{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,5,2]],"date-time":"2025-05-02T16:29:45Z","timestamp":1746203385015,"version":"3.37.3"},"reference-count":37,"publisher":"Springer Science and Business Media LLC","issue":"22","license":[{"start":{"date-parts":[[2023,3,10]],"date-time":"2023-03-10T00:00:00Z","timestamp":1678406400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2023,3,10]],"date-time":"2023-03-10T00:00:00Z","timestamp":1678406400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"funder":[{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["61772160"],"award-info":[{"award-number":["61772160"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100010009","name":"Heilongjiang Provincial Postdoctoral Science Foundation","doi-asserted-by":"publisher","award":["LBHQ13092"],"award-info":[{"award-number":["LBHQ13092"]}],"id":[{"id":"10.13039\/501100010009","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Multimed Tools Appl"],"published-print":{"date-parts":[[2023,9]]},"DOI":"10.1007\/s11042-023-14544-5","type":"journal-article","created":{"date-parts":[[2023,3,26]],"date-time":"2023-03-26T21:32:00Z","timestamp":1679866320000},"page":"34029-34051","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["A signal-driven based flexible integrated scheduling algorithm with bidirectional coordination mechanism"],"prefix":"10.1007","volume":"82","author":[{"given":"Dan","family":"Yang","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-0533-4136","authenticated-orcid":false,"given":"Zhiqiang","family":"Xie","sequence":"additional","affiliation":[]},{"given":"Qi","family":"Liu","sequence":"additional","affiliation":[]},{"given":"Xu","family":"Yu","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2023,3,10]]},"reference":[{"issue":"2","key":"14544_CR1","doi-asserted-by":"publisher","first-page":"421","DOI":"10.1016\/j.ejor.2015.06.023","volume":"247","author":"EG Birgin","year":"2015","unstructured":"Birgin EG, Ferreira JE, Ronconi DP (2015) List scheduling and beam search methods for the flexible job shop scheduling problem with sequencing flexibility. Eur J Oper Res 247(2):421\u2013440","journal-title":"Eur J Oper Res"},{"issue":"2","key":"14544_CR2","doi-asserted-by":"publisher","first-page":"167","DOI":"10.1007\/s00607-002-1467-8","volume":"70","author":"TCE Cheng","year":"2003","unstructured":"Cheng TCE, Kovalyov MY (2003) Scheduling a single server in a two-machine flow shop. Computing. 70(2):167\u2013180","journal-title":"Computing."},{"key":"14544_CR3","doi-asserted-by":"publisher","first-page":"166","DOI":"10.1016\/j.asoc.2018.08.002","volume":"72","author":"O Engin","year":"2018","unstructured":"Engin O, G\u00fc\u00e7l\u00fc A (2018) A new hybrid ant colony optimization algorithm for solving the no-wait flow shop scheduling problems. Appl Soft Comput 72:166\u2013176","journal-title":"Appl Soft Comput"},{"key":"14544_CR4","doi-asserted-by":"publisher","unstructured":"Fattahi P, Rad NB, Daneshamooz F, Ahmadi S (2020) A new hybrid particle swarm optimization and parallel variable neighborhood search algorithm for flexible job shop scheduling with assembly process. Assem Autom. https:\/\/doi.org\/10.1108\/AA-11-2018-0178","DOI":"10.1108\/AA-11-2018-0178"},{"issue":"43\u201344","key":"14544_CR5","doi-asserted-by":"publisher","first-page":"32285","DOI":"10.1007\/s11042-020-09477-2","volume":"79","author":"Y Gao","year":"2020","unstructured":"Gao Y, Xie Z, Yu X (2020) A hybrid algorithm for integrated scheduling problem of complex products with tree structure. Multimed Tools Appl 79(43\u201344):32285\u201332304","journal-title":"Multimed Tools Appl"},{"issue":"4","key":"14544_CR6","doi-asserted-by":"publisher","first-page":"e12683","DOI":"10.1111\/exsy.12683","volume":"38","author":"Y Gao","year":"2021","unstructured":"Gao Y, Xie Z, Yang D, Yu X (2021) Flexible integrated scheduling algorithm based on remaining work probability selection coding. Expert Syst 38(4):e12683","journal-title":"Expert Syst"},{"issue":"4","key":"14544_CR7","doi-asserted-by":"publisher","first-page":"246","DOI":"10.3901\/JME.2020.04.246","volume":"56","author":"W Guo","year":"2020","unstructured":"Guo W, Lei Q, Song Y, Lv X, Li L (2020) Integrated scheduling algorithm of complex product with no-wait constraint based on virtual component. J Mech Eng 56(4):246\u2013257","journal-title":"J Mech Eng"},{"key":"14544_CR8","unstructured":"Guo W, Song Y, Zhou P, Lei Q (2020) Integrated scheduling algorithm of complex product with no-wait constraint based on reversed virtual component. Comput Integr Manuf Syst 26(12):3313\u20133328"},{"issue":"3","key":"14544_CR9","doi-asserted-by":"publisher","first-page":"547","DOI":"10.1016\/S0377-2217(96)00312-8","volume":"103","author":"A Hariri","year":"1997","unstructured":"Hariri A, Potts C (1997) A branch and bound algorithm for the two-stage assembly scheduling problem. Eur J Oper Res 103(3):547\u2013556","journal-title":"Eur J Oper Res"},{"issue":"1","key":"14544_CR10","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1109\/70.210791","volume":"9","author":"DJ Hoitomt","year":"1993","unstructured":"Hoitomt DJ, Luh PB, Pattipati KR (1993) A practical approach to job-shop scheduling problems. IEEE Trans Robot Autom 9(1):1\u201313","journal-title":"IEEE Trans Robot Autom"},{"issue":"3","key":"14544_CR11","doi-asserted-by":"publisher","first-page":"400","DOI":"10.1287\/opre.13.3.400","volume":"13","author":"E Ignall","year":"1965","unstructured":"Ignall E, Schrage L (1965) Application of the branch and bound technique to some flow-shop scheduling problems. Oper Res 13(3):400\u2013412","journal-title":"Oper Res"},{"issue":"16","key":"14544_CR12","first-page":"1940","volume":"31","author":"B Liao","year":"2020","unstructured":"Liao B, Lei Q, Wu W, Song Y, Guo W (2020) Hybrid teaching-learning-based optimization algorithms for the integrated scheduling problem of multi-workshop collaboration. Chin Mech Eng 31(16):1940\u20131949","journal-title":"Chin Mech Eng"},{"issue":"1","key":"14544_CR13","doi-asserted-by":"publisher","first-page":"496","DOI":"10.1111\/itor.12767","volume":"29","author":"W Lin","year":"2020","unstructured":"Lin W, Deng Q, Han W, Gong G, Li K (2020) An effective algorithm for flexible assembly job-shop scheduling with tight job constraints. Int Trans Oper Res 29(1):496\u2013525","journal-title":"Int Trans Oper Res"},{"key":"14544_CR14","doi-asserted-by":"publisher","first-page":"105954","DOI":"10.1016\/j.asoc.2019.105954","volume":"87","author":"M Liu","year":"2020","unstructured":"Liu M, Yao X, Li Y (2020) Hybrid whale optimization algorithm enhanced with L\u00e9vy flight and differential evolution for job shop scheduling problems. Appl Soft Comput 87:105954","journal-title":"Appl Soft Comput"},{"issue":"4","key":"14544_CR15","doi-asserted-by":"publisher","first-page":"597","DOI":"10.1016\/S0360-8352(03)00077-9","volume":"45","author":"BJ Park","year":"2003","unstructured":"Park BJ, Choi HR, Kim HS (2003) A hybrid genetic algorithm for the job shop scheduling problems. Comput Ind Eng 45(4):597\u2013613","journal-title":"Comput Ind Eng"},{"issue":"4","key":"14544_CR16","doi-asserted-by":"publisher","first-page":"362","DOI":"10.1504\/IJMCP.2016.079843","volume":"9","author":"M Paul","year":"2016","unstructured":"Paul M, Sridharan R, Ramanan TR (2016) A multi-objective decision-making framework using preference selection index for assembly job shop scheduling problem. Int J Manag Concepts Philos 9(4):362\u2013387","journal-title":"Int J Manag Concepts Philos"},{"issue":"3","key":"14544_CR17","first-page":"234","volume":"10","author":"M Paul","year":"2018","unstructured":"Paul M, Ramanan TR, Sridharan R (2018) Simulation modelling and analysis of dispatching rules in an assembly job shop production system with machine breakdowns. Int J Adv Oper Manag 10(3):234\u2013251","journal-title":"Int J Adv Oper Manag"},{"issue":"20","key":"14544_CR18","doi-asserted-by":"publisher","first-page":"6089","DOI":"10.1080\/00207543.2010.527385","volume":"49","author":"MT Pereira","year":"2011","unstructured":"Pereira MT, Miguel CS (2011) An integrative heuristic method for detailed operations scheduling in assembly job shop systems. Int J Prod Res 49(20):6089\u20136105","journal-title":"Int J Prod Res"},{"issue":"9\u201312","key":"14544_CR19","doi-asserted-by":"publisher","first-page":"1159","DOI":"10.1007\/s00170-009-2337-8","volume":"48","author":"X Shao","year":"2010","unstructured":"Shao X, Wang B, Rao Y, Gao L, Xu C (2010) Metaheuristic approaches to sequencing mixed-model fabrication\/assembly systems with two objectives. Int J Adv Manuf Technol 48(9\u201312):1159\u20131171","journal-title":"Int J Adv Manuf Technol"},{"issue":"9","key":"14544_CR20","doi-asserted-by":"publisher","first-page":"2604","DOI":"10.1080\/00207543.2019.1622052","volume":"58","author":"F Shi","year":"2019","unstructured":"Shi F, Zhao S, Meng Y (2019) Hybrid algorithm based on improved extended shifting bottleneck procedure and GA for assembly job shop scheduling problem. Int J Prod Res 58(9):2604\u20132625","journal-title":"Int J Prod Res"},{"issue":"1","key":"14544_CR21","first-page":"115","volume":"16","author":"F Wang","year":"2010","unstructured":"Wang F, Zhao G, Jia Z, Lu X, Wang L (2010) Assembly job shop scheduling based on feasible solution space genetic algorithm. Comput Integr Manuf Syst 16(1):115\u2013120","journal-title":"Comput Integr Manuf Syst"},{"issue":"3","key":"14544_CR22","doi-asserted-by":"publisher","first-page":"4609","DOI":"10.3233\/JIFS-189721","volume":"41","author":"Y Xia","year":"2021","unstructured":"Xia Y, Xie Z, Xin Y, Zhang X (2021) A multi-shop integrated scheduling algorithm with fixed output constraint. J Intell Fuzzy Syst 41(3):4609\u20134617","journal-title":"J Intell Fuzzy Syst"},{"issue":"17","key":"14544_CR23","doi-asserted-by":"publisher","first-page":"217","DOI":"10.3901\/JME.2021.17.217","volume":"57","author":"Z Xie","year":"2021","unstructured":"Xie Z, Lv N (2021) Integrated scheduling algorithm with pre-start device. J Mech Eng 57(17):217\u2013225","journal-title":"J Mech Eng"},{"issue":"3","key":"14544_CR24","doi-asserted-by":"publisher","first-page":"766","DOI":"10.1016\/j.cie.2009.02.004","volume":"57","author":"Z Xie","year":"2009","unstructured":"Xie Z, Hao S, Ye G, Tan G (2009) A new algorithm for complex product flexible scheduling with constraint between jobs. Comput Ind Eng 57(3):766\u2013772","journal-title":"Comput Ind Eng"},{"issue":"2","key":"14544_CR25","first-page":"150","volume":"37","author":"Z Xie","year":"2010","unstructured":"Xie Z, Zhang L, Yang J (2010) Integrated scheduling algorithm of complex product based on scheduling long-path. Comput Sci 37(2):150\u2013153","journal-title":"Comput Sci"},{"issue":"4","key":"14544_CR26","doi-asserted-by":"publisher","first-page":"177","DOI":"10.3901\/JME.2011.04.177","volume":"47","author":"Z Xie","year":"2011","unstructured":"Xie Z, Shao X, Yang J (2011) Algorithm for integrated flexible scheduling with device-independence deferred constraint. J Mech Eng 47(4):177\u2013185","journal-title":"J Mech Eng"},{"issue":"4","key":"14544_CR27","doi-asserted-by":"publisher","first-page":"818","DOI":"10.3724\/SP.J.1016.2013.00818","volume":"36","author":"Z Xie","year":"2013","unstructured":"Xie Z, Xin Y, Yang J (2013) Multi-batch processing integrated scheduling algorithm based on signal driven. Chin J Comput 36(4):818\u2013828","journal-title":"Chin J Comput"},{"issue":"18","key":"14544_CR28","doi-asserted-by":"publisher","first-page":"203","DOI":"10.3901\/JME.2014.18.203","volume":"50","author":"Z Xie","year":"2014","unstructured":"Xie Z, Gui Z, Yang J (2014) Dynamic parallel integrated flexible scheduling algorithm based on device driver and essential path. J Mech Eng. 50(18):203\u2013212","journal-title":"J Mech Eng."},{"issue":"11","key":"14544_CR29","first-page":"1150","volume":"34","author":"Z Xie","year":"2014","unstructured":"Xie Z, Zhou H, Yu J, Gui Z (2014) Conflict mediation algorithm of integrated flexible scheduling based on device driver. Trans Beijing Inst Technol 34(11):1150\u20131156","journal-title":"Trans Beijing Inst Technol"},{"issue":"5","key":"14544_CR30","first-page":"532","volume":"37","author":"Z Xie","year":"2017","unstructured":"Xie Z, Li Z, Xue J, Xin Y (2017) Machine-driven integrated scheduling algorithm with equipment idle adjustment. Trans Beijing Inst Technol. 37(5):532\u2013536","journal-title":"Trans Beijing Inst Technol."},{"issue":"1","key":"14544_CR31","first-page":"1","volume":"29","author":"Z Xie","year":"2020","unstructured":"Xie Z, Yang D, Ma M, Yu X (2020) An improved artificial bee colony algorithm for the flexible integrated scheduling problem using networked devices collaboration. Int J Coop Inf Syst 29(1):1\u201319","journal-title":"Int J Coop Inf Syst"},{"issue":"04","key":"14544_CR32","doi-asserted-by":"publisher","first-page":"240","DOI":"10.3901\/JME.2021.04.240","volume":"57","author":"Z Xie","year":"2021","unstructured":"Xie Z, Zhou W, Yu Z (2021) Integrated scheduling algorithm for dynamic adjustment of equipment maintenance start time. J Mech Eng 57(04):240\u2013246","journal-title":"J Mech Eng"},{"issue":"3","key":"14544_CR33","doi-asserted-by":"publisher","first-page":"487","DOI":"10.1109\/TEM.2017.2785774","volume":"65","author":"S Zhang","year":"2018","unstructured":"Zhang S, Wang S (2018) Flexible assembly job-shop scheduling with sequence-dependent setup times and part sharing in a dynamic environment: constraint programming model, mixed-integer programming model, and dispatching rules. IEEE Trans Eng Manag 65(3):487\u2013504","journal-title":"IEEE Trans Eng Manag"},{"issue":"2","key":"14544_CR34","doi-asserted-by":"publisher","first-page":"441","DOI":"10.1016\/j.ejor.2019.11.016","volume":"283","author":"S Zhang","year":"2020","unstructured":"Zhang S, Li X, Zhang B, Wang B (2020) Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system. Eur J Oper Res 283(2):441\u2013460","journal-title":"Eur J Oper Res"},{"issue":"9","key":"14544_CR35","first-page":"1938","volume":"23","author":"X Zhang","year":"2017","unstructured":"Zhang X, Xie Z, Xin Y, Yang J (2017) Integrated scheduling algorithm of two workshops based on optimal time. Comput Integr Manuf Syst 23(9):1938\u20131949","journal-title":"Comput Integr Manuf Syst"},{"issue":"21","key":"14544_CR36","doi-asserted-by":"publisher","first-page":"29989","DOI":"10.1007\/s11042-018-6805-8","volume":"78","author":"X Zhang","year":"2019","unstructured":"Zhang X, Ma C, Wu J (2019) Multi-batch integrated scheduling algorithm based on time-selective. Multimed Tools Appl 78(21):29989\u201330010","journal-title":"Multimed Tools Appl"},{"key":"14544_CR37","doi-asserted-by":"crossref","unstructured":"Zhang X, Xin Y, Yang J (2019) Time\u2010selective integrated scheduling algorithm with backtracking adaptation strategy. Expert Syst 36(3):e12305","DOI":"10.1111\/exsy.12305"}],"container-title":["Multimedia Tools and Applications"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s11042-023-14544-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s11042-023-14544-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s11042-023-14544-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,9,2]],"date-time":"2023-09-02T08:19:00Z","timestamp":1693642740000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s11042-023-14544-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,3,10]]},"references-count":37,"journal-issue":{"issue":"22","published-print":{"date-parts":[[2023,9]]}},"alternative-id":["14544"],"URL":"https:\/\/doi.org\/10.1007\/s11042-023-14544-5","relation":{},"ISSN":["1380-7501","1573-7721"],"issn-type":[{"type":"print","value":"1380-7501"},{"type":"electronic","value":"1573-7721"}],"subject":[],"published":{"date-parts":[[2023,3,10]]},"assertion":[{"value":"8 May 2021","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"31 May 2022","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"31 January 2023","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"10 March 2023","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"No potential conflict of interest was reported by authors.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interests\/Competing interests"}}]}}