{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,8,28]],"date-time":"2026-08-28T07:23:55Z","timestamp":1787901835937,"version":"build-2784847793"},"reference-count":23,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2017,10,11]],"date-time":"2017-10-11T00:00:00Z","timestamp":1507680000000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100003151","name":"Fonds de Recherche du Qu\u00e9bec - Nature et Technologies","doi-asserted-by":"publisher","id":[{"id":"10.13039\/501100003151","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2018,6]]},"DOI":"10.1007\/s10951-017-0544-y","type":"journal-article","created":{"date-parts":[[2017,10,11]],"date-time":"2017-10-11T07:59:43Z","timestamp":1507708783000},"page":"285-304","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":14,"title":["An implicit model for multi-activity shift scheduling problems"],"prefix":"10.1007","volume":"21","author":[{"given":"Sana","family":"Dahmen","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Monia","family":"Rekik","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Fran\u00e7ois","family":"Soumis","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2017,10,11]]},"reference":[{"issue":"4","key":"544_CR1","doi-asserted-by":"crossref","first-page":"591","DOI":"10.1287\/mnsc.42.4.591","volume":"42","author":"T Aykin","year":"1996","unstructured":"Aykin, T. (1996). Optimal shift scheduling with multiple break windows. Management Science, 42(4), 591\u2013602.","journal-title":"Management Science"},{"issue":"11","key":"544_CR2","doi-asserted-by":"crossref","first-page":"1339","DOI":"10.1287\/mnsc.36.11.1339","volume":"36","author":"SE Bechtold","year":"1990","unstructured":"Bechtold, S. E., & Jacobs, L. W. (1990). Implicit modeling of flexible break assignments in optimal shift scheduling. Management Science, 36(11), 1339\u20131351.","journal-title":"Management Science"},{"issue":"2","key":"544_CR3","doi-asserted-by":"crossref","first-page":"233","DOI":"10.1002\/(SICI)1520-6750(199603)43:2<233::AID-NAV5>3.0.CO;2-B","volume":"43","author":"SE Bechtold","year":"1996","unstructured":"Bechtold, S. E., & Jacobs, L. W. (1996). The equivalence of general set-covering and implicit integer programming formulations for shift scheduling. Naval Research Logistics (NRL), 43(2), 233\u2013249.","journal-title":"Naval Research Logistics (NRL)"},{"issue":"2","key":"544_CR4","doi-asserted-by":"crossref","first-page":"275","DOI":"10.1002\/nav.10115","volume":"51","author":"T Cezik","year":"2004","unstructured":"Cezik, T., & G\u00fcnl\u00fck, O. (2004). Reformulating linear programs with transportation constraints with applications to workforce scheduling. Naval Research Logistics (NRL), 51(2), 275\u2013296.","journal-title":"Naval Research Logistics (NRL)"},{"key":"544_CR5","unstructured":"C\u00f4t\u00e9, M. C., Gendron, B., Rousseau, L. M. (2007). Modeling the regular constraint with integer programming. In Integration of AI and OR techniques in constraint programming for combinatorial optimization problems (pp. 29\u201343). Berlin\/Heidelberg: Springer."},{"issue":"1","key":"544_CR6","doi-asserted-by":"crossref","first-page":"54","DOI":"10.1007\/s10601-009-9083-2","volume":"16","author":"MC C\u00f4t\u00e9","year":"2011","unstructured":"C\u00f4t\u00e9, M. C., Gendron, B., Quimper, C. G., & Rousseau, L. M. (2011a). Formal languages for integer programming modeling of shift scheduling problems. Constraints, 16(1), 54\u201376.","journal-title":"Constraints"},{"issue":"1","key":"544_CR7","doi-asserted-by":"crossref","first-page":"151","DOI":"10.1287\/mnsc.1100.1264","volume":"57","author":"MC C\u00f4t\u00e9","year":"2011","unstructured":"C\u00f4t\u00e9, M. C., Gendron, B., & Rousseau, L. M. (2011b). Grammar-based integer programming models for multiactivity shift scheduling. Management Science, 57(1), 151\u2013163.","journal-title":"Management Science"},{"issue":"3","key":"544_CR8","doi-asserted-by":"crossref","first-page":"461","DOI":"10.1287\/ijoc.1120.0514","volume":"25","author":"MC C\u00f4t\u00e9","year":"2013","unstructured":"C\u00f4t\u00e9, M. C., Gendron, B., & Rousseau, L. M. (2013). Grammar-based column generation for personalized multi-activity shift scheduling. INFORMS Journal on Computing, 25(3), 461\u2013474.","journal-title":"INFORMS Journal on Computing"},{"key":"544_CR9","doi-asserted-by":"crossref","first-page":"207","DOI":"10.1007\/s10951-014-0383-z","volume":"18","author":"S Dahmen","year":"2015","unstructured":"Dahmen, S., & Rekik, M. (2015). Solving multi-activity multi-day shift scheduling problems with a hybrid heuristic. Journal of Scheduling, 18, 207\u2013223.","journal-title":"Journal of Scheduling"},{"issue":"3","key":"544_CR10","doi-asserted-by":"crossref","first-page":"339","DOI":"10.1287\/opre.2.3.339","volume":"2","author":"GB Dantzig","year":"1954","unstructured":"Dantzig, G. B. (1954). Letter to the editor-a comment on Edie\u2019s traffic delays at toll booths. Journal of the Operations Research Society of America, 2(3), 339\u2013341.","journal-title":"Journal of the Operations Research Society of America"},{"key":"544_CR11","doi-asserted-by":"crossref","unstructured":"Demassey, S., Pesant, G., Rousseau, L. M. (2005). Constraint programming based column generation for employee timetabling. In Second international conference, CPAIOR 2005, May 2005, Prague, Czech Republic. Lecture Notes in Computer Science (Vol. 3524, pp. 140\u2013154). Berlin\/Heidelberg: Springer.","DOI":"10.1007\/11493853_12"},{"issue":"1","key":"544_CR12","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/S0377-2217(03)00095-X","volume":"153","author":"AT Ernst","year":"2004","unstructured":"Ernst, A. T., Jiang, H., Krishnamoorthy, M., & Sier, D. (2004). Staff scheduling and rostering: A review of applications, methods and models. European Journal of Operational Research, 153(1), 3\u201327.","journal-title":"European Journal of Operational Research"},{"key":"544_CR13","doi-asserted-by":"crossref","unstructured":"Fischetti, M., Liberti, L. (2012). Orbital shrinking. In Combinatorial optimization (pp. 48\u201358). New York, NY: Cambridge University Press.","DOI":"10.1007\/978-3-642-32147-4_6"},{"issue":"2","key":"544_CR14","doi-asserted-by":"crossref","first-page":"239","DOI":"10.1007\/s10951-010-0179-8","volume":"15","author":"Q Lequy","year":"2012","unstructured":"Lequy, Q., Bouchard, M., Desaulniers, G., Soumis, F., & Tachefine, B. (2012). Assigning multiple activities to work shifts. Journal of Scheduling, 15(2), 239\u2013251.","journal-title":"Journal of Scheduling"},{"issue":"4","key":"544_CR15","first-page":"299","volume":"7","author":"SL Moondra","year":"1976","unstructured":"Moondra, S. L. (1976). An lp model for work force scheduling for banks. Journal of Bank Research, 7(4), 299\u2013301.","journal-title":"Journal of Bank Research"},{"issue":"3","key":"544_CR16","doi-asserted-by":"crossref","first-page":"373","DOI":"10.1007\/s10732-009-9106-6","volume":"16","author":"CG Quimper","year":"2010","unstructured":"Quimper, C. G., & Rousseau, L. M. (2010). A large neighbourhood search approach to the multi-activity shift scheduling problem. Journal of Heuristics, 16(3), 373\u2013392.","journal-title":"Journal of Heuristics"},{"issue":"1","key":"544_CR17","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1023\/B:ANOR.0000019101.29692.2c","volume":"128","author":"M Rekik","year":"2004","unstructured":"Rekik, M., Cordeau, J. F., & Soumis, F. (2004). Using Benders decomposition to implicitly model tour scheduling. Annals of Operations Research, 128(1), 111\u2013133.","journal-title":"Annals of Operations Research"},{"issue":"2","key":"544_CR18","doi-asserted-by":"crossref","first-page":"229","DOI":"10.1051\/ro:2008006","volume":"42","author":"M Rekik","year":"2008","unstructured":"Rekik, M., Cordeau, J. F., & Soumis, F. (2008). Solution approaches to large shift scheduling problems. RAIRO-Operations Research, 42(2), 229\u2013258.","journal-title":"RAIRO-Operations Research"},{"issue":"1","key":"544_CR19","doi-asserted-by":"crossref","first-page":"49","DOI":"10.1007\/s10951-009-0114-z","volume":"13","author":"M Rekik","year":"2010","unstructured":"Rekik, M., Cordeau, J. F., & Soumis, F. (2010). Implicit shift scheduling with multiple breaks and work stretch duration restrictions. Journal of Scheduling, 13(1), 49\u201375.","journal-title":"Journal of Scheduling"},{"issue":"1","key":"544_CR20","doi-asserted-by":"crossref","first-page":"466","DOI":"10.1016\/j.ijpe.2012.06.030","volume":"140","author":"MI Restrepo","year":"2012","unstructured":"Restrepo, M. I., Lozano, L., & Medaglia, A. L. (2012). Constrained network-based column generation for the multi-activity shift scheduling problem. International Journal of Production Economics, 140(1), 466\u2013472.","journal-title":"International Journal of Production Economics"},{"key":"544_CR21","unstructured":"Salvagnin, D., Walsh, T. (2012). A hybrid MIP\/CP approach for multi-activity shift scheduling. In M. Milano (Ed.), Proceedings of the 18th international conference on principles and practice of constraint programming, CP 2012, Qu\u00e9bec City, QC, Canada, October 8\u201312, 2012 (pp. 633\u2013646). Berlin\/Heidelberg: Springer."},{"issue":"4","key":"544_CR22","doi-asserted-by":"crossref","first-page":"595","DOI":"10.1287\/mnsc.41.4.595","volume":"41","author":"GM Thompson","year":"1995","unstructured":"Thompson, G. M. (1995). Improved implicit optimal modeling of the labor shift scheduling problem. Management Science, 41(4), 595\u2013607.","journal-title":"Management Science"},{"issue":"3","key":"544_CR23","doi-asserted-by":"crossref","first-page":"367","DOI":"10.1016\/j.ejor.2012.11.029","volume":"226","author":"J Bergh Van den","year":"2013","unstructured":"Van den Bergh, J., Beli\u00ebn, J., De Bruecker, P., Demeulemeester, E., & De Boeck, L. (2013). Personnel scheduling: A literature review. European Journal of Operational Research, 226(3), 367\u2013385.","journal-title":"European Journal of Operational Research"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-017-0544-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-017-0544-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-017-0544-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2018,5,29]],"date-time":"2018-05-29T07:04:58Z","timestamp":1527577498000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-017-0544-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,10,11]]},"references-count":23,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2018,6]]}},"alternative-id":["544"],"URL":"https:\/\/doi.org\/10.1007\/s10951-017-0544-y","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,10,11]]}}}