{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,9,25]],"date-time":"2025-09-25T18:10:56Z","timestamp":1758823856107},"reference-count":16,"publisher":"Springer Science and Business Media LLC","issue":"3","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Supercomput"],"published-print":{"date-parts":[[2008,6]]},"DOI":"10.1007\/s11227-007-0158-9","type":"journal-article","created":{"date-parts":[[2007,11,23]],"date-time":"2007-11-23T00:22:54Z","timestamp":1195777374000},"page":"257-273","source":"Crossref","is-referenced-by-count":44,"title":["A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags"],"prefix":"10.1007","volume":"44","author":[{"given":"Majid","family":"Sabzehparvar","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"S. Mohammad","family":"Seyed-Hosseini","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2007,11,24]]},"reference":[{"key":"158_CR1","doi-asserted-by":"crossref","first-page":"251","DOI":"10.1007\/s00291-003-0155-1","volume":"26","author":"P Baptiste","year":"2004","unstructured":"Baptiste P, Demassey S (2004) Tight LP bounds for resource constrained project scheduling. OR Spectr 26:251\u2013262","journal-title":"OR Spectr"},{"key":"158_CR2","first-page":"201","volume":"16","author":"M Bartuch","year":"1988","unstructured":"Bartuch M, M\u00f6hring RH, Radermacher FJ (1988) Scheduling project networks with resource constraints and time windows. Ann Oper Res 16:201\u2013240","journal-title":"Ann Oper Res"},{"key":"158_CR3","doi-asserted-by":"crossref","first-page":"355","DOI":"10.1016\/S0377-2217(99)00489-0","volume":"127","author":"P Brucker","year":"2000","unstructured":"Brucker P, Knust S (2000) A linear programming and constraint propagation-based lower bound for RCPSP. Eur J Oper Res 127:355\u2013362","journal-title":"Eur J Oper Res"},{"key":"158_CR4","doi-asserted-by":"crossref","first-page":"3270","DOI":"10.1016\/j.cor.2005.12.005","volume":"34","author":"HD Chen","year":"2007","unstructured":"Chen HD, Xu R (2007) A new heuristic algorithm for rectangle packing. Comput Oper Res 34:3270\u20133280","journal-title":"Comput Oper Res"},{"key":"158_CR5","unstructured":"Demeulemeester EL, Herroelen WS (2002) Project scheduling, a research handbook, ISBN 1-4020-7051-9. Kluwer"},{"key":"158_CR6","doi-asserted-by":"crossref","first-page":"538","DOI":"10.1016\/S0377-2217(99)00151-4","volume":"119","author":"B Reyck De","year":"1999","unstructured":"De Reyck B, Herroelen W (1999) The multi-mode resource-constrained project scheduling problem with generalized precedence relations. Eur J Oper Res 119:538\u2013556","journal-title":"Eur J Oper Res"},{"key":"158_CR7","isbn-type":"print","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-642-57506-8","volume-title":"Project scheduling with time windows, from theory to application","author":"U Dorndorf","year":"2002","unstructured":"Dorndorf U (2002) Project scheduling with time windows, from theory to application, ISBN 3-7908-1516-0. Physica, Heidelberg","ISBN":"http:\/\/id.crossref.org\/isbn\/3790815160"},{"key":"158_CR8","doi-asserted-by":"crossref","first-page":"383","DOI":"10.1016\/0377-2217(94)00184-E","volume":"82","author":"SE Elmaghraby","year":"1995","unstructured":"Elmaghraby SE (1995) Activity nets: A guided tour through some recent developments. Eur J Oper Res 82:383\u2013408","journal-title":"Eur J Oper Res"},{"key":"158_CR9","doi-asserted-by":"crossref","first-page":"283","DOI":"10.1002\/(SICI)1097-0037(199812)32:4<283::AID-NET5>3.0.CO;2-I","volume":"32","author":"S Hartmann","year":"1998","unstructured":"Hartmann S, Drexl A (1998) Project scheduling with multiple modes: A comparison of exact algorithms. Networks 32:283\u2013298","journal-title":"Networks"},{"key":"158_CR10","doi-asserted-by":"crossref","first-page":"348","DOI":"10.1016\/S0377-2217(02)00136-4","volume":"144","author":"R Heilmann","year":"2003","unstructured":"Heilmann R (2003) A branch-and-bound procedure for the multi-mode resource constrained project scheduling problem with minimum and maximum time lags. Eur J Oper Res 144:348\u2013365","journal-title":"Eur J Oper Res"},{"key":"158_CR11","doi-asserted-by":"crossref","first-page":"1693","DOI":"10.1287\/mnsc.41.10.1693","volume":"41","author":"R Kolisch","year":"1995","unstructured":"Kolisch R, Sprecher A, Drexl A (1995) Characterization and generation of a general class of resource-constrained project scheduling problems. Manag Sci 41:1693\u20131703","journal-title":"Manag Sci"},{"key":"158_CR12","isbn-type":"print","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-540-24800-2","volume-title":"Project scheduling with time windows and scarce resources","author":"K Neumann","year":"2003","unstructured":"Neumann K, Schwindt C, Zimmermann J (2003) Project scheduling with time windows and scarce resources, ISBN 3-540-40125-3. Springer, Berlin","ISBN":"http:\/\/id.crossref.org\/isbn\/3540401253"},{"key":"158_CR13","unstructured":"Schwindt C (1998) Generation of resource-constrained project scheduling problems subject to temporal constraints. Report WIOR-543, University of Karlsruhe"},{"key":"158_CR14","doi-asserted-by":"crossref","unstructured":"Seyed-Hosseini SM, Sabzehparvar M (2007) A geometrical model for the multi-mode resource constrained project scheduling problem. In: Business research conference for international academy of business disciplines, Florida, USA","DOI":"10.1007\/s11227-007-0158-9"},{"key":"158_CR15","doi-asserted-by":"crossref","first-page":"431","DOI":"10.1016\/S0377-2217(97)00348-2","volume":"107","author":"A Sprecher","year":"1998","unstructured":"Sprecher A, Drexl A (1998) Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm. Eur J Oper Res 107:431\u2013450","journal-title":"Eur J Oper Res"},{"key":"158_CR16","doi-asserted-by":"crossref","first-page":"1197","DOI":"10.1287\/mnsc.28.10.1197","volume":"28","author":"FB Talbot","year":"1982","unstructured":"Talbot FB (1982) Resource-constrained project scheduling problem with time-resource trade-offs: the nonpreemptive case. Manag Sci 28:1197\u20131210","journal-title":"Manag Sci"}],"container-title":["The Journal of Supercomputing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11227-007-0158-9.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,5]],"date-time":"2019-05-05T01:02:17Z","timestamp":1557018137000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11227-007-0158-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007,11,24]]},"references-count":16,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2008,6]]}},"alternative-id":["158"],"URL":"https:\/\/doi.org\/10.1007\/s11227-007-0158-9","relation":{},"ISSN":["0920-8542","1573-0484"],"issn-type":[{"value":"0920-8542","type":"print"},{"value":"1573-0484","type":"electronic"}],"subject":[],"published":{"date-parts":[[2007,11,24]]}}}