{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,14]],"date-time":"2026-04-14T16:02:19Z","timestamp":1776182539490,"version":"3.50.1"},"reference-count":25,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2023,6,8]],"date-time":"2023-06-08T00:00:00Z","timestamp":1686182400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2023,6,8]],"date-time":"2023-06-08T00:00:00Z","timestamp":1686182400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2023,8]]},"DOI":"10.1007\/s10951-023-00777-7","type":"journal-article","created":{"date-parts":[[2023,6,8]],"date-time":"2023-06-08T14:02:34Z","timestamp":1686232954000},"page":"335-351","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":7,"title":["Lot streaming for a two-stage assembly system in the presence of handling costs"],"prefix":"10.1007","volume":"26","author":[{"given":"Niloy J.","family":"Mukherjee","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-1744-2281","authenticated-orcid":false,"given":"Subhash C.","family":"Sarin","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Daniel A.","family":"Neira","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2023,6,8]]},"reference":[{"issue":"2","key":"777_CR1","first-page":"109","volume":"3","author":"FS Al-Anzi","year":"2006","unstructured":"Al-Anzi, F. S., & Allahverdi, A. (2006). A hybrid Tabu search heuristic for the two-stage assembly scheduling problem. International Journal of Operations Research, 3(2), 109\u2013119.","journal-title":"International Journal of Operations Research"},{"issue":"1","key":"777_CR2","doi-asserted-by":"publisher","first-page":"80","DOI":"10.1016\/j.ejor.2006.09.011","volume":"182","author":"FS Al-Anzi","year":"2007","unstructured":"Al-Anzi, F. S., & Allahverdi, A. (2007). A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times. European Journal of Operational Research, 182(1), 80\u201394.","journal-title":"European Journal of Operational Research"},{"issue":"9","key":"777_CR3","doi-asserted-by":"publisher","first-page":"2682","DOI":"10.1016\/j.cor.2008.11.018","volume":"36","author":"FS Al-Anzi","year":"2009","unstructured":"Al-Anzi, F. S., & Allahverdi, A. (2009). Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan. Computers & Operations Research, 36(9), 2682\u20132689.","journal-title":"Computers & Operations Research"},{"issue":"8","key":"777_CR4","doi-asserted-by":"publisher","first-page":"695","DOI":"10.1080\/0740817X.2011.649384","volume":"44","author":"A Alfieri","year":"2012","unstructured":"Alfieri, A., Glass, C., & van de Velde, S. (2012). Two-machine lot streaming with attached setup times. IIE Transactions, 44(8), 695\u2013710.","journal-title":"IIE Transactions"},{"issue":"22","key":"777_CR5","doi-asserted-by":"publisher","first-page":"4713","DOI":"10.1080\/00207540600621029","volume":"44","author":"A Allahverdi","year":"2006","unstructured":"Allahverdi, A., & Al-Anzi, F. S. (2006). Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times. International Journal of Production Research, 44(22), 4713\u20134735.","journal-title":"International Journal of Production Research"},{"issue":"4","key":"777_CR6","doi-asserted-by":"publisher","first-page":"1056","DOI":"10.1016\/j.cor.2004.09.002","volume":"33","author":"A Allahverdi","year":"2006","unstructured":"Allahverdi, A., & Al-Anzi, F. S. (2006). A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application. Computers & Operations Research, 33(4), 1056\u20131080.","journal-title":"Computers & Operations Research"},{"issue":"1","key":"777_CR7","doi-asserted-by":"publisher","first-page":"166","DOI":"10.1007\/s00170-007-0950-y","volume":"37","author":"A Allahverdi","year":"2008","unstructured":"Allahverdi, A., & Al-Anzi, F. S. (2008). The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time. The International Journal of Advanced Manufacturing Technology, 37(1), 166\u2013177.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"777_CR8","doi-asserted-by":"crossref","unstructured":"Allahverdi, A., & Al-Anzi, F. S. (2009). The two-stage assembly scheduling problem to minimize total completion time with setup times. Computers & Operations Research, 36(10), 2740\u20132747.","DOI":"10.1016\/j.cor.2008.12.001"},{"key":"777_CR9","volume-title":"Principles of sequencing and scheduling","author":"KR Baker","year":"2013","unstructured":"Baker, K. R., & Trietsch, D. (2013). Principles of sequencing and scheduling. New York: Wiley."},{"key":"777_CR10","first-page":"147","volume":"5","author":"G Birkhoff","year":"1946","unstructured":"Birkhoff, G. (1946). Tres observaciones sobre el algebra lineal. Universidad Nacional de Tucum\u00e1n Ser A, 5, 147\u2013154.","journal-title":"Universidad Nacional de Tucum\u00e1n Ser A"},{"issue":"23\u201324","key":"777_CR11","doi-asserted-by":"publisher","first-page":"7023","DOI":"10.1080\/00207543.2013.774506","volume":"51","author":"M Cheng","year":"2013","unstructured":"Cheng, M., Mukherjee, N., & Sarin, S. (2013). A review of lot streaming. International Journal of Production Research, 51(23\u201324), 7023\u20137046.","journal-title":"International Journal of Production Research"},{"issue":"4","key":"777_CR12","doi-asserted-by":"publisher","first-page":"439","DOI":"10.1051\/ro:1999120","volume":"33","author":"M Haouari","year":"1999","unstructured":"Haouari, M., & Daouas, T. (1999). Optimal scheduling of the $$3$$-machine assembly-type flow shop. RAIRO-Operations Research-Recherche Op\u00e9rationnelle, 33(4), 439\u2013445.","journal-title":"RAIRO-Operations Research-Recherche Op\u00e9rationnelle"},{"issue":"3","key":"777_CR13","doi-asserted-by":"publisher","first-page":"547","DOI":"10.1016\/S0377-2217(96)00312-8","volume":"103","author":"A Hariri","year":"1997","unstructured":"Hariri, A., & Potts, C. (1997). A branch and bound algorithm for the two-stage assembly scheduling problem. European Journal of Operational Research, 103(3), 547\u2013556.","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"777_CR14","doi-asserted-by":"publisher","first-page":"1005","DOI":"10.1007\/s10845-015-1041-9","volume":"28","author":"T \u0130nkaya","year":"2017","unstructured":"\u0130nkaya, T., & Akansel, M. (2017). Coordinated scheduling of the transfer lots in an assembly-type supply chain: A genetic algorithm approach. Journal of Intelligent Manufacturing, 28(4), 1005\u20131015.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"10","key":"777_CR15","doi-asserted-by":"publisher","first-page":"2926","DOI":"10.1080\/00207543.2018.1550269","volume":"57","author":"G Komaki","year":"2019","unstructured":"Komaki, G., Sheikh, S., & Malakooti, B. (2019). Flow shop scheduling problems with assembly operations: A review and new trends. International Journal of Production Research, 57(10), 2926\u20132955.","journal-title":"International Journal of Production Research"},{"issue":"5","key":"777_CR16","doi-asserted-by":"publisher","first-page":"616","DOI":"10.1287\/mnsc.39.5.616","volume":"39","author":"C-Y Lee","year":"1993","unstructured":"Lee, C.-Y., Cheng, T., & Lin, B. M. T. (1993). Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. Management Science, 39(5), 616\u2013625.","journal-title":"Management Science"},{"issue":"6","key":"777_CR17","doi-asserted-by":"publisher","first-page":"1623","DOI":"10.1080\/00207543.2016.1200760","volume":"55","author":"NJ Mukherjee","year":"2017","unstructured":"Mukherjee, N. J., Sarin, S. C., & Singh, S. (2017). Lot streaming in the presence of learning in sublot-attached setup times and processing times. International Journal of Production Research, 55(6), 1623\u20131639.","journal-title":"International Journal of Production Research"},{"issue":"6","key":"777_CR18","doi-asserted-by":"publisher","first-page":"297","DOI":"10.1016\/0167-6377(89)90013-8","volume":"8","author":"C Potts","year":"1989","unstructured":"Potts, C., & Baker, K. (1989). Flow shop scheduling with lot streaming. Operations Research Letters, 8(6), 297\u2013303.","journal-title":"Operations Research Letters"},{"issue":"2","key":"777_CR19","doi-asserted-by":"publisher","first-page":"346","DOI":"10.1287\/opre.43.2.346","volume":"43","author":"CN Potts","year":"1995","unstructured":"Potts, C. N., Sevast\u2019Janov, S., Strusevich, V. A., Van Wassenhove, L. N., & Zwaneveld, C. M. (1995). The two-stage assembly scheduling problem: Complexity and approximation. Operations Research, 43(2), 346\u2013355.","journal-title":"Operations Research"},{"issue":"1\u20132","key":"777_CR20","doi-asserted-by":"publisher","first-page":"90","DOI":"10.1504\/IJPS.2011.044604","volume":"1","author":"SC Sarin","year":"2011","unstructured":"Sarin, S. C., Yao, L., & Trietsch, D. (2011). Single batch lot streaming in a two stage assembly system. International Journal of Planning and Scheduling, 1(1\u20132), 90\u2013108.","journal-title":"International Journal of Planning and Scheduling"},{"issue":"8","key":"777_CR21","doi-asserted-by":"publisher","first-page":"695","DOI":"10.1080\/07408179908969869","volume":"31","author":"C Sriskandarajah","year":"1999","unstructured":"Sriskandarajah, C., & Wagneur, E. (1999). Lot streaming and scheduling multiple products in two-machine no-wait flowshops. IIE Transactions, 31(8), 695\u2013707.","journal-title":"IIE Transactions"},{"issue":"3","key":"777_CR22","doi-asserted-by":"publisher","first-page":"498","DOI":"10.1016\/S0377-2217(02)00245-X","volume":"146","author":"X Sun","year":"2003","unstructured":"Sun, X., Morizawa, K., & Nagasawa, H. (2003). Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling. European Journal of Operational Research, 146(3), 498\u2013516.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"777_CR23","doi-asserted-by":"publisher","first-page":"309","DOI":"10.1016\/S0305-0548(01)00098-3","volume":"30","author":"A Tozkapan","year":"2003","unstructured":"Tozkapan, A., K\u0131rca, \u00d6., & Chung, C.-S. (2003). A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem. Computers & Operations Research, 30(2), 309\u2013320.","journal-title":"Computers & Operations Research"},{"issue":"6","key":"777_CR24","doi-asserted-by":"publisher","first-page":"1065","DOI":"10.1287\/opre.41.6.1065","volume":"41","author":"D Trietsch","year":"1993","unstructured":"Trietsch, D., & Baker, K. R. (1993). Basic techniques for lot streaming. Operations Research, 41(6), 1065\u20131076.","journal-title":"Operations Research"},{"key":"777_CR25","doi-asserted-by":"crossref","unstructured":"Yao, L., & Sarin, S.\u00a0C. (2014). Multiple-lot lot streaming in a two-stage assembly system. In Essays in production, project planning and scheduling (pp. 357\u2013388), Berlin: Springer .","DOI":"10.1007\/978-1-4614-9056-2_15"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-023-00777-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10951-023-00777-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-023-00777-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,7,18]],"date-time":"2023-07-18T09:04:03Z","timestamp":1689671043000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10951-023-00777-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,6,8]]},"references-count":25,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2023,8]]}},"alternative-id":["777"],"URL":"https:\/\/doi.org\/10.1007\/s10951-023-00777-7","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023,6,8]]},"assertion":[{"value":"29 January 2023","order":1,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"8 June 2023","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}