{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,8,4]],"date-time":"2026-08-04T17:19:18Z","timestamp":1785863958751,"version":"3.56.0"},"reference-count":24,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2020,5,16]],"date-time":"2020-05-16T00:00:00Z","timestamp":1589587200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2020,5,16]],"date-time":"2020-05-16T00:00:00Z","timestamp":1589587200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Supercomput"],"published-print":{"date-parts":[[2021,2]]},"DOI":"10.1007\/s11227-020-03329-4","type":"journal-article","created":{"date-parts":[[2020,5,16]],"date-time":"2020-05-16T10:03:38Z","timestamp":1589623418000},"page":"1354-1376","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":43,"title":["Prediction of highway asphalt pavement performance based on Markov chain and artificial neural network approach"],"prefix":"10.1007","volume":"77","author":[{"given":"Zhichen","family":"Wang","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Naisheng","family":"Guo","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Shuang","family":"Wang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Yang","family":"Xu","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2020,5,16]]},"reference":[{"issue":"1","key":"3329_CR1","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1108\/ACMM-07-2014-1410","volume":"63","author":"X Shi","year":"2016","unstructured":"Shi X, Hansen G, Mills M et al (2016) Preserving the value of highway maintenance equipment against roadway deicers: a case study and preliminary cost benefit analysis. Anti-Corros Methods Mater 63(1):1\u20138","journal-title":"Anti-Corros Methods Mater"},{"key":"3329_CR2","doi-asserted-by":"publisher","first-page":"434","DOI":"10.1016\/j.proeng.2016.01.278","volume":"137","author":"J Zhao","year":"2016","unstructured":"Zhao J, Fu X, Zhang Y (2016) Research on risk assessment and safety management of highway maintenance project. Procedia Eng 137:434\u2013441","journal-title":"Procedia Eng"},{"key":"3329_CR3","first-page":"9","volume":"43","author":"D Wu","year":"2016","unstructured":"Wu D, Yuan C, Kumfer W et al (2016) A life-cycle optimization model using semi-Markov process for highway bridge maintenance. Appl Math Model 43:9","journal-title":"Appl Math Model"},{"issue":"6","key":"3329_CR4","first-page":"1","volume":"12","author":"Y Liu","year":"2018","unstructured":"Liu Y, Wang Y, Dong A (2018) Life-cycle CO2 emissions and influential factors for asphalt highway construction and maintenance activities in China. Int J Sustain Transp 12(6):1\u201313","journal-title":"Int J Sustain Transp"},{"issue":"1","key":"3329_CR5","doi-asserted-by":"publisher","first-page":"7","DOI":"10.1186\/s40327-017-0046-1","volume":"5","author":"J France-Mensah","year":"2017","unstructured":"France-Mensah J, O\u2019Brien WJ, Khwaja N et al (2017) GIS-based visualization of integrated highway maintenance and construction planning: a case study of Fort Worth, Texas. Vis Eng 5(1):7","journal-title":"Vis Eng"},{"issue":"1","key":"3329_CR6","doi-asserted-by":"publisher","first-page":"012031","DOI":"10.1088\/1757-899X\/176\/1\/012031","volume":"176","author":"Hermawan","year":"2017","unstructured":"Hermawan, Suprapto M, Setyawan A (2017) The use of International Roughness Index and structural number for rehabilitation and maintenance policy of local highway. IOP Conf Ser Mater Sci Eng 176(1):012031","journal-title":"IOP Conf Ser Mater Sci Eng"},{"key":"3329_CR7","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.tre.2018.02.008","volume":"113","author":"Z Lu","year":"2018","unstructured":"Lu Z, Qiang M (2018) Impacts of pavement deterioration and maintenance cost on Pareto-efficient contracts for highway franchising. Transp Res Part E Logist Transp Rev 113:1\u201321","journal-title":"Transp Res Part E Logist Transp Rev"},{"key":"3329_CR8","first-page":"231","volume":"97","author":"R Shah","year":"2017","unstructured":"Shah R, Mcmann O, Borthwick F (2017) Challenges and prospects of applying asset management principles to highway maintenance: a case study of the UK. Transp Res Part A 97:231\u2013243","journal-title":"Transp Res Part A"},{"issue":"3","key":"3329_CR9","doi-asserted-by":"publisher","first-page":"48","DOI":"10.1061\/JHTRCQ.0000580","volume":"11","author":"X Fan","year":"2017","unstructured":"Fan X, Gao F, He T et al (2017) Establishment of an evaluation model for asphalt pavement preventive maintenance based on improved EW-AHP. J Highw Transp Res Dev (Engl Edn) 11(3):48\u201353","journal-title":"J Highw Transp Res Dev (Engl Edn)"},{"issue":"2","key":"3329_CR10","first-page":"65","volume":"1","author":"J Seo","year":"2016","unstructured":"Seo J, Hatfield G, Kimn JH (2016) Probabilistic structural integrity evaluation of a highway steel bridge under unknown trucks. J Struct Integr Maint 1(2):65\u201372","journal-title":"J Struct Integr Maint"},{"key":"3329_CR11","doi-asserted-by":"publisher","first-page":"46","DOI":"10.1016\/j.tranpol.2017.06.002","volume":"59","author":"P Wheat","year":"2017","unstructured":"Wheat P (2017) Scale, quality and efficiency in road maintenance: evidence for English local authorities. Transp Policy 59:46\u201353","journal-title":"Transp Policy"},{"issue":"11","key":"3329_CR12","first-page":"1","volume":"29","author":"ZH Liu","year":"2016","unstructured":"Liu ZH, Wang XF, Sheng LI et al (2016) Influences of thermal and drying shrinkages on longitudinal reinforcement in continuously reinforced concrete pavement. China J Highw Transp 29(11):1\u20139","journal-title":"China J Highw Transp"},{"issue":"3","key":"3329_CR13","doi-asserted-by":"publisher","first-page":"253","DOI":"10.1080\/10298436.2014.993185","volume":"17","author":"KA Abaza","year":"2016","unstructured":"Abaza KA (2016) Back-calculation of transition probabilities for Markovian-based pavement performance prediction models. Int J Pavement Eng 17(3):253\u2013264","journal-title":"Int J Pavement Eng"},{"issue":"2","key":"3329_CR14","first-page":"178","volume":"4","author":"KWW Lee","year":"2017","unstructured":"Lee KWW, Wilson K, Hassan SA (2017) Prediction of performance and evaluation of flexible pavement rehabilitation strategies. J Traffic Transp Eng 4(2):178\u2013184","journal-title":"J Traffic Transp Eng"},{"issue":"1","key":"3329_CR15","doi-asserted-by":"publisher","first-page":"14","DOI":"10.1016\/j.ijprt.2015.12.002","volume":"9","author":"L Premkumar","year":"2016","unstructured":"Premkumar L, Vavrik WR (2016) Enhancing pavement performance prediction models for the Illinois Tollway System. Int J Pavement Res Technol 9(1):14\u201319","journal-title":"Int J Pavement Res Technol"},{"key":"3329_CR16","doi-asserted-by":"publisher","first-page":"41","DOI":"10.1016\/j.egypro.2016.01.005","volume":"137","author":"YH Yang","year":"2016","unstructured":"Yang YH, Jiang YH, Wang XC (2016) Pavement performance prediction methods and maintenance cost based on the structure load. Procedia Eng 137:41\u201348","journal-title":"Procedia Eng"},{"issue":"5","key":"3329_CR17","first-page":"448","volume":"3","author":"M Mazari","year":"2016","unstructured":"Mazari M, Rodriguez DD (2016) Prediction of pavement roughness using a hybrid gene expression programming-neural network technique. J Traffic Transp Eng 3(5):448\u2013455","journal-title":"J Traffic Transp Eng"},{"issue":"3","key":"3329_CR18","doi-asserted-by":"publisher","first-page":"264","DOI":"10.1080\/10298436.2017.1347435","volume":"19","author":"H Ozer","year":"2018","unstructured":"Ozer H, Al-Qadi IL, Singhvi P et al (2018) Prediction of pavement fatigue cracking at an accelerated testing section using asphalt mixture performance tests. Int J Pavement Eng 19(3):264\u2013278","journal-title":"Int J Pavement Eng"},{"issue":"2","key":"3329_CR19","doi-asserted-by":"publisher","first-page":"17","DOI":"10.1080\/14680629.2015.1083464","volume":"17","author":"KA Abaza","year":"2016","unstructured":"Abaza KA (2016) Simplified staged-homogenous Markov model for flexible pavement performance prediction. Road Mater Pavement Des 17(2):17","journal-title":"Road Mater Pavement Des"},{"issue":"4","key":"3329_CR20","doi-asserted-by":"publisher","first-page":"1335","DOI":"10.1007\/s00158-018-2133-x","volume":"59","author":"P Ghasemi","year":"2019","unstructured":"Ghasemi P, Aslani M, Rollins DK et al (2019) Principal component analysis-based predictive modeling and optimization of permanent deformation in asphalt pavement: elimination of correlated inputs and extrapolation in modeling. Struct Multidiscip Optim 59(4):1335\u20131353","journal-title":"Struct Multidiscip Optim"},{"key":"3329_CR21","doi-asserted-by":"publisher","first-page":"165","DOI":"10.1016\/j.conbuildmat.2017.11.124","volume":"161","author":"AR Ghanizadeh","year":"2018","unstructured":"Ghanizadeh AR, Rahrovan M, Bafghi KB (2018) The effect of cement and reclaimed asphalt pavement on the mechanical properties of stabilized base via full-depth reclamation. Constr Build Mater 161:165\u2013174","journal-title":"Constr Build Mater"},{"key":"3329_CR22","doi-asserted-by":"publisher","first-page":"385","DOI":"10.1016\/j.jclepro.2018.01.257","volume":"181","author":"Y Zhao","year":"2018","unstructured":"Zhao Y, Ying G, Yan S et al (2018) New method for making and selecting the compaction plan of asphalt pavement based on compaction quality and carbon emissions. J Clean Prod 181:385\u2013398","journal-title":"J Clean Prod"},{"key":"3329_CR23","doi-asserted-by":"publisher","first-page":"687","DOI":"10.1016\/j.conbuildmat.2017.11.114","volume":"160","author":"S Shirzad","year":"2018","unstructured":"Shirzad S, Aguirre MA, Bonilla L et al (2018) Mechanistic-empirical pavement performance of asphalt mixtures with recycled asphalt shingles. Constr Build Mater 160:687\u2013697","journal-title":"Constr Build Mater"},{"issue":"6","key":"3329_CR24","doi-asserted-by":"publisher","first-page":"2109","DOI":"10.1007\/s12205-018-1867-8","volume":"22","author":"Z Chen","year":"2018","unstructured":"Chen Z, Wang H, Xu Y et al (2018) A combinational prediction model for transverse crack of asphalt pavement. KSCE J Civ Eng 22(6):2109\u20132117","journal-title":"KSCE J Civ Eng"}],"container-title":["The Journal of Supercomputing"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s11227-020-03329-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s11227-020-03329-4\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s11227-020-03329-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,5,15]],"date-time":"2021-05-15T23:11:30Z","timestamp":1621120290000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s11227-020-03329-4"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,5,16]]},"references-count":24,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2021,2]]}},"alternative-id":["3329"],"URL":"https:\/\/doi.org\/10.1007\/s11227-020-03329-4","relation":{},"ISSN":["0920-8542","1573-0484"],"issn-type":[{"value":"0920-8542","type":"print"},{"value":"1573-0484","type":"electronic"}],"subject":[],"published":{"date-parts":[[2020,5,16]]},"assertion":[{"value":"16 May 2020","order":1,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}