{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,16]],"date-time":"2026-10-16T14:08:22Z","timestamp":1792159702095,"version":"4.4.0"},"reference-count":38,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2023,11,17]],"date-time":"2023-11-17T00:00:00Z","timestamp":1700179200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"},{"start":{"date-parts":[[2023,11,17]],"date-time":"2023-11-17T00:00:00Z","timestamp":1700179200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"}],"funder":[{"name":"Technical University of Kosice"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Mobile Netw Appl"],"published-print":{"date-parts":[[2024,4]]},"abstract":"<jats:title>Abstract<\/jats:title><jats:p>The building information modeling represents the management of construction projects based on relevant information and work with them. In the era of digitization, it represents a space for modeling information about constructions to implement and increase the digital level in the construction industry as well. One of the goals of implementing new technologies is to improve performance and efficiency. The current situation within the pressure for sustainability and so-called green solutions brings new challenges, but also perspectives on technologies with the aim of increasing sustainability in every phase of the construction project. One of the tools should be the very implementation of these solutions to support the use of information and information systems to support the achievement of goals. Improving performance and achieving goals in circular economy and a higher level of sustainability itself is intended to quantify performance and change. Key performance indicators need to be monitored and evaluated. It is believed that building information modeling can achieve selected performance indicators. Due to the principles of the circular economy, there is pressure to monitor indicators that will lead to an increase in performance and indicators associated with this concept. In the research, based on relevant studies, the key performance indicators of the circular economy in the management of construction projects were determined. Due to the perception of sustainability through economic sustainability, material costs, material consumption, recycling costs, rate of use of recycled materials, waste management costs were monitored. The goal of the research was to quantify the impacts of building information modeling on selected performance indicators within the concept of circular economy. The aim of the research was to analyze the impact of using BIM on selected performance indicators. The research took place in three countries, namely Slovakia, Croatia, and Slovenia. The respondents were the main participants in the construction project. Data processing was based on the search for relationships and dependencies between the rate of use of information building modeling and selected key performance indicators.<\/jats:p>","DOI":"10.1007\/s11036-023-02268-7","type":"journal-article","created":{"date-parts":[[2023,11,17]],"date-time":"2023-11-17T06:14:22Z","timestamp":1700201662000},"page":"506-515","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":8,"title":["The Building Information Modelling Through Information Technology and Impacts on Selected Circular Economy Performance Indicators of Construction Projects"],"prefix":"10.1007","volume":"29","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-6310-6046","authenticated-orcid":false,"given":"Annam\u00e1ria","family":"Beh\u00fanov\u00e1","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-8338-1640","authenticated-orcid":false,"given":"Tom\u00e1\u0161","family":"Mandi\u010d\u00e1k","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-8130-9664","authenticated-orcid":false,"given":"Marcel","family":"Beh\u00fan","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-8338-5684","authenticated-orcid":false,"given":"Peter","family":"M\u00e9s\u00e1ro\u0161","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2023,11,17]]},"reference":[{"key":"2268_CR1","doi-asserted-by":"crossref","unstructured":"Dugas J, Se\u0148ov\u00e1 A, Kr\u0161\u00e1k B, Ferencz V (2018) Implementation of business intelligence tools in companies, Conference MTS 2017 - International conference on marketing management, trade, financial and social aspects of business (MTS 2017)","DOI":"10.1201\/9781315163963-18"},{"key":"2268_CR2","first-page":"281","volume":"54","author":"F Sudzina","year":"2006","unstructured":"Sudzina F, Kmec P (2006) The technological paradox and evaluation of the benefits of informatization. Ekonomick\u00fd \u010casopis 54:281\u2013293","journal-title":"Ekonomick\u00fd \u010casopis"},{"issue":"5","key":"2268_CR3","doi-asserted-by":"publisher","first-page":"886","DOI":"10.3846\/16111699.2012.749806","volume":"15","author":"B Johansson","year":"2016","unstructured":"Johansson B, Sudzina F, Pucihar P (2016) Alignment of Business and Information Strategies and Its Impact on Business Performance. J Bus Econ Manag 15(5):886\u2013898","journal-title":"J Bus Econ Manag"},{"issue":"3","key":"2268_CR4","first-page":"261","volume":"43","author":"B Kr\u0161\u00e1k","year":"2004","unstructured":"Kr\u0161\u00e1k B (2004) Measuring information technology\u00b4s impact on company performance. Metalurgija 43(3):261","journal-title":"Metalurgija"},{"issue":"24","key":"2268_CR5","first-page":"47","volume":"13","author":"I Marovi\u0107","year":"2022","unstructured":"Marovi\u0107 I, Hanak T, Plaum S (2022) Performance Management in Civil Engineering: a Systematic Literature Review. Electron J Faculty Civil Eng Osijek 13(24):47\u201358","journal-title":"Electron J Faculty Civil Eng Osijek"},{"key":"2268_CR6","first-page":"12","volume":"2020","author":"B Dasovi\u0107","year":"2020","unstructured":"Dasovi\u0107 B, Gali\u0107 M, Klan\u0161ek U (2020) A Survey on Integration of Optimization and Project Management Tools for Sustainable Construction Scheduling. Sustainability 2020:12","journal-title":"Sustainability"},{"key":"2268_CR7","doi-asserted-by":"crossref","unstructured":"Mayer P, Funt\u00edk T, Ga\u0161par\u00edk J, Mak\u00fd\u0161 P (2021) Analysis of the current state of automation of hazard detection processes in BIM in Slovakia. Appl Sci 11","DOI":"10.3390\/app11178130"},{"issue":"1","key":"2268_CR8","first-page":"87","volume":"8","author":"B Johansson","year":"2011","unstructured":"Johansson B, Sudzina F, Newman M (2011) ERP System implementation costs and selection factors of an implementation approach. Int J Bus Inf Syst 8(1):87\u2013105","journal-title":"Int J Bus Inf Syst"},{"key":"2268_CR9","doi-asserted-by":"publisher","first-page":"12173","DOI":"10.3390\/su132112173","volume":"13","author":"B Dasovi\u0107","year":"2021","unstructured":"Dasovi\u0107 B, Klan\u0161ek U (2021) Integration of mixed-integer nonlinear program and project management tool to support sustainable cost-optimal construction scheduling. Sustainability 13:12173","journal-title":"Sustainability"},{"key":"2268_CR10","doi-asserted-by":"publisher","first-page":"113","DOI":"10.4018\/jeis.2013070106","volume":"9","author":"U Isigdag","year":"2013","unstructured":"Isigdag U, Underwood J, Kuruoglu M (2013) Data integration capability of ERP systems: A construction industry perspective. International Journal of Enterprise Information Systems 9:113\u2013129","journal-title":"International Journal of Enterprise Information Systems"},{"key":"2268_CR11","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.jobe.2021.103852","volume":"46","author":"A Dauletbek","year":"2022","unstructured":"Dauletbek A, Zhou PG (2022) BIM-based LCA as a comprehensive method for the refurbishment of existing dwellings considering environmental compatibility, energy efficiency, and profitability: A case study in China. Journal Of Building Engineering 46:1\u201318","journal-title":"Journal Of Building Engineering"},{"issue":"18","key":"2268_CR12","doi-asserted-by":"publisher","first-page":"1","DOI":"10.3390\/app10186483","volume":"10","author":"GQ Ren","year":"2020","unstructured":"Ren GQ, Li HJ, Zhang JS (2020) A BIM-Based value for money assessment in public-private partnership: an overall review. Applied Science 10(18):1\u201324","journal-title":"Applied Science"},{"key":"2268_CR13","doi-asserted-by":"crossref","unstructured":"Wojtowicz M (2019) Design and Execution of Building Investments Using BIM Technology for Facilities Subject to The Polish Military Administration. Computational Technologies In Engineering (TKI'2018), 15th Conference on Computational Technologies in Engineering (TKI) Jora Wielka, Poland","DOI":"10.1063\/1.5092106"},{"key":"2268_CR14","doi-asserted-by":"crossref","unstructured":"Wojtowicz M (2019) Design and Execution of Building Investments Using BIM Technology for Facilities Subject to The Polish Military Administration. Computational Technologies In Engineering (TKI'2018), 15th Conference on Computational Technologies in Engineering (TKI) Jora Wielka, Poland","DOI":"10.1063\/1.5092106"},{"key":"2268_CR15","doi-asserted-by":"publisher","first-page":"463","DOI":"10.1016\/j.procs.2019.12.207","volume":"164","author":"S AboAbdo","year":"2019","unstructured":"AboAbdo S, Aldhoiena A, Al-Amrib H (2019) Implementing Enterprise Resource Planning ERP system in a large construction company in KSA. Procedia Comput Sci Centeri 164:463\u2013470","journal-title":"Procedia Comput Sci Centeri"},{"key":"2268_CR16","doi-asserted-by":"publisher","first-page":"6","DOI":"10.1061\/(ASCE)ME.1943-5479.0000552","volume":"33","author":"N Forcada","year":"2017","unstructured":"Forcada N et al (2017) Communication key performance indicators (KPI) for selecting construction project bidders. J Manag Eng 33:6","journal-title":"J Manag Eng"},{"issue":"9","key":"2268_CR17","first-page":"1","volume":"5","author":"S Sara Faneai","year":"2018","unstructured":"Sara Faneai S et al (2018) Application of machine learning in predicting key performance indicators for construction projects. Int Res J Eng Technol (IRJET) 5(9):1\u20139","journal-title":"Int Res J Eng Technol (IRJET)"},{"issue":"3","key":"2268_CR18","doi-asserted-by":"publisher","first-page":"381","DOI":"10.1108\/CI-06-2016-0034","volume":"17","author":"H Jonsson","year":"2017","unstructured":"Jonsson H, Rudberg M (2017) KPIs for measuring performance of production systems for residential building: A production strategy perspective. Constr Innov 17(3):381\u2013403. https:\/\/doi.org\/10.1108\/CI-06-2016-0034","journal-title":"Constr Innov"},{"key":"2268_CR19","doi-asserted-by":"crossref","unstructured":"Dziekonski K, Fawry Ibrahim OHM, Mahamadu A-M, Manu P (2018) Framework of performance measurement practices in construction companies in Egypt. Eng Manag Prod Serv 10(2)","DOI":"10.2478\/emj-2018-0007"},{"key":"2268_CR20","doi-asserted-by":"publisher","first-page":"012006","DOI":"10.1088\/1757-899X\/1252\/1\/012006","volume":"1252","author":"\u017d Blichova","year":"2022","unstructured":"Blichova \u017d, Vilcekova S, Kridlova-Burdova E, Katunsk\u00fd D (2022) Life cycle assessment of residential buildings and scenarios for prolonged life span. IOP Conf Ser: Mater Sci Eng 1252:012006","journal-title":"IOP Conf Ser: Mater Sci Eng"},{"issue":"21","key":"2268_CR21","doi-asserted-by":"publisher","first-page":"10863","DOI":"10.3390\/app122110863","volume":"12","author":"S Hrehova","year":"2023","unstructured":"Hrehova S, Knapcikova L (2023) The study of machine learning assisted the design of selected composites properties. Appl Sci-Basel 12(21):10863","journal-title":"Appl Sci-Basel"},{"issue":"2","key":"2268_CR22","doi-asserted-by":"publisher","first-page":"640","DOI":"10.18421\/TEM122-07","volume":"12","author":"M Marticek","year":"2023","unstructured":"Marticek M, Knapcikova L, Tauberova R (2023) Monitoring of the Fe2O3 Particle Size Distrib, ution by Intensity in the Context of Digital Company. TEM Journal 12(2):640\u2013644","journal-title":"TEM Journal"},{"issue":"1","key":"2268_CR23","doi-asserted-by":"publisher","first-page":"1952","DOI":"10.2478\/otmcj-2019-0004","volume":"11","author":"M Mihi\u0107","year":"2019","unstructured":"Mihi\u0107 M, Vukomani\u0107 M, Zavr\u0161ki I (2019) Review of previous applications of innovative information\u00a0technologies in construction health and safety. Conference paper: OTMC 2019, Organization. Technology and Management in Construction 11(1):1952\u20131967. https:\/\/doi.org\/10.2478\/otmcj-2019-0004","journal-title":"Technology and Management in Construction"},{"key":"2268_CR24","doi-asserted-by":"crossref","unstructured":"Hewavitharana FST, Perera AADAJ, Dissanayake R, Mendis P (2018) Sustainability via ERP and BIM integration, Conference: FARU 2018, Sri Lanka","DOI":"10.1007\/978-981-13-9749-3_19"},{"key":"2268_CR25","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.jclepro.2020.121766","volume":"265","author":"C Panteli","year":"2020","unstructured":"Panteli C, Kylili A, Fokaides PA (2020) Building information modelling applications in smart buildings: from design to commissioning and beyond. A critical review. J Clean Prod 265:1\u201314. https:\/\/doi.org\/10.1016\/j.jclepro.2020.121766","journal-title":"J Clean Prod"},{"key":"2268_CR26","unstructured":"BIM adoption in Europe: 7 countries compared - PlanRadar, PlanRadar. [Online]. (n.d.) Available:\u00a0https:\/\/www.planradar.com\/gb\/bim-adoption-in-europe\/. Accessed 14 Apr 2022"},{"key":"2268_CR27","doi-asserted-by":"publisher","first-page":"112884","DOI":"10.1016\/j.enbuild.2023.112884","volume":"285","author":"P Spudys","year":"2023","unstructured":"Spudys P, Jurelionis A, Fokaides P (2023) Conducting smart energy audits of buildings with the use of building information modelling. Energy Build 285:112884","journal-title":"Energy Build"},{"key":"2268_CR28","doi-asserted-by":"publisher","unstructured":"Begi\u0107 H, Gali\u0107 MA (2021) Systematic review of construction 4.0 in the context of the BIM 4.0 Premise. MDPI: Buildings, 11(337):1\u201324.\u00a0https:\/\/doi.org\/10.3390\/buildings11080337","DOI":"10.3390\/buildings11080337"},{"key":"2268_CR29","doi-asserted-by":"publisher","unstructured":"Kravanja S, Klans\u030cek U, Z\u030cula T (2021) Mass, direct cost and energy life-cycle cost optimization of steel-concrete composite floor structures. Appl Sci 11:1\u201323. https:\/\/doi.org\/10.3390\/app112110316","DOI":"10.3390\/app112110316"},{"key":"2268_CR30","doi-asserted-by":"crossref","unstructured":"Korytarova J, Hromadka V (2010) Building life cycle economic impacts. Conference: International Conference on Management and Service Science, Proceedings of the International Conference on Management and Service Science, Wuhan, China","DOI":"10.1109\/ICMSS.2010.5577557"},{"key":"2268_CR31","doi-asserted-by":"crossref","unstructured":"Ren GQ, Li HJ, Zhang JS (2020) A BIM-Based value for money assessment in public-private partnership: An overall review. Appl Sci 10(18)","DOI":"10.3390\/app10186483"},{"key":"2268_CR32","doi-asserted-by":"crossref","unstructured":"Khanzadi M, Sheikhkhoshkar M, Banihashemi S (2018) BIM applications toward key performance indicators of construction projects in Iran. Int J Constr Manag","DOI":"10.1080\/15623599.2018.1484852"},{"issue":"2","key":"2268_CR33","doi-asserted-by":"publisher","first-page":"853","DOI":"10.1007\/s11276-021-02841-6","volume":"28","author":"L Knapcikova","year":"2022","unstructured":"Knapcikova L, Perakovic D (2022) Innovations in ICT, management, industrial and materials engineering. Wireless Netw 28(2):853\u2013854. https:\/\/doi.org\/10.1007\/s11276-021-02841-6","journal-title":"Wireless Netw"},{"key":"2268_CR34","unstructured":"Cbpp CBPP (2014) Construction industry key performance indicators. Centre for Construction Innovation"},{"issue":"4","key":"2268_CR35","first-page":"521","volume":"16","author":"M Radujkovi\u010d","year":"2010","unstructured":"Radujkovi\u010d M, Vukomanovi\u0107 M, Dunovi\u0107 IB (2010) Application of key performance indicators in south-eastern European construction. J Civ Eng 16(4):521\u2013530","journal-title":"J Civ Eng"},{"issue":"3","key":"2268_CR36","doi-asserted-by":"publisher","first-page":"381","DOI":"10.1108\/CI-06-2016-0034","volume":"17","author":"H Jonsson","year":"2017","unstructured":"Jonsson H, Rudberg M (2017) KPIs for measuring performance of production systems for residential building: A production strategy perspective. Constr Innov 17(3):381\u2013403. https:\/\/doi.org\/10.1108\/CI-06-2016-0034","journal-title":"Constr Innov"},{"key":"2268_CR37","doi-asserted-by":"crossref","unstructured":"Han\u00e1k T, Marovi\u0107 I (2022) Performance Management in Czech Construction: Public Investors\u2019 Perspective. Tehni\u010dki Glasnik 16(1)","DOI":"10.31803\/tg-20211203121521"},{"key":"2268_CR38","doi-asserted-by":"crossref","unstructured":"Biolek V et al (2017) Data flow in relation to life-cycle costing of construction projects in the Czech Republic. IOP Conf Ser: Mater Sci Eng 245","DOI":"10.1088\/1757-899X\/245\/7\/072032"}],"container-title":["Mobile Networks and Applications"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s11036-023-02268-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s11036-023-02268-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s11036-023-02268-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,11,29]],"date-time":"2024-11-29T09:09:57Z","timestamp":1732871397000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s11036-023-02268-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,11,17]]},"references-count":38,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2024,4]]}},"alternative-id":["2268"],"URL":"https:\/\/doi.org\/10.1007\/s11036-023-02268-7","relation":{},"ISSN":["1383-469X","1572-8153"],"issn-type":[{"value":"1383-469X","type":"print"},{"value":"1572-8153","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023,11,17]]},"assertion":[{"value":"3 November 2023","order":1,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"17 November 2023","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"Not applicable.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Ethics approval"}},{"value":"The authors declare no competing interests.","order":3,"name":"Ethics","group":{"name":"EthicsHeading","label":"Competing interests"}}]}}