{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,25]],"date-time":"2026-02-25T23:52:58Z","timestamp":1772063578638,"version":"3.50.1"},"reference-count":33,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2018,2,10]],"date-time":"2018-02-10T00:00:00Z","timestamp":1518220800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["71671026"],"award-info":[{"award-number":["71671026"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Wireless Pers Commun"],"published-print":{"date-parts":[[2018,11]]},"DOI":"10.1007\/s11277-018-5486-y","type":"journal-article","created":{"date-parts":[[2018,2,10]],"date-time":"2018-02-10T03:49:41Z","timestamp":1518234581000},"page":"897-920","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":4,"title":["Performance Prediction and Evaluation Based on the Variability Theory in Production Lines Using ARENA Simulation"],"prefix":"10.1007","volume":"103","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-1082-2732","authenticated-orcid":false,"given":"Changjun","family":"Li","sequence":"first","affiliation":[]},{"given":"Jingye","family":"Liu","sequence":"additional","affiliation":[]},{"given":"Bo","family":"Li","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2018,2,10]]},"reference":[{"issue":"18","key":"5486_CR1","doi-asserted-by":"publisher","first-page":"4815","DOI":"10.1080\/0020754021000024148","volume":"40","author":"W Abdul-Kader","year":"2002","unstructured":"Abdul-Kader, W., & Gharbi, A. (2002). Capacity estimation of a multi-product unreliable production line. International Journal of Production Research, 40(18), 4815\u20134834.","journal-title":"International Journal of Production Research"},{"key":"5486_CR2","volume-title":"Simulation modeling and analysis with Arena","author":"BM Tayfur Altiok","year":"2007","unstructured":"Tayfur Altiok, B. M. (2007). Simulation modeling and analysis with Arena. Burlington: Elsevier."},{"issue":"13","key":"5486_CR3","doi-asserted-by":"publisher","first-page":"3619","DOI":"10.1016\/j.apm.2014.11.059","volume":"39","author":"F Jarrahi","year":"2015","unstructured":"Jarrahi, F., & Abdul-Kader, W. (2015). Performance evaluation of a multi-product production line: An approximation method. Applied Mathematical Modelling, 39(13), 3619\u20133636.","journal-title":"Applied Mathematical Modelling"},{"issue":"3","key":"5486_CR4","doi-asserted-by":"publisher","first-page":"205","DOI":"10.1080\/095119298130732","volume":"11","author":"DD Almeida","year":"1998","unstructured":"Almeida, D. D., Gourgand, M., & Kellert, P. (1998). Performance evaluation of a job-shop-like flexible manufacturing system with transfer blocking using a Markovian queuing network model. International Journal of Computer Integrated Manufacturing, 11(3), 205\u2013216.","journal-title":"International Journal of Computer Integrated Manufacturing"},{"issue":"2","key":"5486_CR5","doi-asserted-by":"publisher","first-page":"103","DOI":"10.3138\/infor.48.2.103","volume":"48","author":"A Aziz","year":"2010","unstructured":"Aziz, A., Jarrahi, F., & Abdul-Kader, W. (2010). Modeling and performance evaluation of a series-parallel flow line system with finite buffers. Information Systems and Operational Research, 48(2), 103\u2013120.","journal-title":"Information Systems and Operational Research"},{"issue":"20","key":"5486_CR6","doi-asserted-by":"publisher","first-page":"6251","DOI":"10.1080\/00207543.2015.1092613","volume":"54","author":"JA Schwarz","year":"2015","unstructured":"Schwarz, J. A., & Epp, M. (2015). Performance evaluation of a transportation-type bulk queue with generally distributed inter-arrival times. International Journal of Production Research, 54(20), 6251\u20136264.","journal-title":"International Journal of Production Research"},{"key":"5486_CR7","doi-asserted-by":"publisher","first-page":"138","DOI":"10.1016\/j.cie.2016.02.006","volume":"94","author":"H Lee","year":"2016","unstructured":"Lee, H., & Seo, D.-W. (2016). Performance evaluation of WIP-controlled line production systems with constant processing times. Computers & Industrial Engineering, 94, 138\u2013146.","journal-title":"Computers & Industrial Engineering"},{"issue":"4","key":"5486_CR8","doi-asserted-by":"publisher","first-page":"513","DOI":"10.1109\/TASE.2007.906348","volume":"4","author":"JG Shanthikumar","year":"2007","unstructured":"Shanthikumar, J. G., Ding, S., & Zhang, M. T. (2007). Queueing theory for semiconductor manufacturing systems: A survey and open problems. IEEE Transactions on Automation Science and Engineering, 4(4), 513\u2013522.","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"issue":"19","key":"5486_CR9","doi-asserted-by":"publisher","first-page":"5761","DOI":"10.1080\/00207543.2016.1177236","volume":"54","author":"P Mehmet","year":"2016","unstructured":"Mehmet, P., Mustafa, Y., & Bilal, T. (2016). Variability modelling and balancing of stochastic assembly lines. International Journal of Production Research, 54(19), 5761\u20135782.","journal-title":"International Journal of Production Research"},{"issue":"1\u20134","key":"5486_CR10","first-page":"371","volume":"62","author":"M Amiri","year":"2011","unstructured":"Amiri, M., & Mohtashami, A. (2011). Buffer allocation in unreliable production lines based on design of experiments, simulation, and genetic algorithm. International Journal of Advanced Manufacturing Technology, 62(1\u20134), 371\u2013383.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"5486_CR11","doi-asserted-by":"publisher","first-page":"364","DOI":"10.1016\/j.cie.2016.04.014","volume":"99","author":"K Wu","year":"2016","unstructured":"Wu, K., Zhou, Y., & Zhao, N. (2016). Variability and the fundamental properties of production lines. Computers & Industrial Engineering, 99, 364\u2013371.","journal-title":"Computers & Industrial Engineering"},{"issue":"11","key":"5486_CR12","doi-asserted-by":"publisher","first-page":"3125","DOI":"10.1080\/00207543.2013.854935","volume":"52","author":"JM Smith","year":"2013","unstructured":"Smith, J. M. (2013). System capacity and performance modelling of finite buffer queueing networks. International Journal of Production Research, 52(11), 3125\u20133163.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"5486_CR13","doi-asserted-by":"publisher","first-page":"74","DOI":"10.1016\/j.ejor.2012.03.013","volume":"221","author":"P Damodaran","year":"2012","unstructured":"Damodaran, P., & Hulett, M. (2012). Analytical approximations to predict performance measures of manufacturing systems with general distributions, job failures and parallel processing. European Journal of Operational Research, 221(1), 74\u201386.","journal-title":"European Journal of Operational Research"},{"issue":"6","key":"5486_CR14","doi-asserted-by":"publisher","first-page":"4059","DOI":"10.3233\/JIFS-152509","volume":"32","author":"K Ghafour","year":"2017","unstructured":"Ghafour, K., Ramli, R., & Zaibidi, N. Z. (2017). Developing a M\/G\/C-FCFS queueing model with continuous review (R, Q) inventory system policy in a cement industry. Journal of Intelligent & Fuzzy Systems, 32(6), 4059\u20134068.","journal-title":"Journal of Intelligent & Fuzzy Systems"},{"issue":"11","key":"5486_CR15","doi-asserted-by":"publisher","first-page":"1193","DOI":"10.1016\/j.ress.2010.05.002","volume":"95","author":"AT Belmansour","year":"2008","unstructured":"Belmansour, A. T., & Nourelfath, M. (2008). An aggregation method for performance evaluation of a tandem homogenous production line with machines having multiple failure modes. Reliability Engineering & System Safety, 95(11), 1193\u20131201.","journal-title":"Reliability Engineering & System Safety"},{"issue":"9\u201310","key":"5486_CR16","doi-asserted-by":"publisher","first-page":"969","DOI":"10.1007\/s00170-005-2583-3","volume":"29","author":"L Cauffriez","year":"2006","unstructured":"Cauffriez, L., & Willaeys, D. (2006). A predictive model for improving production line performance. International Journal of Advanced Manufacturing Technology, 29(9\u201310), 969\u2013979.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"6","key":"5486_CR17","doi-asserted-by":"publisher","first-page":"1922","DOI":"10.1080\/00207543.2012.720726","volume":"51","author":"T McNamara","year":"2013","unstructured":"McNamara, T., Shaaban, S., & Hudson, S. (2013). Simulation of unbalanced buffer allocation in unreliable unpaced production lines. International Journal of Production Research, 51(6), 1922\u20131936.","journal-title":"International Journal of Production Research"},{"issue":"6","key":"5486_CR18","doi-asserted-by":"publisher","first-page":"1885","DOI":"10.1080\/00207543.2012.720389","volume":"51","author":"SS Padhi","year":"2013","unstructured":"Padhi, S. S., Wagner, S. M., Niranjan, T. T., & Aggarwal, V. (2013). A simulation-based methodology to analyse production line disruptions. International Journal of Production Research, 51(6), 1885\u20131897.","journal-title":"International Journal of Production Research"},{"issue":"24","key":"5486_CR19","doi-asserted-by":"publisher","first-page":"5667","DOI":"10.1080\/00207540600920868","volume":"45","author":"P Lavoie","year":"2007","unstructured":"Lavoie, P., Kenn\u00e9, J. P., & Gharbi, A. (2007). Production control and combined discrete\/continuous simulation modeling in failure-prone transfer lines. International Journal of Production Research, 45(24), 5667\u20135685.","journal-title":"International Journal of Production Research"},{"issue":"18","key":"5486_CR20","doi-asserted-by":"publisher","first-page":"5013","DOI":"10.1080\/00207540701222768","volume":"46","author":"X Zhang","year":"2008","unstructured":"Zhang, X., Schmidt, L., Schlick, C. M., Reuth, R., & Luczak, H. (2008). A human task-oriented simulation study in autonomous production cells. International Journal of Production Research, 46(18), 5013\u20135041.","journal-title":"International Journal of Production Research"},{"issue":"2\/3","key":"5486_CR21","doi-asserted-by":"publisher","first-page":"118","DOI":"10.1504\/IJEG.2009.029125","volume":"2","author":"SS Padhi","year":"2009","unstructured":"Padhi, S. S., & Mohapatra, P. K. J. (2009). Process evaluation of award of work contracts in a government department. International Journal of Electronic Governance, 2(2\/3), 118\u2013130.","journal-title":"International Journal of Electronic Governance"},{"issue":"12","key":"5486_CR22","doi-asserted-by":"publisher","first-page":"1329","DOI":"10.1080\/0740817X.2015.1055389","volume":"47","author":"K Wu","year":"2015","unstructured":"Wu, K., & Zhao, N. (2015). Analysis of dual tandem queues with a finite buffer capacity and non-overlapping service times and subject to breakdowns. IIE Transactions, 47(12), 1329\u20131341.","journal-title":"IIE Transactions"},{"issue":"1","key":"5486_CR23","doi-asserted-by":"publisher","first-page":"31","DOI":"10.3166\/jds.12.31-46","volume":"12","author":"W Abdul-Kader","year":"2003","unstructured":"Abdul-Kader, W. (2003). Simulation of an unreliable production line. Journal of Decision Systems, 12(1), 31\u201346.","journal-title":"Journal of Decision Systems"},{"issue":"24","key":"5486_CR24","doi-asserted-by":"publisher","first-page":"7256","DOI":"10.1080\/00207543.2011.645081","volume":"50","author":"CE Betterton","year":"2012","unstructured":"Betterton, C. E., & Cox Iii, J. F. (2012). Production rate of synchronous transfer lines using Monte Carlo simulation. International Journal of Production Research, 50(24), 7256\u20137270.","journal-title":"International Journal of Production Research"},{"issue":"1\u20132","key":"5486_CR25","doi-asserted-by":"publisher","first-page":"87","DOI":"10.1016\/S1569-190X(02)00063-1","volume":"10","author":"S-J Hsieh","year":"2002","unstructured":"Hsieh, S.-J. (2002). Hybrid analytic and simulation models for assembly line design and production planning. Simulation Modelling Practice and Theory, 10(1\u20132), 87\u2013108.","journal-title":"Simulation Modelling Practice and Theory"},{"issue":"2","key":"5486_CR26","doi-asserted-by":"publisher","first-page":"517","DOI":"10.1016\/j.ejor.2016.03.050","volume":"254","author":"BS Onggo","year":"2016","unstructured":"Onggo, B. S., & Karatas, M. (2016). Test-driven simulation modelling: A case study using agent-based maritime search-operation simulation. European Journal of Operational Research, 254(2), 517\u2013531.","journal-title":"European Journal of Operational Research"},{"key":"5486_CR27","doi-asserted-by":"publisher","first-page":"12","DOI":"10.1016\/j.simpat.2013.08.003","volume":"40","author":"T Kim","year":"2014","unstructured":"Kim, T., & Choi, B. K. (2014). Production system-based simulation for backward on-line job change scheduling. Simulation Modelling Practice and Theory, 40, 12\u201327.","journal-title":"Simulation Modelling Practice and Theory"},{"issue":"3","key":"5486_CR28","doi-asserted-by":"publisher","first-page":"209","DOI":"10.1080\/07408170802375760","volume":"41","author":"J Kenn\u00e9","year":"2009","unstructured":"Kenn\u00e9, J. (2009). Optimization of production control policies in failure-prone homogenous transfer lines. IIE Transactions, 41(3), 209\u2013222.","journal-title":"IIE Transactions"},{"key":"5486_CR29","doi-asserted-by":"publisher","first-page":"744","DOI":"10.4028\/www.scientific.net\/AMR.933.744","volume":"933","author":"SM Zahraee","year":"2014","unstructured":"Zahraee, S. M., Haghighi, M., Afshar, J., Golroudbary, S. R., & Hashemi, A. (2014). Simulation of manufacturing production line based on Arena. Advanced Materials Research, 933, 744\u2013748.","journal-title":"Advanced Materials Research"},{"key":"5486_CR30","doi-asserted-by":"publisher","first-page":"3","DOI":"10.5267\/j.ijiec.2011.08.011","volume":"3","author":"T McDonald","year":"2012","unstructured":"McDonald, T., Aken, E. V., & Elli, K. (2012). Utilizing simulation to evaluate production line performance under varying demand conditions. International Journal of Industrial Engineering Computations, 3, 3\u201314.","journal-title":"International Journal of Industrial Engineering Computations"},{"key":"5486_CR31","doi-asserted-by":"publisher","first-page":"167","DOI":"10.1016\/j.simpat.2014.09.006","volume":"49","author":"M Kamrani","year":"2014","unstructured":"Kamrani, M., Hashemi Esmaeil Abadi, S. M., & Rahimpour Golroudbary, S. (2014). Traffic simulation of two adjacent unsignalized T-junctions during rush hours using Arena software. Simulation Modelling Practice and Theory, 49, 167\u2013179.","journal-title":"Simulation Modelling Practice and Theory"},{"key":"5486_CR32","volume-title":"Factory physics: Foundations of manufacturing management","author":"WJ Hopp","year":"2002","unstructured":"Hopp, W. J., & Spearman, M. L. (2002). Factory physics: Foundations of manufacturing management (2nd ed.). Peking: Tsinghua Press.","edition":"2"},{"key":"5486_CR33","doi-asserted-by":"publisher","first-page":"65","DOI":"10.3141\/1831-08","volume":"1831","author":"T Toledo","year":"2003","unstructured":"Toledo, T., Koutsopoulos, H. N., Davol, A., Ben-Akiva, M. E., Burghout, W., Andr\u00e9asson, I., et al. (2003). Calibration and validation of microscopic traffic simulation tools: Stockholm case study. Transportation Research Record: Journal of the Transportation Research Board, 1831, 65\u201375.","journal-title":"Transportation Research Record: Journal of the Transportation Research Board"}],"container-title":["Wireless Personal Communications"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11277-018-5486-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11277-018-5486-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11277-018-5486-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,2,9]],"date-time":"2019-02-09T19:52:08Z","timestamp":1549741928000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11277-018-5486-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,2,10]]},"references-count":33,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2018,11]]}},"alternative-id":["5486"],"URL":"https:\/\/doi.org\/10.1007\/s11277-018-5486-y","relation":{},"ISSN":["0929-6212","1572-834X"],"issn-type":[{"value":"0929-6212","type":"print"},{"value":"1572-834X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,2,10]]},"assertion":[{"value":"10 February 2018","order":1,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}