{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2023,5,30]],"date-time":"2023-05-30T14:53:48Z","timestamp":1685458428872},"reference-count":12,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2006,11,3]],"date-time":"2006-11-03T00:00:00Z","timestamp":1162512000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Real-Time Syst"],"published-print":{"date-parts":[[2006,12,11]]},"DOI":"10.1007\/s11241-006-9005-y","type":"journal-article","created":{"date-parts":[[2006,11,2]],"date-time":"2006-11-02T21:28:40Z","timestamp":1162502920000},"page":"135-151","source":"Crossref","is-referenced-by-count":6,"title":["Guaranteeing Response Times for Aperiodic Tasks in Global Multiprocessor Scheduling"],"prefix":"10.1007","volume":"35","author":[{"given":"Lars","family":"Lundberg","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"H\u00e5kan","family":"Lennerstad","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2006,11,3]]},"reference":[{"key":"9005_CR1","doi-asserted-by":"crossref","unstructured":"Abdelzaher TF, Lu C (2001) Schedulability analysis and utilization bounds for highly scalable real-time services. In: Seventh IEEE real-time technology and applications symposium, Taipei, Taiwan, pp 15\u201325","DOI":"10.1109\/RTTAS.2001.929862"},{"key":"9005_CR2","doi-asserted-by":"crossref","unstructured":"Abdelzaher TF, Andersson B, Johnsson J, Sharma V, Nguen M (2002) The aperiodic multiprocessor utilization bound for liquid tasks. In: Seventh IEEE real-time technology and applications symposium, San Jose, USA, pp 173\u2013184","DOI":"10.1109\/RTTAS.2002.1137392"},{"key":"9005_CR3","doi-asserted-by":"crossref","unstructured":"Abdelzaher TF, Sharma V (2003) A synthetic utilization bound for aperiodic tasks with resource requirements. In: Proc 15th euromicro conference on real-time systems (ECRTS\u201903), Porto, Portugal","DOI":"10.1109\/EMRTS.2003.1212737"},{"key":"9005_CR4","doi-asserted-by":"crossref","unstructured":"Andersson B, Baruah S, Jonsson J (2001) Static-priority scheduling on multiprocessors. In: Proc IEEE real-time systems symposium (RTSS\u201901), London, pp 193\u2013202","DOI":"10.1109\/REAL.2001.990610"},{"key":"9005_CR5","unstructured":"Andersson B, Jonsson J (2000) Some insights on fixed priority preemptive non-partitioned multiprocessor scheduling. In: Proc IEEE real-time systems symposium, Work-in-progress session, Orlando, Florida"},{"key":"9005_CR6","unstructured":"Andersson B (2000) Synthetic utilization in online aperiodic scheduling. In: Proc IEEE real-time systems symposium, Work-in-progress session, Cancun, Mexico"},{"key":"9005_CR7","doi-asserted-by":"crossref","unstructured":"Andersson B, Abdelzaher T, Jonsson J (2003) Global priority-driven aperiodic scheduling on multiprocessors. In: Proc international parallel and distributed processing symposium, Nice, France","DOI":"10.1109\/IPDPS.2003.1213082"},{"key":"9005_CR8","doi-asserted-by":"crossref","unstructured":"Andersson B, Abdelzaher T, Jonsson J (2003) Partitioned aperiodic scheduling on multiprocessors. In: Proc international parallel and distributed processing symposium, Nice, France","DOI":"10.1109\/IPDPS.2003.1213083"},{"issue":"1","key":"9005_CR9","doi-asserted-by":"crossref","first-page":"127","DOI":"10.1287\/opre.26.1.127","volume":"26","author":"SK Dhall","year":"1978","unstructured":"Dhall SK, Liu CL (1978) On a real-time scheduling problem. Oper Res 26(1):127\u2013140","journal-title":"Oper Res"},{"issue":"1","key":"9005_CR10","doi-asserted-by":"crossref","first-page":"46","DOI":"10.1145\/321738.321743","volume":"20","author":"CL Liu","year":"1973","unstructured":"Liu CL, Layland JW (1973) Scheduling algorithms for multiprogramming in a hard real-time environment. J ACM 20(1):46\u201361","journal-title":"J ACM"},{"key":"9005_CR11","doi-asserted-by":"crossref","unstructured":"Lundberg L (2002) Analyzing fixed-priority global multiprocessor scheduling. In: Proc seventh IEEE real-time technology and applications symposium, San Jose, USA, pp 145\u2013158","DOI":"10.1109\/RTTAS.2002.1137389"},{"key":"9005_CR12","doi-asserted-by":"crossref","unstructured":"Lundberg L, Lennerstad H (2003) Global multiprocessor scheduling of aperiodic tasks using time-independent priorities. In: Proc eight IEEE real-time technology and applications symposium, Toronto, Canada, pp 170\u2013180","DOI":"10.1109\/RTTAS.2003.1203049"}],"container-title":["Real-Time Systems"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11241-006-9005-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11241-006-9005-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11241-006-9005-y","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,1]],"date-time":"2019-06-01T11:09:50Z","timestamp":1559387390000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11241-006-9005-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2006,11,3]]},"references-count":12,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2006,12,11]]}},"alternative-id":["9005"],"URL":"https:\/\/doi.org\/10.1007\/s11241-006-9005-y","relation":{},"ISSN":["0922-6443","1573-1383"],"issn-type":[{"value":"0922-6443","type":"print"},{"value":"1573-1383","type":"electronic"}],"subject":[],"published":{"date-parts":[[2006,11,3]]}}}