{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,3,30]],"date-time":"2022-03-30T13:35:57Z","timestamp":1648647357143},"reference-count":3,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2007,12,1]],"date-time":"2007-12-01T00:00:00Z","timestamp":1196467200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Jrl Syst Sci &amp; Complex"],"published-print":{"date-parts":[[2007,12]]},"DOI":"10.1007\/s11424-007-9057-7","type":"journal-article","created":{"date-parts":[[2007,11,5]],"date-time":"2007-11-05T08:25:09Z","timestamp":1194251109000},"page":"592-600","source":"Crossref","is-referenced-by-count":1,"title":["Approximation Schemes for Scheduling a Batching Machine with Nonidentical Job Size"],"prefix":"10.1007","volume":"20","author":[{"given":"Xianzhao","family":"Zhang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yuzhong","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Zhigang","family":"Cao","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Zengxia","family":"Cai","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"9057_CR1","doi-asserted-by":"crossref","first-page":"1615","DOI":"10.1080\/00207549408957026","volume":"32","author":"R. Uzsoy","year":"1994","unstructured":"R. Uzsoy, A single batch processing machine with nonidentical job sizes, Int. J. Prod. Res, 1994, 32: 1615\u20131635.","journal-title":"Int. J. Prod. Res"},{"key":"9057_CR2","doi-asserted-by":"crossref","first-page":"226","DOI":"10.1002\/nav.4","volume":"48","author":"G. Zhang","year":"2001","unstructured":"G. Zhang, X. Cai, C. Lee, and C. K. Wong, Minimizing makespan on a single batch processing machine with nonidentical job sizes, Naval Res. Log , 2001, 48: 226\u2013240.","journal-title":"Naval Res. Log"},{"key":"9057_CR3","unstructured":"Y. Shi and G. Zhang, On-line batch scheduling with nonidentical job sizes, Proceedings of the Seventh National Conference of Operations Research of China, 2004, 329\u2013334."}],"container-title":["Journal of Systems Science and Complexity"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11424-007-9057-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11424-007-9057-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11424-007-9057-7","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,1]],"date-time":"2019-06-01T10:53:56Z","timestamp":1559386436000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11424-007-9057-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007,12]]},"references-count":3,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2007,12]]}},"alternative-id":["9057"],"URL":"https:\/\/doi.org\/10.1007\/s11424-007-9057-7","relation":{},"ISSN":["1009-6124","1559-7067"],"issn-type":[{"value":"1009-6124","type":"print"},{"value":"1559-7067","type":"electronic"}],"subject":[],"published":{"date-parts":[[2007,12]]}}}