{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,26]],"date-time":"2026-06-26T08:25:48Z","timestamp":1782462348678,"version":"3.54.5"},"reference-count":57,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2025,8,21]],"date-time":"2025-08-21T00:00:00Z","timestamp":1755734400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2025,8,21]],"date-time":"2025-08-21T00:00:00Z","timestamp":1755734400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2025,12]]},"DOI":"10.1007\/s10951-025-00849-w","type":"journal-article","created":{"date-parts":[[2025,8,21]],"date-time":"2025-08-21T12:48:39Z","timestamp":1755780519000},"page":"615-637","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Sustainable scheduling for a flexible job shop considering batch processing and batch transportation strategies"],"prefix":"10.1007","volume":"28","author":[{"given":"Enguang","family":"Guan","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Jiahui","family":"Wang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-1548-4637","authenticated-orcid":false,"given":"Jianguo","family":"Duan","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2025,8,21]]},"reference":[{"key":"849_CR1","first-page":"1706","volume":"29","author":"A Boudjemline","year":"2022","unstructured":"Boudjemline, A., Chaudhry, I. A., Rafique, A. F., Elbadawi, I. A. Q., Aichouni, M., & Boujelbene, M. (2022). Multi-objective flexible job shop scheduling using genetic algorithms. Tehnicki Vjesnik-Technical Gazette, 29, 1706\u20131713.","journal-title":"Tehnicki Vjesnik-Technical Gazette"},{"key":"849_CR2","doi-asserted-by":"publisher","first-page":"172","DOI":"10.1016\/j.cor.2017.04.004","volume":"85","author":"A Che","year":"2017","unstructured":"Che, A., Wu, X. Q., Peng, J., & Yan, P. Y. (2017). Energy-efficient bi-objective single-machine scheduling with power-down mechanism. Computers & Operations Research, 85, 172\u2013183.","journal-title":"Computers & Operations Research"},{"key":"849_CR3","doi-asserted-by":"publisher","first-page":"110968","DOI":"10.1016\/j.knosys.2023.110968","volume":"279","author":"L Cheng","year":"2023","unstructured":"Cheng, L., Tang, Q., Liu, S., & Zhang, L. (2023). Mathematical model and augmented simulated annealing algorithm for mixed-model assembly job shop scheduling problem with batch transfer. Knowledge-Based Systems, 279, 110968.","journal-title":"Knowledge-Based Systems"},{"key":"849_CR4","doi-asserted-by":"publisher","first-page":"107729","DOI":"10.1016\/j.engappai.2023.107729","volume":"130","author":"L Cheng","year":"2024","unstructured":"Cheng, L., Tang, Q., & Zhang, L. (2024). Production costs and total completion time minimization for three-stage mixed-model assembly job shop scheduling with lot streaming and batch transfer. Engineering Applications of Artificial Intelligence, 130, 107729.","journal-title":"Engineering Applications of Artificial Intelligence"},{"key":"849_CR5","doi-asserted-by":"publisher","first-page":"143","DOI":"10.1016\/j.rcim.2019.04.006","volume":"59","author":"M Dai","year":"2019","unstructured":"Dai, M., Tang, D. B., Adriana, G., & Miguel, A. S. (2019). Multi-objective optimization for energy-efficient flexible job shop scheduling problem with transportation constraints. Robotics and Computer-Integrated Manufacturing, 59, 143\u2013157.","journal-title":"Robotics and Computer-Integrated Manufacturing"},{"issue":"5","key":"849_CR6","doi-asserted-by":"publisher","first-page":"418","DOI":"10.1016\/j.rcim.2013.04.001","volume":"29","author":"M Dai","year":"2013","unstructured":"Dai, M., Tang, D. B., Giret, A., Salido, M. A., & Li, W. D. (2013). Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithm. Robotics and Computer-Integrated Manufacturing, 29(5), 418\u2013429.","journal-title":"Robotics and Computer-Integrated Manufacturing"},{"issue":"2","key":"849_CR7","doi-asserted-by":"publisher","first-page":"182","DOI":"10.1109\/4235.996017","volume":"6","author":"K Deb","year":"2002","unstructured":"Deb, K., Pratap, A., Agarwal, S., & Meyarivan, T. (2002). A fast and elitist multiobjective genetic algorithm: NSGA-II. IEEE Transactions on Evolutionary Computation, 6(2), 182\u2013197.","journal-title":"IEEE Transactions on Evolutionary Computation"},{"key":"849_CR8","doi-asserted-by":"publisher","first-page":"290","DOI":"10.1016\/j.procs.2018.07.036","volume":"133","author":"HS Dewang","year":"2018","unstructured":"Dewang, H. S., Mohanty, P. K., & Kundu, S. (2018). A robust path planning for mobile robot using smart particle swarm optimization. Procedia Computer Science, 133, 290\u2013297.","journal-title":"Procedia Computer Science"},{"key":"849_CR9","doi-asserted-by":"publisher","first-page":"313","DOI":"10.1016\/j.neucom.2020.07.004","volume":"414","author":"HJ Ding","year":"2020","unstructured":"Ding, H. J., & Gu, X. S. (2020). Hybrid of human learning optimization algorithm and particle swarm optimization algorithm with scheduling strategies for the flexible job-shop scheduling problem. Neurocomputing, 414, 313\u2013332.","journal-title":"Neurocomputing"},{"key":"849_CR10","doi-asserted-by":"publisher","first-page":"107677","DOI":"10.1016\/j.cie.2021.107677","volume":"161","author":"J Duan","year":"2021","unstructured":"Duan, J., & Wang, J. (2021). Energy-efficient scheduling for a flexible job shop with machine breakdowns considering machine idle time arrangement and machine speed level selection. Computers & Industrial Engineering, 161, 107677.","journal-title":"Computers & Industrial Engineering"},{"key":"849_CR12","doi-asserted-by":"publisher","first-page":"124461","DOI":"10.1016\/j.jclepro.2020.124461","volume":"280","author":"JG Duan","year":"2021","unstructured":"Duan, J. G., Zhang, Q. L., Zhou, Y., & Wang, Y. S. (2021). Sustainable scheduling optimization of mixed-line production for large marine power components. Journal of Cleaner Production, 280, 124461.","journal-title":"Journal of Cleaner Production"},{"issue":"1","key":"849_CR13","doi-asserted-by":"publisher","first-page":"115","DOI":"10.1007\/s10479-012-1294-z","volume":"206","author":"K Fang","year":"2013","unstructured":"Fang, K., Uhan, N. A., Zhao, F., & Sutherland, J. W. (2013). Flow shop scheduling with peak power consumption constraints. Annals of Operations Research, 206(1), 115\u2013145.","journal-title":"Annals of Operations Research"},{"key":"849_CR14","doi-asserted-by":"publisher","first-page":"867","DOI":"10.1080\/00207543.2023.2175172","volume":"62","author":"DBMM Fontes","year":"2024","unstructured":"Fontes, D. B. M. M., Homayouni, S. M., & Fernandes, J. C. (2024). Energy-efficient job shop scheduling problem with transport resources considering speed adjustable resources. International Journal of Production Research, 62, 867\u2013890.","journal-title":"International Journal of Production Research"},{"key":"849_CR15","doi-asserted-by":"crossref","unstructured":"Fuechtenhans, M., & Glock, C. H. (2022). Energy-efficient job shop scheduling considering processing speed and incentive-based programs. In 10th IFAC Triennial Conference on Manufacturing Modelling, Management and Control (MIM) (Vol. 55, pp. 192\u2013197). Nantes, France","DOI":"10.1016\/j.ifacol.2022.09.389"},{"issue":"06","key":"849_CR16","first-page":"57","volume":"43","author":"B Gao","year":"2021","unstructured":"Gao, B., Sun, J. Y., Li, X. H., Zhao, H. J., & Wang, Y. (2021). Optimization on batch scheduling of flexible assembling for intelligent industry. Manufacturing Automation, 43(06), 57\u201362. (in Chinese).","journal-title":"Manufacturing Automation"},{"key":"849_CR17","doi-asserted-by":"publisher","first-page":"179","DOI":"10.1504\/IJMIC.2019.104384","volume":"33","author":"Z Gao","year":"2019","unstructured":"Gao, Z., Peng, J., Han, Z., & Jia, M. (2019). Flow shop scheduling with variable processing times based on differential shuffled frog leaping algorithm. International Journal of Modelling Identification and Control, 33, 179\u2013187.","journal-title":"International Journal of Modelling Identification and Control"},{"key":"849_CR18","doi-asserted-by":"publisher","first-page":"101131","DOI":"10.1016\/j.swevo.2022.101131","volume":"75","author":"G Gong","year":"2022","unstructured":"Gong, G., Chiong, R., Deng, Q., Gong, X., Lin, W., Han, W., & Zhang, L. (2022). A two-stage memetic algorithm for energy-efficient flexible job shop scheduling by means of decreasing the total number of machine restarts. Swarm and Evolutionary Computation, 75, 101131.","journal-title":"Swarm and Evolutionary Computation"},{"issue":"6","key":"849_CR19","doi-asserted-by":"publisher","first-page":"1443","DOI":"10.1007\/s10845-019-01521-9","volume":"31","author":"GL Gong","year":"2020","unstructured":"Gong, G. L., Chiong, R., Deng, Q. W., & Luo, Q. (2020). A memetic algorithm for multi-objective distributed production scheduling: Minimizing the makespan and total energy consumption. Journal of Intelligent Manufacturing, 31(6), 1443\u20131466.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"849_CR20","doi-asserted-by":"publisher","first-page":"102649","DOI":"10.1016\/j.seta.2022.102649","volume":"53","author":"J Guo","year":"2022","unstructured":"Guo, J., Wang, L., Kong, L., & Lv, X. (2022). Energy-efficient flow-shop scheduling with the strategy of switching the power statuses of machines. Sustainable Energy Technologies and Assessments, 53, 102649.","journal-title":"Sustainable Energy Technologies and Assessments"},{"issue":"3","key":"849_CR21","doi-asserted-by":"publisher","first-page":"856","DOI":"10.1016\/j.cie.2009.02.015","volume":"57","author":"SY Hsu","year":"2009","unstructured":"Hsu, S. Y., & Liu, C. H. (2009). Improving the delivery efficiency of the customer order scheduling problem in a job shop. Computers & Industrial Engineering, 57(3), 856\u2013866.","journal-title":"Computers & Industrial Engineering"},{"key":"849_CR22","doi-asserted-by":"publisher","first-page":"231","DOI":"10.1016\/j.jmsy.2020.08.013","volume":"57","author":"JW Hu","year":"2020","unstructured":"Hu, J. W., Jiang, Z. H., & Liao, H. T. (2020). Joint optimization of job scheduling and maintenance planning for a two-machine flow shop considering job-dependent operating condition. Journal of Manufacturing Systems, 57, 231\u2013241.","journal-title":"Journal of Manufacturing Systems"},{"key":"849_CR23","doi-asserted-by":"publisher","first-page":"1954","DOI":"10.3390\/su15031954","volume":"15","author":"B Ji","year":"2023","unstructured":"Ji, B., Zhang, S., Yu, S. S., & Zhang, B. (2023). Mathematical modeling and a novel heuristic method for flexible job-shop batch scheduling problem with incompatible jobs. Sustainability, 15, 1954.","journal-title":"Sustainability"},{"key":"849_CR24","doi-asserted-by":"publisher","first-page":"109143","DOI":"10.1016\/j.ress.2023.109143","volume":"234","author":"J Jiang","year":"2023","unstructured":"Jiang, J., An, Y., Dong, Y., Hu, J., Li, Y., & Zhao, Z. (2023). Integrated optimization of non-permutation flow shop scheduling and maintenance planning with variable processing speed. Reliability Engineering & System Safety, 234, 109143.","journal-title":"Reliability Engineering & System Safety"},{"key":"849_CR25","first-page":"2215","volume":"20","author":"F Jolai","year":"2013","unstructured":"Jolai, F., & Abedinnia, H. (2013). Consideration of transportation lags in a two-machine flow shop scheduling problem. Scientia Iranica, 20, 2215\u20132223.","journal-title":"Scientia Iranica"},{"key":"849_CR26","doi-asserted-by":"publisher","first-page":"1097","DOI":"10.1109\/TCYB.2018.2796119","volume":"49","author":"DM Lei","year":"2019","unstructured":"Lei, D. M., Li, M., & Wang, L. (2019). A two-phase meta-heuristic for multiobjective flexible job shop scheduling problem with total energy consumption threshold. IEEE Transactions on Cybernetics, 49, 1097\u20131109.","journal-title":"IEEE Transactions on Cybernetics"},{"issue":"05","key":"849_CR27","doi-asserted-by":"publisher","first-page":"12","DOI":"10.3901\/JME.2017.05.012","volume":"53","author":"CB Li","year":"2017","unstructured":"Li, C. B., Shen, H., Li, L. L., & Yi, Q. (2017). A batch splitting flexible job shop scheduling model for energy saving under alternative process plans. Journal of Mechanical Engineering, 53(05), 12\u201323.","journal-title":"Journal of Mechanical Engineering"},{"key":"849_CR28","doi-asserted-by":"publisher","first-page":"584","DOI":"10.1016\/j.jclepro.2018.02.004","volume":"181","author":"JQ Li","year":"2018","unstructured":"Li, J. Q., Sang, H. Y., Han, Y. Y., Wang, C. G., & Gao, K. Z. (2018). Efficient multi-objective optimization algorithm for hybrid flow shop scheduling problems with setup energy consumptions. Journal of Cleaner Production, 181, 584\u2013598.","journal-title":"Journal of Cleaner Production"},{"key":"849_CR29","first-page":"2427","volume":"21","author":"C Lin","year":"2015","unstructured":"Lin, C., & Zhang, Z. (2015). Batch-discrete hybrid flow shop scheduling with transportation in time windows. Computer Integrated Manufacturing Systems, 21, 2427\u20132434.","journal-title":"Computer Integrated Manufacturing Systems"},{"key":"849_CR30","first-page":"2135","volume":"56","author":"J Lu","year":"2022","unstructured":"Lu, J., Jin, J., Zhao, W., Chen, Q., & Jiang, W. (2022). Lot streaming hybrid assembly flow shop scheduling on migratory bird algorithm. Journal of Zhejiang University. Engineering Science, 56, 2135\u20132144.","journal-title":"Journal of Zhejiang University. Engineering Science"},{"key":"849_CR31","doi-asserted-by":"publisher","first-page":"100901","DOI":"10.1016\/j.suscom.2023.100901","volume":"39","author":"F Luan","year":"2023","unstructured":"Luan, F., Zhao, H., Liu, S. Q., He, Y., & Tang, B. (2023). Enhanced NSGA-II for multi-objective energy-saving flexible job shop scheduling. Sustainable Computing-Informatics & Systems, 39, 100901.","journal-title":"Sustainable Computing-Informatics & Systems"},{"issue":"3","key":"849_CR32","doi-asserted-by":"publisher","first-page":"772","DOI":"10.1016\/j.ejor.2015.08.064","volume":"248","author":"SA Mansouri","year":"2016","unstructured":"Mansouri, S. A., Aktas, E., & Besikci, U. (2016). Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption. European Journal of Operational Research, 248(3), 772\u2013788.","journal-title":"European Journal of Operational Research"},{"key":"849_CR33","doi-asserted-by":"publisher","first-page":"1119","DOI":"10.1080\/00207543.2018.1501166","volume":"57","author":"L Meng","year":"2019","unstructured":"Meng, L., Zhang, C., Shao, X., Ren, Y., & Ren, C. (2019). Mathematical modelling and optimisation of energy-conscious hybrid flow shop scheduling problem with unrelated parallel machines. International Journal of Production Research, 57, 1119\u20131145.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"849_CR34","doi-asserted-by":"publisher","first-page":"14","DOI":"10.1016\/j.ijpe.2010.08.004","volume":"129","author":"G Moslehi","year":"2011","unstructured":"Moslehi, G., & Mahnam, M. (2011). A Pareto approach to multi-objective flexible job-shop scheduling problem using particle swarm optimization and local search. International Journal of Production Economics, 129(1), 14\u201322.","journal-title":"International Journal of Production Economics"},{"issue":"18\u201319","key":"849_CR35","doi-asserted-by":"publisher","first-page":"4247","DOI":"10.1080\/00207540701450013","volume":"45","author":"G Mouzon","year":"2007","unstructured":"Mouzon, G., Mehmet, B. Y., & Twomey, J. (2007). Operational methods for minimization of energy consumption of manufacturing equipment. International Journal of Production Research, 45(18\u201319), 4247\u20134271.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"849_CR36","doi-asserted-by":"publisher","first-page":"29","DOI":"10.1080\/095372899233398","volume":"10","author":"GC Onwubolu","year":"1999","unstructured":"Onwubolu, G. C. (1999). Flow shop scheduling by transportation model. Production Planning & Control, 10(1), 29\u201334.","journal-title":"Production Planning & Control"},{"issue":"2","key":"849_CR37","doi-asserted-by":"publisher","first-page":"1065","DOI":"10.1016\/j.eswa.2009.06.041","volume":"37","author":"DY Sha","year":"2010","unstructured":"Sha, D. Y., & Lin, H. H. (2010). A multi-objective PSO for job-shop scheduling problems. Expert Systems with Applications, 37(2), 1065\u20131070.","journal-title":"Expert Systems with Applications"},{"key":"849_CR38","doi-asserted-by":"publisher","first-page":"227","DOI":"10.1016\/j.ijpe.2017.10.015","volume":"195","author":"O Shahvari","year":"2018","unstructured":"Shahvari, O., & Logendran, R. (2018). A comparison of two stage-based hybrid algorithms for a batch scheduling problem in hybrid flow shop with learning effect. International Journal of Production Economics, 195, 227\u2013248.","journal-title":"International Journal of Production Economics"},{"key":"849_CR39","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1155\/2022\/2856056","volume":"2022","author":"L Song","year":"2022","unstructured":"Song, L., Liu, C., Shi, H., & Zhu, J. (2022). An improved immune genetic algorithm for solving the flexible job shop scheduling problem with batch processing. Wireless Communications & Mobile Computing, 2022, 1\u201317.","journal-title":"Wireless Communications & Mobile Computing"},{"issue":"2","key":"849_CR40","doi-asserted-by":"publisher","first-page":"879","DOI":"10.1007\/s10845-016-1291-1","volume":"30","author":"CJ Tan","year":"2019","unstructured":"Tan, C. J., Neoh, S. C., Lim, C. P., Hanoun, S., Wong, W. P., Loo, C. K., Zhang, L., & Nahavandi, S. (2019a). Application of an evolutionary algorithm-based ensemble model to job-shop scheduling. Journal of Intelligent Manufacturing, 30(2), 879\u2013890.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"4","key":"849_CR41","doi-asserted-by":"publisher","first-page":"439","DOI":"10.1007\/s12293-019-00296-z","volume":"11","author":"M Tan","year":"2019","unstructured":"Tan, M., Yang, H. L., & Su, Y. X. (2019b). Genetic algorithms with greedy strategy for green batch scheduling on non-identical parallel machines. Memetic Computing, 11(4), 439\u2013452.","journal-title":"Memetic Computing"},{"issue":"2","key":"849_CR42","doi-asserted-by":"publisher","first-page":"71","DOI":"10.4316\/AECE.2017.02010","volume":"17","author":"E Tanyildizi","year":"2017","unstructured":"Tanyildizi, E., & Demir, G. (2017). Golden sine algorithm: A novel mathinspired algorithm. Advances in Electrical & Computer Engineering, 17(2), 71\u201378.","journal-title":"Advances in Electrical & Computer Engineering"},{"key":"849_CR43","doi-asserted-by":"publisher","first-page":"324","DOI":"10.3390\/math11020324","volume":"11","author":"Y Tian","year":"2023","unstructured":"Tian, Y., Gao, Z., Zhang, L., Chen, Y., & Wang, T. (2023). A multi-objective optimization method for flexible job shop scheduling considering cutting-tool degradation with energy-saving measures. Mathematics, 11, 324.","journal-title":"Mathematics"},{"issue":"3","key":"849_CR44","doi-asserted-by":"publisher","first-page":"793","DOI":"10.1080\/00207543.2014.933273","volume":"53","author":"A Tiwari","year":"2015","unstructured":"Tiwari, A., Chang, P. C., Tiwari, M. K., & Kollanoor, N. J. (2015). A pareto block-based estimation and distribution algorithm for multi-objective permutation flow shop scheduling problem. International Journal of Production Research, 53(3), 793\u2013834.","journal-title":"International Journal of Production Research"},{"key":"849_CR45","doi-asserted-by":"publisher","first-page":"3031","DOI":"10.32604\/cmc.2022.020222","volume":"70","author":"C-N Wang","year":"2022","unstructured":"Wang, C.-N., Porter, G. A., Huang, C.-C., Nguyen, V. T., & Husain, S. T. (2022). Flow-shop scheduling with transportation capacity and time consideration. Cmc-Computers Materials & Continua, 70, 3031\u20133048.","journal-title":"Cmc-Computers Materials & Continua"},{"issue":"4","key":"849_CR46","doi-asserted-by":"publisher","first-page":"5613","DOI":"10.1109\/LRA.2020.3005626","volume":"5","author":"JK Wang","year":"2020","unstructured":"Wang, J. K., Du, H. M., Xing, J. X., Qiao, F., & Ma, Y. M. (2020). Novel energy- and maintenance-aware collaborative scheduling for a hybrid flow shop based on dual memetic algorithms. IEEE Robotics and Automation Letters, 5(4), 5613\u20135620.","journal-title":"IEEE Robotics and Automation Letters"},{"issue":"5","key":"849_CR47","doi-asserted-by":"publisher","first-page":"1805","DOI":"10.1109\/TSMC.2017.2788879","volume":"50","author":"JJ Wang","year":"2020","unstructured":"Wang, J. J., & Wang, L. (2020). A knowledge-based cooperative algorithm for energy-efficient scheduling of distributed flow-shop. IEEE Transactions on Systems Man Cybernetics-Systems, 50(5), 1805\u20131819.","journal-title":"IEEE Transactions on Systems Man Cybernetics-Systems"},{"issue":"04","key":"849_CR48","first-page":"424","volume":"21","author":"XL Wu","year":"2010","unstructured":"Wu, X. L., Li, S. J., & Du, Y. H. (2010). Research on batch scheduling problem in a flexible job shop. China Mechanical Engineering, 21(04), 424\u2013429. (in Chinese).","journal-title":"China Mechanical Engineering"},{"key":"849_CR49","doi-asserted-by":"publisher","first-page":"3249","DOI":"10.1016\/j.jclepro.2017.10.342","volume":"172","author":"XL Wu","year":"2018","unstructured":"Wu, X. L., & Sun, Y. J. (2018). A green scheduling algorithm for flexible job shop with energy-saving measures. Journal of Cleaner Production, 172, 3249\u20133264.","journal-title":"Journal of Cleaner Production"},{"key":"849_CR50","doi-asserted-by":"publisher","first-page":"513","DOI":"10.1016\/j.asoc.2018.06.004","volume":"70","author":"NM Xie","year":"2018","unstructured":"Xie, N. M., & Chen, N. L. (2018). Flexible job shop scheduling problem with interval grey processing time. Applied Soft Computing, 70, 513\u2013524.","journal-title":"Applied Soft Computing"},{"key":"849_CR52","doi-asserted-by":"crossref","unstructured":"Yan, J., Liu, Z., Zhang, C., Zhang, T., Zhang, Y., & Yang, C. (2021). Research on flexible job shop scheduling under finite transportation conditions for digital twin workshop. Robotics and Computer-Integrated Manufacturing, 72","DOI":"10.1016\/j.rcim.2021.102198"},{"key":"849_CR53","doi-asserted-by":"crossref","unstructured":"Yan, X., Zuo, H., Hu, C., Gong, W., & Gao, L. (2024). Distributed Heterogeneous Flow Shop Scheduling Method for Dual-Carbon Goals. IEEE Transactions on Automation Science and Engineering","DOI":"10.1109\/TASE.2024.3371940"},{"issue":"4","key":"849_CR54","doi-asserted-by":"publisher","first-page":"689","DOI":"10.2507\/IJSIMM18(4)CO17","volume":"18","author":"MS Yang","year":"2019","unstructured":"Yang, M. S., Ba, L., Xu, E. B., Li, Y., Gao, X. Q., Liu, Y., & Li, Y. (2019). Batch optimization in integrated scheduling of machining and assembly. International Journal of Simulation Modelling, 18(4), 689\u2013698.","journal-title":"International Journal of Simulation Modelling"},{"issue":"1","key":"849_CR55","doi-asserted-by":"publisher","first-page":"24","DOI":"10.1016\/j.ejor.2011.02.028","volume":"213","author":"W Yu","year":"2011","unstructured":"Yu, W., Liu, Z. H., Wang, L. Y., & Fan, T. J. (2011). Routing open shop and flow shop scheduling problems. European Journal of Operational Research, 213(1), 24\u201336.","journal-title":"European Journal of Operational Research"},{"key":"849_CR56","doi-asserted-by":"publisher","first-page":"289","DOI":"10.1007\/s10951-023-00783-9","volume":"26","author":"Y Zeitrag","year":"2023","unstructured":"Zeitrag, Y., & Figueira, J. R. (2023). Automatically evolving preference-based dispatching rules for multi-objective job shop scheduling. Journal of Scheduling, 26, 289\u2013314.","journal-title":"Journal of Scheduling"},{"key":"849_CR57","doi-asserted-by":"publisher","first-page":"925","DOI":"10.1016\/j.jclepro.2018.02.224","volume":"183","author":"ZQ Zeng","year":"2018","unstructured":"Zeng, Z. Q., Hong, M. N., Man, Y., Li, J. G., Zhang, Y. Z., & Liu, H. B. (2018). Multi-object optimization of flexible flow shop scheduling with batch process-Consideration total electricity consumption and material wastage. Journal of Cleaner Production, 183, 925\u2013939.","journal-title":"Journal of Cleaner Production"},{"key":"849_CR58","doi-asserted-by":"publisher","first-page":"3361","DOI":"10.1016\/j.jclepro.2015.09.097","volume":"112","author":"R Zhang","year":"2016","unstructured":"Zhang, R., & Chiong, R. (2016). Solving the energy-efficient job shop scheduling problem: A multi-objective genetic algorithm with enhanced local search for minimizing the total weighted tardiness and total energy consumption. Journal of Cleaner Production, 112, 3361\u20133375.","journal-title":"Journal of Cleaner Production"},{"key":"849_CR59","doi-asserted-by":"publisher","first-page":"51","DOI":"10.1016\/j.cor.2018.01.015","volume":"93","author":"TK Zubaran","year":"2018","unstructured":"Zubaran, T. K., & Ritt, M. (2018). An effective heuristic algorithm for the partial shop scheduling problem. Computers & Operations Research, 93, 51\u201365.","journal-title":"Computers & Operations Research"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-025-00849-w.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10951-025-00849-w\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-025-00849-w.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,11,1]],"date-time":"2025-11-01T12:02:42Z","timestamp":1761998562000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10951-025-00849-w"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,8,21]]},"references-count":57,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2025,12]]}},"alternative-id":["849"],"URL":"https:\/\/doi.org\/10.1007\/s10951-025-00849-w","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025,8,21]]},"assertion":[{"value":"7 May 2025","order":1,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"21 August 2025","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"All authors certify that they have no affiliations with or involvement in any organization or entity with any financial interest or non-financial interest in the subject matter or materials discussed in this manuscript. On behalf of all authors, the corresponding author states that there is no conflict of interest.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}