{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,1]],"date-time":"2026-04-01T14:46:22Z","timestamp":1775054782310,"version":"3.50.1"},"reference-count":25,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2021,7,23]],"date-time":"2021-07-23T00:00:00Z","timestamp":1626998400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2021,7,23]],"date-time":"2021-07-23T00:00:00Z","timestamp":1626998400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100002261","name":"INSERT","doi-asserted-by":"publisher","award":["20-01-00045"],"award-info":[{"award-number":["20-01-00045"]}],"id":[{"id":"10.13039\/501100002261","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100003182","name":"Siberian Branch, Russian Academy of Sciences","doi-asserted-by":"publisher","award":["0314-2019-0014"],"award-info":[{"award-number":["0314-2019-0014"]}],"id":[{"id":"10.13039\/501100003182","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2021,8]]},"DOI":"10.1007\/s10951-021-00694-7","type":"journal-article","created":{"date-parts":[[2021,7,23]],"date-time":"2021-07-23T21:02:30Z","timestamp":1627074150000},"page":"405-412","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":6,"title":["A new algorithm for the two-machine open shop and the polynomial solvability of a scheduling problem with routing"],"prefix":"10.1007","volume":"24","author":[{"given":"Antonina P.","family":"Khramova","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-5671-8562","authenticated-orcid":false,"given":"Ilya","family":"Chernykh","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2021,7,23]]},"reference":[{"issue":"1","key":"694_CR1","doi-asserted-by":"publisher","first-page":"165","DOI":"10.1287\/opre.47.1.165","volume":"47","author":"I Averbakh","year":"1999","unstructured":"Averbakh, I., & Berman, O. (1999). A simple heuristic for $$m$$-machine flow-shop and its applications in routing-scheduling problems. Operations Research, 47(1), 165\u2013170. https:\/\/doi.org\/10.1287\/opre.47.1.165.","journal-title":"Operations Research"},{"issue":"1","key":"694_CR2","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1016\/j.ejor.2003.06.050","volume":"166","author":"I Averbakh","year":"2005","unstructured":"Averbakh, I., Berman, O., & Chernykh, I. (2005). A 6\/5-approximation algorithm for the two-machine routing open-shop problem on a two-node network. European Journal of Operational Research, 166(1), 3\u201324. https:\/\/doi.org\/10.1016\/j.ejor.2003.06.050.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"694_CR3","doi-asserted-by":"publisher","first-page":"531","DOI":"10.1016\/j.ejor.2005.01.034","volume":"173","author":"I Averbakh","year":"2006","unstructured":"Averbakh, I., Berman, O., & Chernykh, I. (2006). The routing open-shop problem on a network: complexity and approximation. European Journal of Operational Research, 173(2), 531\u2013539. https:\/\/doi.org\/10.1016\/j.ejor.2005.01.034.","journal-title":"European Journal of Operational Research"},{"key":"694_CR4","doi-asserted-by":"publisher","unstructured":"Brucker, P.: Scheduling algorithms. Springer-Verlag Berlin Heidelberg (2007). https:\/\/doi.org\/10.1007\/978-3-540-69516-5","DOI":"10.1007\/978-3-540-69516-5"},{"key":"694_CR5","doi-asserted-by":"publisher","first-page":"81","DOI":"10.1023\/b:anor.0000030683.64615.c8","volume":"129","author":"P Brucker","year":"2004","unstructured":"Brucker, P., Knust, S., Edwin Cheng, T., & Shakhlevich, N. (2004). Complexity results for flow-shop and open-shop scheduling problems with transportation delays. Annals of Operations Research, 129, 81\u2013106. https:\/\/doi.org\/10.1023\/b:anor.0000030683.64615.c8.","journal-title":"Annals of Operations Research"},{"key":"694_CR6","doi-asserted-by":"publisher","unstructured":"Chernykh, I.: Routing open shop with unrelated travel times. In: Discrete Optimization and Operations Research \u2014 9th International Conference, DOOR 2016, Vladivostok, Russia, September 19-23, 2016, Proceedings, pp. 272\u2013283 (2016). https:\/\/doi.org\/10.1007\/978-3-319-44914-2_22","DOI":"10.1007\/978-3-319-44914-2_22"},{"issue":"3","key":"694_CR7","doi-asserted-by":"publisher","first-page":"841","DOI":"10.1016\/j.cor.2012.01.006","volume":"40","author":"I Chernykh","year":"2013","unstructured":"Chernykh, I., Kononov, A. V., & Sevastyanov, S. (2013). Efficient approximation algorithms for the routing open shop problem. Computers & OR, 40(3), 841\u2013847. https:\/\/doi.org\/10.1016\/j.cor.2012.01.006.","journal-title":"Computers & OR"},{"key":"694_CR8","unstructured":"Christofides, N.: Worst-case analysis of a new heuristic for the travelling salesman problem. Report 388, Graduate School of Industrial Administration, Carnegie-Mellon University, Pittsburg, PA (1976)"},{"key":"694_CR9","doi-asserted-by":"crossref","unstructured":"de\u00a0Werra, D.: Graph-theoretical models for preemptive scheduling. Advances in Project Scheduling pp. 171\u2013185 (1989). http:\/\/infoscience.epfl.ch\/record\/88562","DOI":"10.1016\/B978-0-444-87358-3.50012-2"},{"issue":"3","key":"694_CR10","doi-asserted-by":"publisher","first-page":"796","DOI":"10.1016\/j.ejor.2004.01.029","volume":"167","author":"C Esswein","year":"2005","unstructured":"Esswein, C., Billaut, J. C., & Strusevich, V. A. (2005). Two-machine shop scheduling: compromise between flexibility and makespan value. European Journal of Operational Research, 167(3), 796\u2013809. https:\/\/doi.org\/10.1016\/j.ejor.2004.01.029.","journal-title":"European Journal of Operational Research"},{"key":"694_CR11","doi-asserted-by":"publisher","unstructured":"Golovachev, M., Pyatkin, A.V.: Routing open shop with two nodes, unit processing times and equal number of jobs and machines. In: M.\u00a0Khachay, Y.\u00a0Kochetov, P.\u00a0Pardalos (eds.) Mathematical Optimization Theory and Operations Research, MOTOR 2019, Ekaterinburg, Russia, July 8\u201312, 2019, Proceedings, Lecture Notes in Computer Science, vol. 11548, pp. 264\u2013276 (2019). https:\/\/doi.org\/10.1007\/978-3-030-22629-9_19","DOI":"10.1007\/978-3-030-22629-9_19"},{"issue":"4","key":"694_CR12","doi-asserted-by":"publisher","first-page":"665","DOI":"10.1145\/321978.321985","volume":"23","author":"TF Gonzalez","year":"1976","unstructured":"Gonzalez, T. F., & Sahni, S. (1976). Open shop scheduling to minimize finish time. Journal of ACM, 23(4), 665\u2013679. https:\/\/doi.org\/10.1145\/321978.321985.","journal-title":"Journal of ACM"},{"key":"694_CR13","unstructured":"Johnson, S.M.: Optimal two- and three-stage production schedules with setup times included. Rand Corporation (1953). https:\/\/www.rand.org\/pubs\/papers\/P402.html"},{"issue":"6","key":"694_CR14","doi-asserted-by":"publisher","first-page":"55","DOI":"10.1016\/0895-7177(93)90196-6","volume":"17","author":"U Kleinau","year":"1993","unstructured":"Kleinau, U. (1993). Two-machine shop scheduling problems with batch processing. Mathematical and Computer Modelling, 17(6), 55\u201366. https:\/\/doi.org\/10.1016\/0895-7177(93)90196-6.","journal-title":"Mathematical and Computer Modelling"},{"issue":"3","key":"694_CR15","doi-asserted-by":"publisher","first-page":"318","DOI":"10.1134\/s1990478912030064","volume":"6","author":"A Kononov","year":"2012","unstructured":"Kononov, A. (2012). On the routing open shop problem with two machines on a two-vertex network. Journal of Applied and Industrial Mathematics, 6(3), 318\u2013331. https:\/\/doi.org\/10.1134\/s1990478912030064.","journal-title":"Journal of Applied and Industrial Mathematics"},{"key":"694_CR16","doi-asserted-by":"publisher","first-page":"383","DOI":"10.1051\/ro\/2014051","volume":"49","author":"A Kononov","year":"2015","unstructured":"Kononov, A. (2015). $$O(\\log m)$$-approximation for the routing open shop problem. RAIRO-Operations Research, 49, 383\u2013391. https:\/\/doi.org\/10.1051\/ro\/2014051.","journal-title":"RAIRO-Operations Research"},{"key":"694_CR17","doi-asserted-by":"publisher","unstructured":"Lawler, E.L., Lenstra, J.K., Rinnooy Kan, A.H.G., Shmoys, D.B.: Chapter 9. Sequencing and scheduling: Algorithms and complexity. In: Logistics of Production and Inventory, Handbooks in Operations Research and Management Science, vol.\u00a04, pp. 445\u2013522. Elsevier (1993). https:\/\/doi.org\/10.1016\/S0927-0507(05)80189-6","DOI":"10.1016\/S0927-0507(05)80189-6"},{"key":"694_CR18","doi-asserted-by":"publisher","unstructured":"Pinedo, M., Schrage, L.: Stochastic shop scheduling: a survey. In: M.A.H. Dempster, J.K. Lenstra, A.H.G. Rinnooy Kan (eds.) Deterministic and stochastic scheduling, NATO Advanced Study Institute Series, vol.\u00a084, pp. 181\u2013196. Springer, Dordrecht (1982). https:\/\/doi.org\/10.1007\/978-94-009-7801-0_9","DOI":"10.1007\/978-94-009-7801-0_9"},{"key":"694_CR19","first-page":"76","volume":"17","author":"A Serdyukov","year":"1978","unstructured":"Serdyukov, A. (1978). On some extremal routes in graphs (in russian). Upravlyaemye Sistemy, 17, 76\u201379.","journal-title":"Upravlyaemye Sistemy"},{"key":"694_CR20","doi-asserted-by":"publisher","first-page":"406","DOI":"10.33048\/semi.2019.16.023","volume":"16","author":"SV Sevastyanov","year":"2019","unstructured":"Sevastyanov, S. V. (2019). Some positive news on the proportionate open shop problem. Sibirskie Elektronnye Matematicheskie Izvestiya, 16, 406\u2013426. https:\/\/doi.org\/10.33048\/semi.2019.16.023.","journal-title":"Sibirskie Elektronnye Matematicheskie Izvestiya"},{"issue":"3","key":"694_CR21","doi-asserted-by":"publisher","first-page":"311","DOI":"10.1007\/s10951-013-0356-7","volume":"18","author":"AJ Soper","year":"2015","unstructured":"Soper, A. J. (2015). A cyclical search for the two machine flow shop and open shop to minimise finishing time. Journal of Scheduling, 18(3), 311\u2013314. https:\/\/doi.org\/10.1007\/s10951-013-0356-7.","journal-title":"Journal of Scheduling"},{"key":"694_CR22","doi-asserted-by":"publisher","unstructured":"van Bevern, R., Pyatkin, A.V.: Completing partial schedules for open shop with unit processing times and routing. In: Proceedings of the 11th International Computer Science Symposium in Russia (CSR-16). Lecture Notes in Computer Science, vol. 9691, pp. 73\u201387 (2016). https:\/\/doi.org\/10.1007\/978-3-319-34171-2_6","DOI":"10.1007\/978-3-319-34171-2_6"},{"key":"694_CR23","doi-asserted-by":"publisher","first-page":"42","DOI":"10.33048\/semi.2019.16.003","volume":"16","author":"R van Bevern","year":"2019","unstructured":"van Bevern, R., Pyatkin, A. V., & Sevastyanov, S. V. (2019). An algorithm with parameterized complexity of constructing the optimal schedule for the routing open shop problem with unit execution times. Siberian Electronic Mathematical Reports, 16, 42\u201384. https:\/\/doi.org\/10.33048\/semi.2019.16.003.","journal-title":"Siberian Electronic Mathematical Reports"},{"issue":"2","key":"694_CR24","doi-asserted-by":"publisher","first-page":"288","DOI":"10.1287\/opre.45.2.288","volume":"45","author":"DP Williamson","year":"1997","unstructured":"Williamson, D. P., Hall, L. A., Hoogeveen, J. A., Hurkens, C. A. J., Lenstra, J. K., Sevast\u2019janov, S. V., et al. (1997). Short shop schedules. Operations Research, 45(2), 288\u2013294. https:\/\/doi.org\/10.1287\/opre.45.2.288.","journal-title":"Operations Research"},{"issue":"3","key":"694_CR25","doi-asserted-by":"publisher","first-page":"719","DOI":"10.1016\/j.amc.2010.01.066","volume":"216","author":"VF Yu","year":"2010","unstructured":"Yu, V. F., Lin, S., & Chou, S. (2010). The museum visitor routing problem. Applied Mathematics and Computation, 216(3), 719\u2013729. https:\/\/doi.org\/10.1016\/j.amc.2010.01.066.","journal-title":"Applied Mathematics and Computation"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-021-00694-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10951-021-00694-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-021-00694-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,8,24]],"date-time":"2021-08-24T06:40:51Z","timestamp":1629787251000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10951-021-00694-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,7,23]]},"references-count":25,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2021,8]]}},"alternative-id":["694"],"URL":"https:\/\/doi.org\/10.1007\/s10951-021-00694-7","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,7,23]]},"assertion":[{"value":"1 July 2021","order":1,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"23 July 2021","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}