{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,9,21]],"date-time":"2026-09-21T20:39:50Z","timestamp":1790023190412,"version":"4.0.1"},"reference-count":26,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2020,3,16]],"date-time":"2020-03-16T00:00:00Z","timestamp":1584316800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2020,3,16]],"date-time":"2020-03-16T00:00:00Z","timestamp":1584316800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100005357","name":"Agent\u00fara na Podporu V\u00fdskumu a V\u00fdvoja","doi-asserted-by":"publisher","award":["APVV-17-0549"],"award-info":[{"award-number":["APVV-17-0549"]}],"id":[{"id":"10.13039\/501100005357","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100006109","name":"Vedeck\u00e1 Grantov\u00e1 Agent\u00fara M\u0160VVa\u0160 SR a SAV","doi-asserted-by":"publisher","award":["1\/088\/17"],"award-info":[{"award-number":["1\/088\/17"]}],"id":[{"id":"10.13039\/501100006109","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Wireless Netw"],"published-print":{"date-parts":[[2022,2]]},"DOI":"10.1007\/s11276-020-02302-6","type":"journal-article","created":{"date-parts":[[2020,3,16]],"date-time":"2020-03-16T12:04:20Z","timestamp":1584360260000},"page":"855-862","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":37,"title":["Use of BIM technology and impact on productivity in construction project management"],"prefix":"10.1007","volume":"28","author":[{"given":"Peter","family":"Mes\u00e1ro\u0161","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Tom\u00e1\u0161","family":"Mandi\u010d\u00e1k","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Annam\u00e1ria","family":"Beh\u00fanov\u00e1","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2020,3,16]]},"reference":[{"key":"2302_CR1","doi-asserted-by":"crossref","unstructured":"Knap\u010d\u00edkov\u00e1, L., et al. (2018). Advanced materials based on the Recycled Polyvinyl Butyral (PVB). In MMS Conference 2017. EAI, Ghent (pp. 1\u20139).","DOI":"10.4108\/eai.22-11-2017.2273402"},{"issue":"9","key":"2302_CR2","first-page":"1716","volume":"95","author":"L Knap\u010d\u00edkov\u00e1","year":"2016","unstructured":"Knap\u010d\u00edkov\u00e1, L., et al. (2016). Material recycling of some automobile plastics waste. Przemysl Chemiczny, 95(9), 1716\u20131720.","journal-title":"Przemysl Chemiczny"},{"key":"2302_CR3","doi-asserted-by":"publisher","DOI":"10.1007\/s11276-019-02048-w","author":"P Mes\u00e1ro\u0161","year":"2019","unstructured":"Mes\u00e1ro\u0161, P., Beh\u00fanov\u00e1, A., Mandi\u010d\u00e1k, T., & Beh\u00fan, M. (2019). Impact of enterprise information systems on selected key performance indicators in construction project management\u2014an empirical study. Wireless Networks. https:\/\/doi.org\/10.1007\/s11276-019-02048-w.","journal-title":"Wireless Networks"},{"issue":"9","key":"2302_CR4","first-page":"1","volume":"23","author":"K Krajn\u00edkov\u00e1","year":"2019","unstructured":"Krajn\u00edkov\u00e1, K., Smetankov\u00e1, J., & Beh\u00fanov\u00e1, A. (2019). Green buildings and building information modelling. Stroj\u00e1rstvo Extra, 23(9), 1\u20136.","journal-title":"Stroj\u00e1rstvo Extra"},{"issue":"2","key":"2302_CR5","doi-asserted-by":"publisher","first-page":"1","DOI":"10.3390\/su11020400","volume":"11","author":"G Ko\u013evekov\u00e1","year":"2019","unstructured":"Ko\u013evekov\u00e1, G., et al. (2019). Regional tourism clustering based on the three Ps of the sustainability services marketing matrix: An example of central and eastern European countries. Sustainability, 11(2), 1\u201318.","journal-title":"Sustainability"},{"issue":"1","key":"2302_CR6","doi-asserted-by":"publisher","first-page":"23","DOI":"10.7441\/joc.2018.01.02","volume":"10","author":"M Beh\u00fan","year":"2018","unstructured":"Beh\u00fan, M., et al. (2018). The impact of the manufacturing industry on the economic cycle of European Union countries. Journal of Competitiveness, 10(1), 23\u201339.","journal-title":"Journal of Competitiveness"},{"key":"2302_CR7","doi-asserted-by":"publisher","first-page":"668","DOI":"10.1108\/ECAM-12-2015-0193","volume":"24","author":"FFA Ahmadian","year":"2017","unstructured":"Ahmadian, F. F. A., Rashidi, T. H., Akbarnezhad, A., & Waller, A. S. T. (2017). BIM-enabled sustainability assessment of material supply decisions. Engineering Constructustion Architect Management, 24, 668\u2013695. https:\/\/doi.org\/10.1108\/ECAM-12-2015-0193.","journal-title":"Engineering Constructustion Architect Management"},{"issue":"2","key":"2302_CR8","doi-asserted-by":"publisher","first-page":"126","DOI":"10.1016\/j.autcon.2010.09.010","volume":"20","author":"Y Jung","year":"2011","unstructured":"Jung, Y., & Joo, M. (2011). Building information modelling (BIM) framework for practical implementation. Automatization in Construction, 20(2), 126\u2013133. https:\/\/doi.org\/10.1016\/j.autcon.2010.09.010.","journal-title":"Automatization in Construction"},{"issue":"2","key":"2302_CR9","doi-asserted-by":"publisher","first-page":"271","DOI":"10.1016\/j.aei.2007.03.001","volume":"22","author":"R Howard","year":"2008","unstructured":"Howard, R., & Bj\u00f6rk, B. C. (2008). Building information modelling\u2014experts\u2019 views on standardization and industry deployment. Advanced Engineering Informatics, 22(2), 271\u2013280. https:\/\/doi.org\/10.1016\/j.aei.2007.03.001.","journal-title":"Advanced Engineering Informatics"},{"key":"2302_CR10","doi-asserted-by":"crossref","unstructured":"Karshenas, S., & Niknam, M. (2013). Ontology-based building information modeling. In 2013 ASCE international workshop on computing in civil engineering, IWCCE 2013, Los Angeles, CA (pp. 476\u2013483).","DOI":"10.1061\/9780784413029.060"},{"key":"2302_CR11","doi-asserted-by":"publisher","first-page":"139","DOI":"10.1016\/j.autcon.2016.08.019","volume":"71","author":"A Bradley","year":"2016","unstructured":"Bradley, A., Haijiang Li, H., Lark, R., & Dunn, S. (2016). BIM for infrastructure: An overall review and constructor perspective. Automatization in Constriction, 71, 139\u2013152.","journal-title":"Automatization in Constriction"},{"issue":"8","key":"2302_CR12","doi-asserted-by":"publisher","first-page":"1060","DOI":"10.3846\/13923730.2017.1374301","volume":"23","author":"TO Olawumi","year":"2017","unstructured":"Olawumi, T. O., Chan, D. W. M., & Wong, J. K. W. (2017). Evolution in the intellectual structure of BIM research: A bibliometric analysis. Journal of Civil Engineering and Management, 23(8), 1060\u20131081. https:\/\/doi.org\/10.3846\/13923730.2017.1374301.","journal-title":"Journal of Civil Engineering and Management"},{"key":"2302_CR13","unstructured":"Alsayyar, B., & Jrade, A. (2015). Integrating building information modeling (BIM) with sustainable universal design strategies to evaluate the costs and benefits of building projects. In Proceedings of the 5th international\/11th construction specialty conference (pp. 1\u201310)."},{"key":"2302_CR14","doi-asserted-by":"publisher","first-page":"60","DOI":"10.1016\/j.jobe.2018.06.017","volume":"20","author":"TO Olawumia","year":"2018","unstructured":"Olawumia, T. O., Chana, D. W. M., Wongb, J. K. W., & Chana, A. P. C. (2018). Barriers to the integration of BIM and sustainability practices in construction projects: A Delphi survey of international experts. Journal of Building Engineering, 20, 60\u201371.","journal-title":"Journal of Building Engineering"},{"key":"2302_CR15","doi-asserted-by":"publisher","first-page":"81","DOI":"10.1680\/stbu.12.00045","volume":"168","author":"N Gilkinson","year":"2015","unstructured":"Gilkinson, N., Raju, P., Kiviniemi, A., Chapman, C., Raju, P., & Chapman, C. (2015). Building information modelling: the tide is turning. Proceedings of the Institution of Civil Engineers-Structures and Buildings, 168, 81\u201393. https:\/\/doi.org\/10.1680\/stbu.12.00045.","journal-title":"Proceedings of the Institution of Civil Engineers-Structures and Buildings"},{"key":"2302_CR16","first-page":"54","volume":"9","author":"SO Olatunji","year":"2017","unstructured":"Olatunji, S. O., Olawumi, T. O., & Awodele, O. A. (2017). Achieving value for money (VFM) in construction projects. Journal of Civil and Environmental Research-International Institute for Science, Technology and Education (IISTE), 9, 54\u201364.","journal-title":"Journal of Civil and Environmental Research-International Institute for Science, Technology and Education (IISTE)"},{"key":"2302_CR17","doi-asserted-by":"publisher","first-page":"16","DOI":"10.1016\/j.scs.2018.03.033","volume":"40","author":"TO Olawumi","year":"2018","unstructured":"Olawumi, T. O., & Chan, D. W. M. (2018). Identifying and prioritizing the benefits of integrating BIM and sustainability practices in construction projects: A Delphi survey of international experts. Sustainable Cities and Society, 40, 16\u201327. https:\/\/doi.org\/10.1016\/j.scs.2018.03.033.","journal-title":"Sustainable Cities and Society"},{"issue":"5","key":"2302_CR18","first-page":"152","volume":"4","author":"K Shashank","year":"2014","unstructured":"Shashank, K., Hazra, Sutapa, & Nath Pal, K. (2014). Analysis of key factors affecting the variation of labour productivity in construction projects. International Journal of Emerging Technology and Advanced Engineering, 4(5), 152\u2013160.","journal-title":"International Journal of Emerging Technology and Advanced Engineering"},{"key":"2302_CR19","volume-title":"The performance prism: The scorecard for measuring and management business success","author":"A Neely","year":"2002","unstructured":"Neely, A., Adams, C., & Kenerley, M. (2002). The performance prism: The scorecard for measuring and management business success. London: Prentice-Hall."},{"key":"2302_CR20","unstructured":"Furneaux, C., et al. (2000). Australian Construction Industry KPIs. ResearchGate."},{"key":"2302_CR21","doi-asserted-by":"crossref","unstructured":"Sibiya, M., Aigbavboa, C., & Thwala, W. (2014). Construction projects\u2019 key performance indicators: A case of the South Africa construction industry.","DOI":"10.1061\/9780784479377.111"},{"key":"2302_CR22","unstructured":"Karslon, K. (2019). 12 Business metric that every company should know. Retrieved November 3, 2019, from https:\/\/www.scoro.com\/blog\/12-business-metrics."},{"key":"2302_CR23","unstructured":"Gerber, B. (2018). 12 Key financial performance indicators you should be tracking. Retrieved November 3, 2019, from https:\/\/www.accountingdepartment.com\/blog\/12-key-performance-indicators-you-should-be-tracking."},{"key":"2302_CR24","unstructured":"Wiliams, A. (2017). 11 Key business performance metrics for metrics better operations. Retrieved November 3, 2019, from https:\/\/alistemarketing.com\/blog\/business-performance-metrics."},{"key":"2302_CR25","unstructured":"Jackson, T. (2018). 18 Key performance indicator (KPI) examples defined. Retrieved November 3, 2019, from https:\/\/www.clearpointstrategy.com\/18-key-performance-indicators\/."},{"key":"2302_CR26","doi-asserted-by":"publisher","DOI":"10.1007\/s11165-016-9602-2","author":"K Taber","year":"2017","unstructured":"Taber, K. (2017). The use of Cronbach\u2019s alpha when developing and reporting research instruments in science. Education. https:\/\/doi.org\/10.1007\/s11165-016-9602-2.","journal-title":"Education"}],"container-title":["Wireless Networks"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s11276-020-02302-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s11276-020-02302-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s11276-020-02302-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,2,18]],"date-time":"2022-02-18T06:08:33Z","timestamp":1645164513000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s11276-020-02302-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,3,16]]},"references-count":26,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2022,2]]}},"alternative-id":["2302"],"URL":"https:\/\/doi.org\/10.1007\/s11276-020-02302-6","relation":{},"ISSN":["1022-0038","1572-8196"],"issn-type":[{"value":"1022-0038","type":"print"},{"value":"1572-8196","type":"electronic"}],"subject":[],"published":{"date-parts":[[2020,3,16]]},"assertion":[{"value":"16 March 2020","order":1,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}