{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,17]],"date-time":"2026-01-17T04:12:32Z","timestamp":1768623152350,"version":"3.49.0"},"reference-count":22,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2017,10,4]],"date-time":"2017-10-04T00:00:00Z","timestamp":1507075200000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100005089","name":"Beijing Municipal Natural Science Foundation","doi-asserted-by":"publisher","award":["9174038"],"award-info":[{"award-number":["9174038"]}],"id":[{"id":"10.13039\/501100005089","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100004543","name":"China Scholarship Council","doi-asserted-by":"publisher","id":[{"id":"10.13039\/501100004543","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100002858","name":"China Postdoctoral Science Foundation","doi-asserted-by":"publisher","award":["2012M510324"],"award-info":[{"award-number":["2012M510324"]}],"id":[{"id":"10.13039\/501100002858","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100000038","name":"the Discovery Grant of the Natural Science and Engineering Research Council of Canada","doi-asserted-by":"publisher","id":[{"id":"10.13039\/501100000038","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2018,8]]},"DOI":"10.1007\/s10951-017-0545-x","type":"journal-article","created":{"date-parts":[[2017,10,4]],"date-time":"2017-10-04T11:40:58Z","timestamp":1507117258000},"page":"387-411","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":14,"title":["Two-stage hybrid flowshop scheduling with simultaneous processing machines"],"prefix":"10.1007","volume":"21","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-3579-298X","authenticated-orcid":false,"given":"Bailin","family":"Wang","sequence":"first","affiliation":[]},{"given":"Kai","family":"Huang","sequence":"additional","affiliation":[]},{"given":"Tieke","family":"Li","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,10,4]]},"reference":[{"issue":"5","key":"545_CR1","doi-asserted-by":"crossref","first-page":"607","DOI":"10.1080\/10426910701323243","volume":"22","author":"JS Broughton","year":"2007","unstructured":"Broughton, J. S., Mahfouf, M., & Linkens, D. A. (2007). A paradigm for the scheduling of a continuous walking beam reheat furnace using a modified genetic algorithm. Materials and Manufacturing Processes, 22(5), 607\u2013614.","journal-title":"Materials and Manufacturing Processes"},{"key":"545_CR2","doi-asserted-by":"crossref","unstructured":"Cowling, P. (2003). A flexible decision support system for steel hot rolling mill scheduling. Computers & Industrial Engineering, 45(2), 307\u2013321.","DOI":"10.1016\/S0360-8352(03)00038-X"},{"key":"545_CR3","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1007\/978-1-4614-5152-5_5","volume-title":"Flow Shop Scheduling: Theoretical Results, Algorithms, and Applications","author":"H Emmons","year":"2013","unstructured":"Emmons, H., & Vairaktarakis, G. (2013). The hybrid flow shop. In F. S. Hillier (Ed.), Flow Shop Scheduling: Theoretical Results, Algorithms, and Applications (pp. 161\u2013187). New York: Springer."},{"issue":"5","key":"545_CR4","doi-asserted-by":"crossref","first-page":"655","DOI":"10.1287\/opre.12.5.655","volume":"12","author":"PC Gilmore","year":"1964","unstructured":"Gilmore, P. C., & Gomory, R. E. (1964). Sequencing a one state-variable machine: A solvable case of the traveling salesman problem. Operations Research, 12(5), 655\u2013679.","journal-title":"Operations Research"},{"issue":"2","key":"545_CR5","doi-asserted-by":"crossref","first-page":"450","DOI":"10.1016\/j.ejor.2008.03.039","volume":"196","author":"Y Goncharov","year":"2009","unstructured":"Goncharov, Y., & Sevastyanov, S. (2009). The flow shop problem with no-idle constraints: A review and approximation. European Journal of Operational Research, 196(2), 450\u2013456.","journal-title":"European Journal of Operational Research"},{"issue":"5","key":"545_CR6","doi-asserted-by":"crossref","first-page":"231","DOI":"10.1016\/S0167-6377(01)00104-3","volume":"29","author":"J Hurink","year":"2001","unstructured":"Hurink, J., & Knust, S. (2001). List scheduling in a parallel machine environment with precedence constraints and setup times. Operations Research Letters, 29(5), 231\u2013239.","journal-title":"Operations Research Letters"},{"key":"545_CR7","doi-asserted-by":"crossref","unstructured":"Jia, S. J., Yi, J., Yang, G. K., Du, B., & Zhu, J. (2013). A multi-objective optimisation algorithm for the hot rolling batch scheduling problem. International Journal of Production Research, 51(3), 667\u2013681.","DOI":"10.1080\/00207543.2011.654138"},{"issue":"1","key":"545_CR8","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1002\/nav.3800010110","volume":"1","author":"SM Johnson","year":"1954","unstructured":"Johnson, S. M. (1954). Optimal two- and three-stage production schedules with setup times included. Naval Research Logistics Quarterly, 1(1), 61\u201368.","journal-title":"Naval Research Logistics Quarterly"},{"issue":"9\u201312","key":"545_CR9","doi-asserted-by":"crossref","first-page":"1591","DOI":"10.1007\/s00170-013-5376-0","volume":"70","author":"M Khalili","year":"2014","unstructured":"Khalili, M. (2014). A multi-objective electromagnetism algorithm for a bi-objective hybrid no-wait flowshop scheduling problem. International Journal of Advanced Manufacturing Technology, 70(9\u201312), 1591\u20131601.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"1","key":"545_CR10","first-page":"43","volume":"8","author":"Z Liu","year":"2003","unstructured":"Liu, Z., Xie, J., Li, J., & Dong, J. (2003). A heuristic for two-stage no-wait hybrid flowshop scheduling with a single machine in either stage. Tsinghua Science and Technology, 8(1), 43\u201348.","journal-title":"Tsinghua Science and Technology"},{"key":"545_CR11","doi-asserted-by":"crossref","unstructured":"Mui, C., Osinski, E., Meech, J. a., & Barr, P. V. (1999). A SCADA-based expert system to provide delay strategies for a steel billet reheat furnace. In Proceedings of the Second International Conference on Intelligent Processing and Manufacturing of Materials. IPMM\u201999 (Cat. No.99EX296) (Vol. 1, pp. 111\u2013118). IEEE.","DOI":"10.1109\/IPMM.1999.792460"},{"issue":"1","key":"545_CR12","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1016\/0305-0483(83)90088-9","volume":"11","author":"M Nawaz","year":"1983","unstructured":"Nawaz, M., Enscore, E. E., & Ham, I. (1983). A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem. Omega, 11(1), 91\u201395.","journal-title":"Omega"},{"issue":"1","key":"545_CR13","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2009.09.024","volume":"205","author":"R Ruiz","year":"2010","unstructured":"Ruiz, R., & V\u00e1zquez-Rodr\u00edguez, J. A. (2010). The hybrid flow shop scheduling problem. European Journal of Operational Research, 205(1), 1\u201318.","journal-title":"European Journal of Operational Research"},{"issue":"6","key":"545_CR14","doi-asserted-by":"crossref","first-page":"1642","DOI":"10.1080\/00207543.2014.919418","volume":"53","author":"L Tang","year":"2015","unstructured":"Tang, L., Ren, H., & Yang, Y. (2015). Reheat furnace scheduling with energy consideration. International Journal of Production Research, 53(6), 1642\u20131660.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"545_CR15","doi-asserted-by":"crossref","first-page":"104","DOI":"10.1109\/TCST.2009.2014960","volume":"18","author":"L Tang","year":"2010","unstructured":"Tang, L., & Wang, X. (2010). A two-phase heuristic for the production scheduling of heavy plates in steel industry. IEEE Transactions on Control Systems Technology, 18(1), 104\u2013117.","journal-title":"IEEE Transactions on Control Systems Technology"},{"issue":"5","key":"545_CR16","doi-asserted-by":"crossref","first-page":"976","DOI":"10.1109\/TCST.2010.2060201","volume":"19","author":"L Tang","year":"2011","unstructured":"Tang, L., & Wang, X. (2011). A scatter search algorithm for a multistage production scheduling problem with blocking and semi-continuous batching machine. IEEE Transactions on Control Systems Technology, 19(5), 976\u2013989.","journal-title":"IEEE Transactions on Control Systems Technology"},{"issue":"6","key":"545_CR17","doi-asserted-by":"crossref","first-page":"992","DOI":"10.1016\/j.omega.2007.11.003","volume":"36","author":"L Tang","year":"2008","unstructured":"Tang, L., & Zhao, Y. (2008). Scheduling a single semi-continuous batching machine. Omega, 36(6), 992\u20131004.","journal-title":"Omega"},{"issue":"4","key":"545_CR18","doi-asserted-by":"crossref","first-page":"1064","DOI":"10.1016\/j.cor.2012.10.015","volume":"40","author":"S Wang","year":"2013","unstructured":"Wang, S., & Liu, M. (2013). A genetic algorithm for two-stage no-wait hybrid flow shop scheduling problem. Computers & Operations Research, 40(4), 1064\u20131075.","journal-title":"Computers & Operations Research"},{"key":"545_CR19","doi-asserted-by":"crossref","unstructured":"Wang, X., & Tang, L. (2008). Integration of batching and scheduling for hot rolling production in the steel industry. The International Journal of Advanced Manufacturing Technology, 36(5\u20136), 431\u2013441.","DOI":"10.1007\/s00170-006-0857-z"},{"issue":"6","key":"545_CR20","doi-asserted-by":"crossref","first-page":"609","DOI":"10.1016\/j.orl.2004.10.004","volume":"33","author":"Z Wang","year":"2005","unstructured":"Wang, Z., Xing, W., & Bai, F. (2005). No-wait flexible flowshop scheduling with no-idle machines. Operations Research Letters, 33(6), 609\u2013614.","journal-title":"Operations Research Letters"},{"key":"545_CR21","unstructured":"Yang, B., Liu, B., Yang, Y., Lin, Y., Chang, X., & Zhang, X. (2011). Fresh-cut processing preservation technology. Academic Periodical of Farm Products Processing, 10, 36\u201340."},{"key":"545_CR22","doi-asserted-by":"crossref","unstructured":"Zhao, J., & Wang, W. (2006). Charging plan model and scheduling algorithms for walking beam furnaces. In 2006 6th World Congress on Intelligent Control and Automation (pp. 7415\u20137418). IEEE.","DOI":"10.1109\/WCICA.2006.1714527"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-017-0545-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-017-0545-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-017-0545-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,10,4]],"date-time":"2019-10-04T03:41:16Z","timestamp":1570160476000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-017-0545-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,10,4]]},"references-count":22,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2018,8]]}},"alternative-id":["545"],"URL":"https:\/\/doi.org\/10.1007\/s10951-017-0545-x","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,10,4]]}}}