{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,10]],"date-time":"2026-06-10T11:59:48Z","timestamp":1781092788066,"version":"3.54.1"},"reference-count":45,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2022,10,7]],"date-time":"2022-10-07T00:00:00Z","timestamp":1665100800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2022,10,7]],"date-time":"2022-10-07T00:00:00Z","timestamp":1665100800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2023,6]]},"DOI":"10.1007\/s10951-022-00756-4","type":"journal-article","created":{"date-parts":[[2022,10,7]],"date-time":"2022-10-07T16:04:12Z","timestamp":1665158652000},"page":"251-266","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":43,"title":["Optimization of scheduling problems with deterioration effects and an optional maintenance activity"],"prefix":"10.1007","volume":"26","author":[{"given":"Xinyu","family":"Sun","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Tao","family":"Liu","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Xin-Na","family":"Geng","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Yang","family":"Hu","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Jing-Xiao","family":"Xu","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2022,10,7]]},"reference":[{"key":"756_CR1","doi-asserted-by":"publisher","first-page":"118","DOI":"10.1287\/opre.37.1.118","volume":"37","author":"UB Bagchi","year":"1989","unstructured":"Bagchi, U. B. (1989). Simultaneous Minimization of mean and variation of flow-time and waiting time in single machine systems. Operations Research, 37, 118\u2013125.","journal-title":"Operations Research"},{"issue":"1","key":"756_CR2","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/S0377-2217(02)00909-8","volume":"152","author":"TCE Cheng","year":"2004","unstructured":"Cheng, T. C. E., Ding, Q., & Lin, B. M. T. (2004). A concise survey of scheduling with time-dependent processing times. European Journal of Operational Research, 152(1), 1\u201313.","journal-title":"European Journal of Operational Research"},{"key":"756_CR3","doi-asserted-by":"publisher","first-page":"543","DOI":"10.1007\/s11590-012-0539-8","volume":"8","author":"TCE Cheng","year":"2014","unstructured":"Cheng, T. C. E., Tseng, S.-C., Lai, P.-J., & Lee, W.-C. (2014). Single-machine scheduling with accelerating deterioration effects. Optimization Letters, 8, 543\u2013554.","journal-title":"Optimization Letters"},{"key":"756_CR4","unstructured":"Gawiejnowicz, S. (2008). Time-dependent scheduling. Springer."},{"key":"756_CR5","doi-asserted-by":"crossref","unstructured":"Gawiejnowicz, S. (2020). Models and algorithms of time-dependent scheduling. Springer.","DOI":"10.1007\/978-3-662-59362-2"},{"key":"756_CR6","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1007\/s10951-019-00630-w","volume":"23","author":"S Gawiejnowicz","year":"2020","unstructured":"Gawiejnowicz, S. (2020). A review of four decades of time-dependent scheduling: Main results, new topics, and open problems. Journal of Scheduling, 23, 3\u201347.","journal-title":"Journal of Scheduling"},{"key":"756_CR7","unstructured":"Hardy, G. H., Littlewood, J. E., & Polya, G. (1967). Inequalities. Cambridge University Press."},{"key":"756_CR8","doi-asserted-by":"publisher","first-page":"4799","DOI":"10.1016\/j.ins.2011.06.010","volume":"181","author":"C-J Hsu","year":"2015","unstructured":"Hsu, C.-J., Cheng, T. C. E., & Yang, D.-L. (2015). Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time. Information Sciences, 181, 4799\u20134803.","journal-title":"Information Sciences"},{"issue":"1","key":"756_CR9","doi-asserted-by":"publisher","first-page":"1950031","DOI":"10.1142\/S0217595919500313","volume":"37","author":"X Huang","year":"2020","unstructured":"Huang, X., Yin, N., Liu, W.-W., & Wang, J.-B. (2020). Common due window assignment scheduling with proportional linear deterioration effects. Asia-Pacific Journal of Operational Research, 37(1), 1950031.","journal-title":"Asia-Pacific Journal of Operational Research"},{"issue":"3","key":"756_CR10","doi-asserted-by":"publisher","first-page":"437","DOI":"10.1007\/s10878-011-9415-1","volume":"26","author":"M Ji","year":"2013","unstructured":"Ji, M., Hsu, C.-J., & Yang, D.-L. (2013). Single-machine scheduling with deteriorating jobs and aging effects under an optional maintenance activity consideration. Journal of Combinatorial Optimization, 26(3), 437\u2013447.","journal-title":"Journal of Combinatorial Optimization"},{"issue":"4","key":"756_CR11","doi-asserted-by":"publisher","first-page":"1389","DOI":"10.1007\/s11590-012-0504-6","volume":"8","author":"P Ji","year":"2014","unstructured":"Ji, P., Li, G., Huo, Y., & Wang, J.-B. (2014). Single-machine common flow allowance scheduling with job-dependent aging effects and a deteriorating maintenance activity. Optimization Letters, 8(4), 1389\u20131400.","journal-title":"Optimization Letters"},{"key":"756_CR12","doi-asserted-by":"publisher","first-page":"1453","DOI":"10.1287\/mnsc.27.12.1453","volume":"27","author":"JJ Kanet","year":"1981","unstructured":"Kanet, J. J. (1981). Minimizing variation of flow time in single machine systems. Management Science, 27, 1453\u20131459.","journal-title":"Management Science"},{"issue":"1","key":"756_CR13","doi-asserted-by":"publisher","first-page":"119","DOI":"10.1016\/S0377-2217(99)00066-1","volume":"128","author":"C-L Lee","year":"2001","unstructured":"Lee, C.-L., & Leon, V.-J. (2001). Machine scheduling with a rate modifying activity. European Journal of Operational Research, 128(1), 119\u2013128.","journal-title":"European Journal of Operational Research"},{"key":"756_CR14","doi-asserted-by":"publisher","first-page":"713","DOI":"10.3934\/jimo.2016042","volume":"13","author":"C-L Liu","year":"2017","unstructured":"Liu, C.-L., Fan, Y., Zhao, C.-L., & Wang, J.-J. (2017). Multiple common due-dates assignment and optimal maintenance activity scheduling with linear deteriorating jobs. Journal of Industrial and Management Optimization, 13, 713\u2013720.","journal-title":"Journal of Industrial and Management Optimization"},{"issue":"5","key":"756_CR15","doi-asserted-by":"publisher","first-page":"862","DOI":"10.1080\/0305215X.2018.1500562","volume":"51","author":"F Liu","year":"2019","unstructured":"Liu, F., Yang, J., & Lu, Y.-Y. (2019). Solution algorithms for single-machine group scheduling with ready times and deteriorating jobs. Engineering Optimization, 51(5), 862\u2013874.","journal-title":"Engineering Optimization"},{"issue":"2","key":"756_CR16","doi-asserted-by":"publisher","first-page":"644","DOI":"10.1016\/j.ejor.2009.03.027","volume":"201","author":"JEJ Lodree","year":"2010","unstructured":"Lodree, J. E. J., & Geiger, C. D. (2010). A note on the optimal sequence position for a rate-modifying activity under simple linear deterioration. European Journal of Operational Research, 201(2), 644\u2013648.","journal-title":"European Journal of Operational Research"},{"key":"756_CR17","doi-asserted-by":"publisher","first-page":"3447","DOI":"10.1016\/j.apm.2015.09.081","volume":"40","author":"Y-Y Lu","year":"2016","unstructured":"Lu, Y.-Y. (2016). Research on no-idle permutation flowshop scheduling with time-dependent learning effect and deteriorating jobs. Applied Mathematical Modelling, 40, 3447\u20133450.","journal-title":"Applied Mathematical Modelling"},{"key":"756_CR18","doi-asserted-by":"publisher","first-page":"168","DOI":"10.1016\/j.asoc.2018.02.018","volume":"66","author":"S Lu","year":"2018","unstructured":"Lu, S., Liu, X., Pei, J., Thai, M. T., & Pardalos, P. M. (2018). A hybrid ABC-TS algorithm for the unrelated parallel-batching machines scheduling problem with deteriorating jobs and maintenance activity. Applied Soft Computing, 66, 168\u2013182.","journal-title":"Applied Soft Computing"},{"key":"756_CR19","doi-asserted-by":"publisher","first-page":"199","DOI":"10.1016\/j.cie.2009.04.014","volume":"58","author":"Y Ma","year":"2010","unstructured":"Ma, Y., Chu, C., & Zuo, C. (2010). A survey of scheduling with deterministic machine availability constraints. Computers & Industrial Engineering, 58, 199\u2013211.","journal-title":"Computers & Industrial Engineering"},{"key":"756_CR20","doi-asserted-by":"publisher","first-page":"33","DOI":"10.1016\/j.cor.2014.11.016","volume":"57","author":"B Mor","year":"2015","unstructured":"Mor, B., & Mosheiov, G. (2015). Scheduling a deteriorating maintenance activity and due-window assignment. Computers and Operations Research, 57, 33\u201340.","journal-title":"Computers and Operations Research"},{"issue":"4","key":"756_CR21","doi-asserted-by":"publisher","first-page":"619","DOI":"10.1016\/j.camwa.2008.11.008","volume":"57","author":"G Mosheiov","year":"2009","unstructured":"Mosheiov, G., & Sarig, A. (2009). Scheduling a maintenance activity to minimize total weighted completion-time. Computers and Mathematics with Applications, 57(4), 619\u2013623.","journal-title":"Computers and Mathematics with Applications"},{"issue":"5","key":"756_CR22","doi-asserted-by":"publisher","first-page":"882","DOI":"10.1057\/jors.2009.5","volume":"61","author":"G Mosheiov","year":"2010","unstructured":"Mosheiov, G., & Sidney, J. B. (2010). Scheduling a deteriorating maintenance activity on a single machine. Journal of the Operational Research Society, 61(5), 882\u2013887.","journal-title":"Journal of the Operational Research Society"},{"key":"756_CR23","doi-asserted-by":"publisher","first-page":"191","DOI":"10.1007\/s10479-019-03160-y","volume":"294","author":"J Pei","year":"2020","unstructured":"Pei, J., Wei, J., Liao, B., & Liu, X. (2020). Two-agent scheduling on bounded parallel-batching machines with an aging effect of job-position-dependent. Annals of Operations Research, 294, 191\u2013223.","journal-title":"Annals of Operations Research"},{"issue":"1","key":"756_CR24","doi-asserted-by":"publisher","first-page":"166","DOI":"10.1016\/j.omega.2013.05.005","volume":"42","author":"K Rustogi","year":"2014","unstructured":"Rustogi, K., & Strusevich, V. A. (2014). Combining time and position dependent effects on a single machine subject to rate modifying activities. Omega, 42(1), 166\u2013178.","journal-title":"Omega"},{"key":"756_CR25","doi-asserted-by":"publisher","first-page":"500","DOI":"10.1057\/jors.2014.18","volume":"66","author":"K Rustogi","year":"2015","unstructured":"Rustogi, K., & Strusevich, V. A. (2015). Single machine scheduling with time-dependent linear deterioration and rate-modifying maintenance. Journal of the Operational Research Society, 66, 500\u2013515.","journal-title":"Journal of the Operational Research Society"},{"key":"756_CR26","doi-asserted-by":"crossref","unstructured":"Strusevich, V. A., & Rustogi, K. (2017). Scheduling with time-changing effects and rate-modifying activities. Springer.","DOI":"10.1007\/978-3-319-39574-6"},{"issue":"10","key":"756_CR27","doi-asserted-by":"publisher","first-page":"3186","DOI":"10.1080\/00207543.2019.1566675","volume":"57","author":"X-Y Sun","year":"2019","unstructured":"Sun, X.-Y., & Geng, X.-N. (2019). Single machine scheduling with deteriorating effects and machine maintenance. International Journal of Production Research, 57(10), 3186\u20133199.","journal-title":"International Journal of Production Research"},{"key":"756_CR28","doi-asserted-by":"publisher","first-page":"47","DOI":"10.1093\/comjnl\/bxx032","volume":"61","author":"J-B Wang","year":"2018","unstructured":"Wang, J.-B., & Li, L. (2018). Machine scheduling with deteriorating jobs and modifying maintenance activities. The Computer Journal, 61, 47\u201353.","journal-title":"The Computer Journal"},{"issue":"2","key":"756_CR29","doi-asserted-by":"publisher","first-page":"231","DOI":"10.1080\/0305215X.2018.1454442","volume":"51","author":"J-B Wang","year":"2019","unstructured":"Wang, J.-B., & Liang, X.-X. (2019). Group scheduling with deteriorating jobs and allotted resource under limited resource availability constraint. Engineering Optimization, 51(2), 231\u2013246.","journal-title":"Engineering Optimization"},{"key":"756_CR30","doi-asserted-by":"publisher","first-page":"87","DOI":"10.1007\/s11590-010-0253-3","volume":"6","author":"J-B Wang","year":"2012","unstructured":"Wang, J.-B., & Wang, M.-Z. (2012). Single-machine scheduling with nonlinear deterioration. Optimization Letters, 6, 87\u201398.","journal-title":"Optimization Letters"},{"issue":"2","key":"756_CR31","doi-asserted-by":"publisher","first-page":"547","DOI":"10.1016\/j.cor.2012.08.006","volume":"40","author":"J-B Wang","year":"2013","unstructured":"Wang, J.-B., & Wang, M.-Z. (2013). Minimizing makespan in three-machine flow shops with deteriorating jobs. Computers and Operations Research, 40(2), 547\u2013557.","journal-title":"Computers and Operations Research"},{"key":"756_CR32","doi-asserted-by":"publisher","first-page":"226","DOI":"10.1016\/j.ins.2014.02.034","volume":"275","author":"J-B Wang","year":"2014","unstructured":"Wang, J.-B., & Wang, J.-J. (2014). Single machine group scheduling with time dependent processing times and ready times. Information Sciences, 275, 226\u2013231.","journal-title":"Information Sciences"},{"key":"756_CR33","doi-asserted-by":"publisher","first-page":"1172","DOI":"10.1016\/j.apm.2014.07.028","volume":"39","author":"J-B Wang","year":"2015","unstructured":"Wang, J.-B., & Wang, J.-J. (2015). Single-machine scheduling problems with precedence constraints and simple linear deterioration. Applied Mathematical Modelling, 39, 1172\u20131182.","journal-title":"Applied Mathematical Modelling"},{"key":"756_CR34","doi-asserted-by":"publisher","first-page":"8093","DOI":"10.1016\/j.amc.2011.03.010","volume":"177","author":"J-B Wang","year":"2011","unstructured":"Wang, J.-B., & Wei, C.-M. (2011). Parallel machine scheduling with a deteriorating maintenance activity and total absolute differences penalties. Applied Mathematics and Computation, 177, 8093\u20138099.","journal-title":"Applied Mathematics and Computation"},{"issue":"5","key":"756_CR35","doi-asserted-by":"publisher","first-page":"1650034","DOI":"10.1142\/S0217595916500342","volume":"33","author":"Z Wang","year":"2016","unstructured":"Wang, Z., Wei, C., & Wu, Y.-B. (2016). Single machine two-agent scheduling with deteriorating jobs. Asia-Pacific Journal of Operational Research, 33(5), 1650034.","journal-title":"Asia-Pacific Journal of Operational Research"},{"key":"756_CR36","doi-asserted-by":"publisher","first-page":"109","DOI":"10.1016\/j.ins.2013.08.030","volume":"256","author":"C-C Wu","year":"2014","unstructured":"Wu, C.-C., Wu, W.-H., Wu, W.-H., Hsu, P.-H., Yin, Y., & Xu, J. (2014). A single-machine scheduling with a truncated linear deterioration and ready times. Information Sciences, 256, 109\u2013125.","journal-title":"Information Sciences"},{"issue":"3","key":"756_CR37","doi-asserted-by":"publisher","first-page":"1345","DOI":"10.1080\/00207543.2017.1346317","volume":"56","author":"X Xiong","year":"2018","unstructured":"Xiong, X., Wang, D., Cheng, T. C. E., Wu, C., & Yin, Y. (2018). Single-machine scheduling and common due date assignment with potential machine disruption. International Journal of Production Research, 56(3), 1345\u20131360.","journal-title":"International Journal of Production Research"},{"key":"756_CR38","doi-asserted-by":"publisher","first-page":"1924","DOI":"10.1016\/j.cor.2009.11.012","volume":"37","author":"K Xu","year":"2010","unstructured":"Xu, K., Feng, Z., & Jun, K. (2010). A tabu-search algorithm for scheduling jobs with controllable processing times on a single machine to meet due-dates. Computers & Operations Research, 37, 1924\u20131938.","journal-title":"Computers & Operations Research"},{"issue":"7","key":"756_CR39","doi-asserted-by":"publisher","first-page":"2161","DOI":"10.1016\/j.camwa.2010.08.003","volume":"60","author":"S-J Yang","year":"2010","unstructured":"Yang, S.-J., & Yang, D.-L. (2010). Minimizing the total completion time in single-machine scheduling with aging\/deteriorating effects and deteriorating maintenance activities. Computers & Mathematics with Applications, 60(7), 2161\u20132169.","journal-title":"Computers & Mathematics with Applications"},{"key":"756_CR40","doi-asserted-by":"publisher","first-page":"177","DOI":"10.1016\/j.cie.2015.01.002","volume":"81","author":"Y Yin","year":"2015","unstructured":"Yin, Y., Cheng, T. C. E., Wan, L., Wu, C.-C., & Liu, J. (2015). Two-agent single-machine scheduling with deteriorating jobs. Computers and Industrial Engineering, 81, 177\u2013185.","journal-title":"Computers and Industrial Engineering"},{"key":"756_CR41","doi-asserted-by":"publisher","first-page":"242","DOI":"10.1007\/s10878-014-9739-8","volume":"30","author":"S Yu","year":"2015","unstructured":"Yu, S. (2015). An optimal single-machine scheduling with linear deterioration rate and rate-modifying activities. Journal of Combinatorial Optimization, 30, 242\u2013252.","journal-title":"Journal of Combinatorial Optimization"},{"issue":"8","key":"756_CR42","doi-asserted-by":"publisher","first-page":"1388","DOI":"10.1080\/0305215X.2016.1248180","volume":"49","author":"X Zhang","year":"2017","unstructured":"Zhang, X., Lin, W.-C., Wu, W.-H., & Wu, C.-C. (2017). Single-machine common\/slack due window assignment problems with linear decreasing processing times. Engineering Optimization, 49(8), 1388\u20131400.","journal-title":"Engineering Optimization"},{"issue":"3","key":"756_CR43","doi-asserted-by":"publisher","first-page":"439","DOI":"10.1057\/s41274-017-0200-0","volume":"69","author":"X Zhang","year":"2018","unstructured":"Zhang, X., Wu, W.-H., Lin, W.-C., & Wu, C.-C. (2018). Machine scheduling problems under deteriorating effects and deteriorating rate-modifying activities. Journal of the Operational Research Society, 69(3), 439\u2013448.","journal-title":"Journal of the Operational Research Society"},{"issue":"5","key":"756_CR44","doi-asserted-by":"publisher","first-page":"1956","DOI":"10.1111\/itor.12393","volume":"26","author":"Z Zhu","year":"2019","unstructured":"Zhu, Z., Liu, M., Chu, C., & Li, J. (2019). Multitasking scheduling with multiple rate-modifying activities. International Transactions in Operational Research, 26(5), 1956\u20131976.","journal-title":"International Transactions in Operational Research"},{"issue":"1","key":"756_CR45","doi-asserted-by":"publisher","first-page":"296","DOI":"10.1080\/00207543.2016.1208852","volume":"55","author":"Z Zhu","year":"2017","unstructured":"Zhu, Z., Zheng, F., & Chu, C. (2017). Multitasking scheduling problems with a rate-modifying activity. International Journal of Production Research, 55(1), 296\u2013312.","journal-title":"International Journal of Production Research"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-022-00756-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10951-022-00756-4\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-022-00756-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,6,8]],"date-time":"2023-06-08T03:31:31Z","timestamp":1686195091000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10951-022-00756-4"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,10,7]]},"references-count":45,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2023,6]]}},"alternative-id":["756"],"URL":"https:\/\/doi.org\/10.1007\/s10951-022-00756-4","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2022,10,7]]},"assertion":[{"value":"9 September 2022","order":1,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"7 October 2022","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}