{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,14]],"date-time":"2026-04-14T05:18:45Z","timestamp":1776143925487,"version":"3.50.1"},"reference-count":32,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2019,11,1]],"date-time":"2019-11-01T00:00:00Z","timestamp":1572566400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2019,11,1]],"date-time":"2019-11-01T00:00:00Z","timestamp":1572566400000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Supercomput"],"published-print":{"date-parts":[[2020,2]]},"DOI":"10.1007\/s11227-019-03055-6","type":"journal-article","created":{"date-parts":[[2019,11,1]],"date-time":"2019-11-01T14:03:41Z","timestamp":1572617021000},"page":"964-988","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":19,"title":["Resource levelling problem in construction projects under neutrosophic environment"],"prefix":"10.1007","volume":"76","author":[{"given":"Mohamed","family":"Abdel-Basset","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mumtaz","family":"Ali","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Asma","family":"Atef","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2019,11,1]]},"reference":[{"issue":"2","key":"3055_CR1","doi-asserted-by":"publisher","first-page":"267","DOI":"10.1139\/l02-007","volume":"29","author":"SS Leu","year":"2002","unstructured":"Leu SS, Hung TH (2002) An optimal construction resource leveling scheduling simulation model. Can J Civ Eng 29(2):267\u2013275","journal-title":"Can J Civ Eng"},{"issue":"2","key":"3055_CR2","doi-asserted-by":"publisher","first-page":"302","DOI":"10.1061\/(ASCE)0733-9364(1989)115:2(302)","volume":"115","author":"SM Easa","year":"1989","unstructured":"Easa SM (1989) Resource leveling in construction by optimization. J Constr Eng Manag 115(2):302\u2013316","journal-title":"J Constr Eng Manag"},{"issue":"2","key":"3055_CR3","doi-asserted-by":"publisher","first-page":"425","DOI":"10.1016\/S0377-2217(99)00498-1","volume":"127","author":"K Neumann","year":"2000","unstructured":"Neumann K, Zimmermann J (2000) Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints. Eur J Oper Res 127(2):425\u2013443","journal-title":"Eur J Oper Res"},{"issue":"1","key":"3055_CR4","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ejor.2009.11.005","volume":"207","author":"S Hartmann","year":"2010","unstructured":"Hartmann S, Briskorn D (2010) A survey of variants and extensions of the resource-constrained project scheduling problem. Eur J Oper Res 207(1):1\u201314","journal-title":"Eur J Oper Res"},{"issue":"5","key":"3055_CR5","doi-asserted-by":"publisher","first-page":"493","DOI":"10.1016\/j.ijproman.2008.08.006","volume":"27","author":"A Kastor","year":"2009","unstructured":"Kastor A, Sirakoulis K (2009) the effectiveness of resource leveling tools for resource constraint project scheduling problem. Int J Project Manage 27(5):493\u2013500","journal-title":"Int J Project Manage"},{"key":"3055_CR6","first-page":"361","volume-title":"Handbook on Project Management and Scheduling Vol.1","author":"Julia Rieck","year":"2014","unstructured":"Rieck J, Zimmermann J (2015) Exact methods for resource leveling problems. In: Handbook on project management and scheduling, Springer, Cham, vol 1, pp 361\u2013387\u200f"},{"issue":"11","key":"3055_CR7","doi-asserted-by":"publisher","first-page":"1172","DOI":"10.1061\/(ASCE)CO.1943-7862.0000097","volume":"135","author":"K El-Rayes","year":"2009","unstructured":"El-Rayes K, Jun DH (2009) Optimizing resource leveling in construction projects. J Constr Eng Manag 135(11):1172\u20131180","journal-title":"J Constr Eng Manag"},{"issue":"8","key":"3055_CR8","doi-asserted-by":"publisher","first-page":"552","DOI":"10.1139\/cjce-2014-0309","volume":"42","author":"MA Rahman","year":"2015","unstructured":"Rahman MA, Elazouni A (2015) Devising extended-duration schedules of enhanced resource leveling. Can J Civ Eng 42(8):552\u2013562","journal-title":"Can J Civ Eng"},{"key":"3055_CR9","first-page":"319","volume-title":"Handbook on Project Management and Scheduling Vol.1","author":"Savio B. Rodrigues","year":"2014","unstructured":"Rodrigues SB, Yamashita DS (2015) Exact methods for the resource availability cost problem. In: Handbook on project management and scheduling, Springer, Cham, vol 1, pp 319\u2013338\u200f"},{"issue":"2","key":"3055_CR10","doi-asserted-by":"publisher","first-page":"508","DOI":"10.1016\/j.ejor.2017.10.022","volume":"266","author":"T Atan","year":"2018","unstructured":"Atan T, Eren E (2018) Optimal project duration for resource leveling. Eur J Oper Res 266(2):508\u2013520","journal-title":"Eur J Oper Res"},{"issue":"1","key":"3055_CR11","doi-asserted-by":"publisher","first-page":"57","DOI":"10.1016\/j.ejor.2010.07.021","volume":"208","author":"T Bhaskar","year":"2011","unstructured":"Bhaskar T, Pal MN, Pal AK (2011) A heuristic method for RCPSP with fuzzy activity times. Eur J Oper Res 208(1):57\u201366","journal-title":"Eur J Oper Res"},{"issue":"2","key":"3055_CR12","doi-asserted-by":"publisher","first-page":"137","DOI":"10.1061\/(ASCE)CO.1943-7862.0000261","volume":"137","author":"S Hossein Hashemi Doulabi","year":"2010","unstructured":"Hossein Hashemi Doulabi S, Seifi A, Shariat SY (2010) Efficient hybrid genetic algorithm for resource leveling via activity splitting. J Constr Eng Manag 137(2):137\u2013146","journal-title":"J Constr Eng Manag"},{"issue":"1","key":"3055_CR13","doi-asserted-by":"publisher","first-page":"23","DOI":"10.1061\/(ASCE)0733-9364(1999)125:1(23)","volume":"125","author":"J Son","year":"1999","unstructured":"Son J, Skibniewski MJ (1999) Multi-heuristic approach for resource leveling problem in construction engineering: hybrid approach. J Constr Eng Manag 125(1):23\u201331","journal-title":"J Constr Eng Manag"},{"key":"3055_CR14","first-page":"389","volume-title":"Handbook on Project Management and Scheduling Vol.1","author":"Symeon E. Christodoulou","year":"2014","unstructured":"Christodoulou SE, Michaelidou-Kamenou A, Ellinas G (2015) Heuristic methods for resource leveling problems. In: Handbook on project management and scheduling, Springer, Cham, vol 1, pp 389\u2013407"},{"issue":"1","key":"3055_CR15","first-page":"50","volume":"4","author":"F Ballest\u00edn","year":"2007","unstructured":"Ballest\u00edn F, Schwindt C, Zimmermann J (2007) Resource leveling in make-to-order production: modeling and heuristic solution method. Int J Oper Res 4(1):50\u201362","journal-title":"Int J Oper Res"},{"issue":"2","key":"3055_CR16","doi-asserted-by":"publisher","first-page":"145","DOI":"10.1007\/s10951-013-0344-y","volume":"17","author":"S Kreter","year":"2014","unstructured":"Kreter S, Rieck J, Zimmermann J (2014) The total adjustment cost problem: applications, models, and solution algorithms. J Sched 17(2):145\u2013160","journal-title":"J Sched"},{"issue":"5","key":"3055_CR17","doi-asserted-by":"publisher","first-page":"491","DOI":"10.1016\/j.autcon.2010.12.006","volume":"20","author":"TW Liao","year":"2011","unstructured":"Liao TW, Egbelu PJ, Sarker BR, Leu SS (2011) Meta-heuristics for project and construction management\u2013A state-of-the-art review. Autom Constr 20(5):491\u2013505","journal-title":"Autom Constr"},{"key":"3055_CR18","doi-asserted-by":"crossref","unstructured":"Van Peteghem V, Vanhoucke M (2015) Heuristic methods for the resource availability cost problem. In: Handbook on project management and scheduling, Springer, Cham, vol 1, pp 339\u2013359","DOI":"10.1007\/978-3-319-05443-8_16"},{"key":"3055_CR19","doi-asserted-by":"publisher","first-page":"161","DOI":"10.1016\/j.autcon.2012.10.003","volume":"29","author":"JL Ponz-Tienda","year":"2013","unstructured":"Ponz-Tienda JL, Yepes V, Pellicer E, Moreno-Flores J (2013) The resource leveling problem with multiple resources using an adaptive genetic algorithm. Autom Constr 29:161\u2013172","journal-title":"Autom Constr"},{"issue":"1","key":"3055_CR20","doi-asserted-by":"publisher","first-page":"27","DOI":"10.1016\/S0926-5805(99)00011-4","volume":"10","author":"SS Leu","year":"2000","unstructured":"Leu SS, Yang CH, Huang JC (2000) Resource leveling in construction by genetic algorithm-based optimization and its decision support system application. Autom Constr 10(1):27\u201341","journal-title":"Autom Constr"},{"issue":"4","key":"3055_CR21","doi-asserted-by":"publisher","first-page":"917","DOI":"10.1139\/l96-898","volume":"23","author":"D Savin","year":"1996","unstructured":"Savin D, Alkass S, Fazio P (1996) Construction resource leveling using neural networks. Can J Civ Eng 23(4):917\u2013925","journal-title":"Can J Civ Eng"},{"issue":"6","key":"3055_CR22","doi-asserted-by":"publisher","first-page":"673","DOI":"10.1139\/l99-028","volume":"26","author":"SS Leu","year":"1999","unstructured":"Leu SS, Chen AT, Yang CH (1999) A fuzzy optimal model for construction resource leveling scheduling. Can J Civ Eng 26(6):673\u2013684","journal-title":"Can J Civ Eng"},{"issue":"1","key":"3055_CR23","doi-asserted-by":"publisher","first-page":"135","DOI":"10.1016\/j.engappai.2012.07.012","volume":"26","author":"M Masmoudi","year":"2013","unstructured":"Masmoudi M, Hait A (2013) Project scheduling under uncertainty using fuzzy modeling and solving techniques. Eng Appl Artif Intell 26(1):135\u2013149","journal-title":"Eng Appl Artif Intell"},{"issue":"6","key":"3055_CR24","doi-asserted-by":"publisher","first-page":"688","DOI":"10.1016\/j.ijproman.2007.09.012","volume":"26","author":"LD Long","year":"2008","unstructured":"Long LD, Ohsato A (2008) Fuzzy critical chain method for project scheduling under resource constraints and uncertainty. Int J Project Manage 26(6):688\u2013698","journal-title":"Int J Project Manage"},{"issue":"3","key":"3055_CR25","doi-asserted-by":"publisher","first-page":"1942","DOI":"10.1016\/j.ifacol.2015.06.371","volume":"48","author":"P Iyer","year":"2015","unstructured":"Iyer P, Liu Y, Sadeghpour F, Brennan RW (2015) A fuzzy-logic based resource leveling optimization tool. IFAC-P Line 48(3):1942\u20131947","journal-title":"IFAC-P Line"},{"key":"3055_CR26","first-page":"98","volume-title":"The ABCs of the critical path method","author":"FK Levy","year":"1963","unstructured":"Levy FK, Thompson GL, Wiest JD (1963) The ABCs of the critical path method. Harvard University, Graduate School of Business Administration, pp 98\u2013108"},{"issue":"2","key":"3055_CR27","first-page":"76","volume":"13","author":"AR Burgess","year":"1962","unstructured":"Burgess AR, Killebrew JB (1962) Variation in activity level on a cyclical arrow diagram. J Ind Eng 13(2):76\u201383","journal-title":"J Ind Eng"},{"key":"3055_CR28","volume-title":"Taylor series approximation to solve neutrosophic multi-objective programming problem","author":"IM Hezam","year":"2015","unstructured":"Hezam IM, Abdel-Baset M, Smarandache F (2015) Taylor series approximation to solve neutrosophic multi-objective programming problem. Infinite Study, Coimbatore"},{"issue":"1","key":"3055_CR29","doi-asserted-by":"publisher","first-page":"936","DOI":"10.1166\/jctn.2016.4896","volume":"13","author":"N El-Hefenawy","year":"2016","unstructured":"El-Hefenawy N, Metwally MA, Ahmed ZM, El-Henawy IM (2016) A review on the applications of neutrosophic sets. J Comput Theor Nanosci 13(1):936\u2013944","journal-title":"J Comput Theor Nanosci"},{"key":"3055_CR30","doi-asserted-by":"crossref","unstructured":"Saaty TL (2006) The analytic network process. In: Decision making with the analytic network process, Springer, Boston, pp 1\u201326","DOI":"10.1007\/0-387-33987-6_1"},{"key":"3055_CR31","first-page":"112","volume":"11","author":"M Abdel-Baset","year":"2016","unstructured":"Abdel-Baset M, Hezam IM, Smarandache F (2016) Neutrosophic goal programming. Neutrosophic Sets Syst 11:112\u2013118","journal-title":"J Comput Theor Nanosci"},{"issue":"1","key":"3055_CR32","first-page":"29","volume":"9","author":"IM Mahdi","year":"2002","unstructured":"Mahdi IM, Riley MJ, Fereig SM, Alex AP (2002) A multi-criteria approach to contractor selection. Eng Constr Architect Manag 9(1):29\u201337","journal-title":"Eng Constr Architect Manag"}],"container-title":["The Journal of Supercomputing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11227-019-03055-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11227-019-03055-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11227-019-03055-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,10,31]],"date-time":"2020-10-31T00:18:19Z","timestamp":1604103499000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11227-019-03055-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,11,1]]},"references-count":32,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2020,2]]}},"alternative-id":["3055"],"URL":"https:\/\/doi.org\/10.1007\/s11227-019-03055-6","relation":{},"ISSN":["0920-8542","1573-0484"],"issn-type":[{"value":"0920-8542","type":"print"},{"value":"1573-0484","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019,11,1]]},"assertion":[{"value":"1 November 2019","order":1,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Compliance with ethical standards"}},{"value":"Authors declare that there is no conflict of interest about the research.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}