{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,18]],"date-time":"2026-05-18T18:28:44Z","timestamp":1779128924088,"version":"3.51.4"},"reference-count":25,"publisher":"Springer Science and Business Media LLC","issue":"1-2","license":[{"start":{"date-parts":[[2006,2,1]],"date-time":"2006-02-01T00:00:00Z","timestamp":1138752000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Real-Time Syst"],"published-print":{"date-parts":[[2006,2]]},"DOI":"10.1007\/s11241-006-4962-8","type":"journal-article","created":{"date-parts":[[2006,2,27]],"date-time":"2006-02-27T07:04:15Z","timestamp":1141023855000},"page":"21-47","source":"Crossref","is-referenced-by-count":13,"title":["Dynamic Real-time Scheduling of Firm Periodic Tasks with Hard and Soft Aperiodic Tasks"],"prefix":"10.1007","volume":"32","author":[{"given":"Audrey","family":"Marchand","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Maryline","family":"Silly-Chetto","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2006,2,20]]},"reference":[{"issue":"10","key":"4962_CR1","doi-asserted-by":"crossref","first-page":"1035","DOI":"10.1109\/12.805154","volume":"48","author":"G-C. Buttazzo","year":"1999","unstructured":"Buttazzo, G.-C., and Caccamo, M. 1999. Minimizing aperiodic response times in a firm real-time environment. IEEE Transactions on Computers, 48(10): 1035\u20131052.","journal-title":"IEEE Transactions on Computers"},{"issue":"1","key":"4962_CR2","doi-asserted-by":"crossref","first-page":"22","DOI":"10.1109\/32.748916","volume":"25","author":"G-C. Buttazzo","year":"1999","unstructured":"Buttazzo, G.-C., and Sensini, F. 1999. Optimal deadline assingnment for scheduling soft aperiodic tasks in hard real-time environments. IEEE Transactions on Software Engineering, 25(1): 22\u201332.","journal-title":"IEEE Transactions on Software Engineering"},{"key":"4962_CR3","doi-asserted-by":"crossref","unstructured":"Caccamo, M., and Buttazzo, G. 1997. Exploiting skips in periodic tasks for enhancing aperiodic responsiveness. Proceedings of the 18th IEEE Real-Time Systems Symposium.","DOI":"10.1109\/REAL.1997.641294"},{"key":"4962_CR4","doi-asserted-by":"crossref","unstructured":"Caccamo, M., and Buttazzo, G. 1998. Optimal scheduling for fault-tolerant and firm real-time systems. Proceedings of the IEEE Real-Time Computing Systems and Applications.","DOI":"10.1109\/RTCSA.1998.726422"},{"issue":"10","key":"4962_CR5","doi-asserted-by":"crossref","first-page":"1261","DOI":"10.1109\/TSE.1989.559777","volume":"15","author":"H. Chetto","year":"1989","unstructured":"Chetto, H., and Chetto, M. 1989. Some results of the earliest deadline scheduling algorithm. IEEE Transactions on Software Engineering, 15(10): 1261\u20131269.","journal-title":"IEEE Transactions on Software Engineering"},{"key":"4962_CR6","unstructured":"Chetto, H., Chetto, M. and Bouchentouf, T. 1990. Dynamic scheduling of real-time tasks under precedence constraints. The Journal of Real-Time Systems, 181\u2013194."},{"key":"4962_CR7","unstructured":"Davis, R.-I., Tindell, K.-W., and Burns, A. 1993. Scheduling slack time in fixed priority preemptive systems. Proceedings of the Real-Time Systems Symposium, pp. 222\u2013231."},{"key":"4962_CR8","first-page":"21","volume":"9","author":"T-M. Ghazalie","year":"1995","unstructured":"Ghazalie, T.-M., and Baker, T.-P. 1995. Aperiodic servers in a deadline scheduling environment. The Journal of Real-Time Systems, 9: 21\u201336.","journal-title":"The Journal of Real-Time Systems"},{"issue":"4","key":"4962_CR9","doi-asserted-by":"crossref","first-page":"1443","DOI":"10.1109\/12.477249","volume":"44","author":"M. Hamdaoui","year":"1995","unstructured":"Hamdaoui, M., and Ramanathan, P. 1995. A dynamic priority assignment technique for streams with (m,k)-firm deadlines. IEEE Transactions on Computers, 44(4): 1443\u20131451.","journal-title":"IEEE Transactions on Computers"},{"key":"4962_CR10","doi-asserted-by":"crossref","unstructured":"Koren, G., and Shasha, D. 1995. Skip-over algorithms and complexity for overloaded systems that allow skips. In Proceedings of the 16th IEEE Real-Time Systems Symposium.","DOI":"10.1109\/REAL.1995.495201"},{"key":"4962_CR11","doi-asserted-by":"crossref","unstructured":"Lehoczky, J.-P., and Ramos-Thuel, S. 1992. An optimal algorithm for scheduling soft-aperiodic tasks in fixed-priority preemptive systems. In Proceedings of the 13th IEEE Real-Time Systems Symposium, pp. 110\u2013123.","DOI":"10.1109\/REAL.1992.242671"},{"key":"4962_CR12","unstructured":"Lehocsky, J.-P., Sha, J.-P., and Strosnider, K.-K. 1987. Enhanced aperiodic responsiveness in hard real-time environments. Proceedings of the IEEE Real-Time Systems Symposium, pp. 261\u2013270."},{"key":"4962_CR13","doi-asserted-by":"crossref","first-page":"237","DOI":"10.1016\/0166-5316(82)90024-4","volume":"2","author":"J-Y-T. Leung","year":"1982","unstructured":"Leung, J.-Y.-T., and Whitehead, J. 1982. On the complexity of fixed-priority scheduling of periodic real-time tasks. Performance Evaluation, 2: 237\u2013250.","journal-title":"Performance Evaluation"},{"key":"4962_CR14","unstructured":"Liu, J.-W.-S. 2000. Real-Time Systems. Prentice-Hall."},{"issue":"1","key":"4962_CR15","doi-asserted-by":"crossref","first-page":"46","DOI":"10.1145\/321738.321743","volume":"20","author":"C-L. Liu","year":"1973","unstructured":"Liu, C.-L., and Layland, J.-W. 1973. Scheduling algorithms for multiprogramming in a hard real-time environment. Journal of the Association for Computing Machinery, 20(1): 46\u201361.","journal-title":"Journal of the Association for Computing Machinery"},{"issue":"6","key":"4962_CR16","doi-asserted-by":"crossref","first-page":"388","DOI":"10.1109\/32.601081","volume":"23","author":"I. Ripoll","year":"1997","unstructured":"Ripoll, I., Crespo, A., and Garcia-Fornes, A. 1997. An optimal algorithm for scheduling soft aperiodic tasks in dynamic-priority preemptive systems. IEEE Transactions on Software Engineering, 23(6): 388\u2013400.","journal-title":"IEEE Transactions on Software Engineering"},{"key":"4962_CR17","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1023\/A:1008093629946","volume":"17","author":"M. Silly","year":"1999","unstructured":"Silly, M. The EDL Server for scheduling periodic and soft aperiodic tasks with resource constraints. The Journal of Real-Time Systems, 17: 1\u201325.","journal-title":"The Journal of Real-Time Systems"},{"key":"4962_CR18","doi-asserted-by":"crossref","unstructured":"Silly, M., Chetto, H., and Elyounsi, N. 1990. An optimal algorithm for guaranteeing sporadic tasks in hard real-time systems. IEEE Symposium on Parallel and Distributed Processing, pp. 578\u2013585.","DOI":"10.1109\/SPDP.1990.143607"},{"key":"4962_CR19","doi-asserted-by":"crossref","first-page":"27","DOI":"10.1007\/BF02341920","volume":"1","author":"B. Sprunt","year":"1989","unstructured":"Sprunt, B., Sha, L., and Lehoczky, J.-P. 1989. Aperiodic task sheduling for hard-real-time systems. The Journal of Real-Time Systems, 1: 27\u201360.","journal-title":"The Journal of Real-Time Systems"},{"key":"4962_CR20","doi-asserted-by":"crossref","unstructured":"Spuri, M., and Buttazzo, G.-C. 1994. Efficient aperiodic service under earliest deadline scheduling. In Proceedings of the IEEE Real-Time Systems Symposium.","DOI":"10.1109\/REAL.1994.342735"},{"key":"4962_CR21","doi-asserted-by":"crossref","unstructured":"Spuri, M., Buttazzo, G.-C., and Sensini, F. 1995. Robust aperiodic scheduling under dynamic priority systems. In Proceedings of the IEEE Real-Time Systems Symposium.","DOI":"10.1109\/REAL.1995.495211"},{"key":"4962_CR22","doi-asserted-by":"crossref","unstructured":"Spuri, M., and Buttazzo, G.-C. 1996. Scheduling aperiodic tasks in dynamic priority systems. The Journal of Real-Time Systems, 10(2).","DOI":"10.1007\/BF00360340"},{"key":"4962_CR23","doi-asserted-by":"crossref","unstructured":"Strosnider, J.-K., Lehoczky, J.-P., and Sha, L. 1995. The Deferrable server algorithm for enhanced aperiodic responsiveness in hard real-time environments. IEEE Trans. Computer, 44(1).","DOI":"10.1109\/12.368008"},{"issue":"10","key":"4962_CR24","doi-asserted-by":"crossref","first-page":"10","DOI":"10.1109\/2.7053","volume":"21","author":"J-A. Stankovic","year":"1988","unstructured":"Stankovic, J.-A. 1988. A serious problem for next-generation systems. IEEE Computer, 21(10): 10\u201319.","journal-title":"IEEE Computer"},{"key":"4962_CR25","doi-asserted-by":"crossref","unstructured":"Tia, T.-S., Liu, J.-W.-S., and Shankar, M. 1995. Algorithms and optimality of scheduling aperiodic requests in fixed-priority preemptive systems. The Journal of Real-Time Systems.","DOI":"10.1007\/BF00357882"}],"container-title":["Real-Time Systems"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11241-006-4962-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11241-006-4962-8\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11241-006-4962-8","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,1]],"date-time":"2019-06-01T07:04:27Z","timestamp":1559372667000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11241-006-4962-8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2006,2]]},"references-count":25,"journal-issue":{"issue":"1-2","published-print":{"date-parts":[[2006,2]]}},"alternative-id":["4962"],"URL":"https:\/\/doi.org\/10.1007\/s11241-006-4962-8","relation":{},"ISSN":["0922-6443","1573-1383"],"issn-type":[{"value":"0922-6443","type":"print"},{"value":"1573-1383","type":"electronic"}],"subject":[],"published":{"date-parts":[[2006,2]]}}}