{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2023,2,3]],"date-time":"2023-02-03T16:53:32Z","timestamp":1675443212843},"reference-count":9,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2012,8,30]],"date-time":"2012-08-30T00:00:00Z","timestamp":1346284800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Optim Theory Appl"],"published-print":{"date-parts":[[2013,9]]},"DOI":"10.1007\/s10957-012-0160-0","type":"journal-article","created":{"date-parts":[[2012,8,29]],"date-time":"2012-08-29T11:58:46Z","timestamp":1346241526000},"page":"888-895","source":"Crossref","is-referenced-by-count":2,"title":["The Algorithm to Locate the Optimal Solution for Production System Subject to Random Machine Breakdown and Failure in Rework for Supply Chain Management"],"prefix":"10.1007","volume":"158","author":[{"given":"Kun-Jen","family":"Chung","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2012,8,30]]},"reference":[{"key":"160_CR1","doi-asserted-by":"crossref","first-page":"584","DOI":"10.1080\/095372801750397707","volume":"12","author":"P.A. Hayek","year":"2001","unstructured":"Hayek, P.A., Salameh, M.K.: Production lot sizing with the reworking of imperfect quality items produced. Prod. Plan. Control 12, 584\u2013590 (2001)","journal-title":"Prod. Plan. Control"},{"key":"160_CR2","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1016\/j.cie.2004.03.001","volume":"47","author":"A.M.M. Jamal","year":"2004","unstructured":"Jamal, A.M.M., Sarker, B.R., Mondal, S.: Optimal manufacturing batch size with rework process at a single-stage production system. Comput. Ind. Eng. 47, 77\u201389 (2004)","journal-title":"Comput. Ind. Eng."},{"key":"160_CR3","doi-asserted-by":"crossref","first-page":"196","DOI":"10.1016\/j.cie.2007.04.008","volume":"53","author":"L.E. Cardenas-Barron","year":"2007","unstructured":"Cardenas-Barron, L.E.: On optimal manufacturing batch size with rework process at single-stage production system. Comput. Ind. Eng. 53, 196\u2013198 (2007)","journal-title":"Comput. Ind. Eng."},{"key":"160_CR4","doi-asserted-by":"crossref","first-page":"758","DOI":"10.1016\/j.cie.2007.07.017","volume":"55","author":"L.E. Cardenas-Barron","year":"2008","unstructured":"Cardenas-Barron, L.E.: Optimal manufacturing batch size with rework in a single-stage production system: a simple derivation. Comput. Ind. Eng. 55, 758\u2013765 (2008)","journal-title":"Comput. Ind. Eng."},{"key":"160_CR5","doi-asserted-by":"crossref","first-page":"1105","DOI":"10.1016\/j.cie.2009.04.020","volume":"57","author":"L.E. Cardenas-Barron","year":"2009","unstructured":"Cardenas-Barron, L.E.: Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Comput. Ind. Eng. 57, 1105\u20131113 (2009)","journal-title":"Comput. Ind. Eng."},{"key":"160_CR6","doi-asserted-by":"crossref","first-page":"104","DOI":"10.1287\/mnsc.38.1.104","volume":"38","author":"H. Groenevelt","year":"1992","unstructured":"Groenevelt, H., Pintelon, L., Seidmann, A.: A production lot sizing with machine breakdown. Manag. Sci. 38, 104\u2013123 (1992)","journal-title":"Manag. Sci."},{"key":"160_CR7","doi-asserted-by":"crossref","first-page":"899","DOI":"10.1016\/j.cor.2009.03.016","volume":"37","author":"S.W. Chiu","year":"2010","unstructured":"Chiu, S.W.: Robust planning in optimization for production system subject to random machine breakdown and failure in rework. Comput. Oper. Res. 37, 899\u2013908 (2010)","journal-title":"Comput. Oper. Res."},{"key":"160_CR8","volume-title":"Nonlinear Programming: Analysis and Methods","author":"M. Avriel","year":"1976","unstructured":"Avriel, M.: Nonlinear Programming: Analysis and Methods. Prentice-Hall, Cliffs (1976)"},{"key":"160_CR9","unstructured":"Varberg, D., Purcell, E.J., Rigdon, S.E.: Pearson Education International (2007)"}],"container-title":["Journal of Optimization Theory and Applications"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10957-012-0160-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10957-012-0160-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10957-012-0160-0","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T05:55:18Z","timestamp":1559454918000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10957-012-0160-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,8,30]]},"references-count":9,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2013,9]]}},"alternative-id":["160"],"URL":"https:\/\/doi.org\/10.1007\/s10957-012-0160-0","relation":{},"ISSN":["0022-3239","1573-2878"],"issn-type":[{"value":"0022-3239","type":"print"},{"value":"1573-2878","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,8,30]]}}}