","unstructured":"Wang, H., & Lee, C. Y. (2005). Production and transport logistics scheduling with two transport mode choices. Naval Research Logistics, 52(8), 796\u2013809.","journal-title":"Naval Research Logistics"},{"issue":"1","key":"542_CR54","doi-asserted-by":"crossref","first-page":"60","DOI":"10.1016\/0377-2217(94)90006-X","volume":"76","author":"S Zdrzaka","year":"1994","unstructured":"Zdrzaka, S. (1994). Preemptive scheduling with release dates, delivery times and sequence independent setup times. European Journal of Operational Research, 76(1), 60\u201371.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"542_CR55","doi-asserted-by":"crossref","first-page":"133","DOI":"10.1016\/j.orl.2009.11.007","volume":"38","author":"W Zhong","year":"2010","unstructured":"Zhong, W., Chen, Z. L., & Chen, M. (2010). Integrated production and distribution scheduling with committed delivery dates. Operations Research Letters, 38(2), 133\u2013138.","journal-title":"Operations Research Letters"},{"key":"542_CR56","doi-asserted-by":"crossref","unstructured":"Zhong, X., & Jiang, D. (2016). Integrated scheduling of production and distribution with release dates and capacitated deliveries. Mathematical Problems in Engineering, 2016, 9315197.","DOI":"10.1155\/2016\/9315197"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-017-0542-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-017-0542-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-017-0542-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2018,7,11]],"date-time":"2018-07-11T08:00:57Z","timestamp":1531296057000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-017-0542-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,10,4]]},"references-count":56,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2018,8]]}},"alternative-id":["542"],"URL":"https:\/\/doi.org\/10.1007\/s10951-017-0542-0","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,10,4]]}}}