{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,1,24]],"date-time":"2024-01-24T14:58:59Z","timestamp":1706108339275},"reference-count":18,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2015,8,29]],"date-time":"2015-08-29T00:00:00Z","timestamp":1440806400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Syst Sci Complex"],"published-print":{"date-parts":[[2016,4]]},"DOI":"10.1007\/s11424-015-3330-y","type":"journal-article","created":{"date-parts":[[2015,8,29]],"date-time":"2015-08-29T11:41:24Z","timestamp":1440848484000},"page":"478-498","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["Batching Scheduling in a Two-Level Supply Chain with Earliness and Tardiness Penalties"],"prefix":"10.1007","volume":"29","author":[{"given":"Qi","family":"Wei","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Liying","family":"Kang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Erfang","family":"Shan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2015,8,29]]},"reference":[{"key":"3330_CR1","doi-asserted-by":"crossref","first-page":"99","DOI":"10.1016\/0167-6377(85)90011-2","volume":"4","author":"C A Santos","year":"1985","unstructured":"Santos C A and Magazine M J, Batching in single operation manufacturing systems, Operations Research Letters, 1985, 4: 99\u2013103.","journal-title":"Operations Research Letters"},{"key":"3330_CR2","doi-asserted-by":"crossref","first-page":"985","DOI":"10.1016\/j.ejor.2006.06.060","volume":"187","author":"A Allahverdi","year":"2008","unstructured":"Allahverdi A, Ng C T, Cheng T C E, and Kovalyov M Y, A survey of scheduling problems with setup times or costs, European Journal of Operational Research, 2008, 187: 985\u20131032.","journal-title":"European Journal of Operational Research"},{"key":"3330_CR3","doi-asserted-by":"crossref","first-page":"228","DOI":"10.1016\/S0377-2217(99)00153-8","volume":"120","author":"C N Potts","year":"2000","unstructured":"Potts C N and Kovalyov M Y, Scheduling with batching: A review, European Journal of Operational Research, 2000, 120: 228\u2013249.","journal-title":"European Journal of Operational Research"},{"key":"3330_CR4","doi-asserted-by":"crossref","first-page":"333","DOI":"10.1016\/S0360-8352(96)00300-2","volume":"32","author":"C S Sung","year":"1997","unstructured":"Sung C S and Joo U G, Batching to minimize weighted mean flow time on a single machine with size restrictions, Computers and Industrial Engineering, 1997, 32: 333\u2013340.","journal-title":"Computers and Industrial Engineering"},{"key":"3330_CR5","first-page":"413","volume":"33","author":"T C E Cheng","year":"2001","unstructured":"Cheng T C E and Kovalyov M Y, Single machine batch scheduling with sequential processing, IIE Transactions, 2001, 33: 413\u2013420.","journal-title":"IIE Transactions"},{"key":"3330_CR6","doi-asserted-by":"crossref","first-page":"566","DOI":"10.1287\/opre.51.4.566.16106","volume":"51","author":"N G Hall","year":"2003","unstructured":"Hall N G and Potts C N, Supply chain scheduling: Batching and delivery, Operations Research, 2003, 51: 566\u2013584.","journal-title":"Operations Research"},{"key":"3330_CR7","doi-asserted-by":"crossref","first-page":"226","DOI":"10.1016\/j.ejor.2004.12.007","volume":"173","author":"E Selvarajah","year":"2006","unstructured":"Selvarajah E and Steiner G, Batch scheduling in a two-level supply chain\u2013a focus on the supplier, European Journal of Operational Research, 2006, 173: 226\u2013240.","journal-title":"European Journal of Operational Research"},{"key":"3330_CR8","doi-asserted-by":"crossref","first-page":"953","DOI":"10.1016\/j.ijpe.2011.11.011","volume":"135","author":"M Yasaman","year":"2012","unstructured":"Yasaman M and Rasaratnam L, Non-permutation flowshop scheduling in a supply chain with sequence-dependent setup times, International Journal of Production Economics, 2012, 135: 953\u2013963.","journal-title":"International Journal of Production Economics"},{"key":"3330_CR9","doi-asserted-by":"crossref","first-page":"201","DOI":"10.1007\/s10951-010-0189-6","volume":"15","author":"D Ivanov","year":"2012","unstructured":"Ivanov D and Sokolov B, Dynamic supply chain scheduling, Journal of Scheduling, 2012, 15: 201\u2013216.","journal-title":"Journal of Scheduling"},{"issue":"3","key":"3330_CR10","doi-asserted-by":"crossref","first-page":"897","DOI":"10.1080\/00207543.2012.677071","volume":"51","author":"C Low","year":"2012","unstructured":"Low C, Li R K, and Chang C M, Integrated scheduling of production and delivery with time windows, International Journal of Production Research, 2012, 51(3): 897\u2013909.","journal-title":"International Journal of Production Research"},{"key":"3330_CR11","doi-asserted-by":"crossref","first-page":"743","DOI":"10.1016\/j.ejor.2007.12.033","volume":"194","author":"X Wang","year":"2009","unstructured":"Wang X and Cheng T C E, Production scheduling with supply and delivery considerations to minimize the makespan, European Journal of Operational Research, 2009, 194: 743\u2013752.","journal-title":"European Journal of Operational Research"},{"key":"3330_CR12","doi-asserted-by":"crossref","first-page":"266","DOI":"10.1016\/j.ijpe.2009.05.007","volume":"121","author":"X Wang","year":"2009","unstructured":"Wang X and Cheng T C E, Logistics scheduling to minimize inventory and transport costs, International Journal of Production Economics, 2009, 121: 266\u2013273.","journal-title":"International Journal of Production Economics"},{"key":"3330_CR13","doi-asserted-by":"crossref","first-page":"22","DOI":"10.1287\/opre.38.1.22","volume":"38","author":"K R Baker","year":"1990","unstructured":"Baker K R and Scudder G D, Sequencing with earliness and tardiness penalties: A review, Operations Research, 1990, 38: 22\u201336.","journal-title":"Operations Research"},{"key":"3330_CR14","doi-asserted-by":"crossref","first-page":"253","DOI":"10.1007\/BF01471113","volume":"2","author":"M Laguna","year":"1991","unstructured":"Laguna M and Velatde J L G, A search heuristic for just-in-time scheduling in parallel machines, Journal of Intelligent Manufacturing, 1991, 2: 253\u2013260.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"3330_CR15","doi-asserted-by":"crossref","first-page":"220","DOI":"10.1016\/S0377-2217(98)00136-2","volume":"116","author":"Z L Chen","year":"1999","unstructured":"Chen Z L and Powell W B, A column generation based decomposition algorithm for a parallel machine just-in-time scheduling problem, European Journal of Operational Research, 1999, 116: 220\u2013232.","journal-title":"European Journal of Operational Research"},{"key":"3330_CR16","doi-asserted-by":"crossref","first-page":"685","DOI":"10.1057\/jors.1994.106","volume":"45","author":"T C E Cheng","year":"1994","unstructured":"Cheng T C E and Chen Z L, Parallel-machine scheduling problems with earliness and tardiness penalties, The Journal of the Operational Research Society, 1994, 45: 685\u2013695.","journal-title":"The Journal of the Operational Research Society"},{"key":"3330_CR17","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1002\/1520-6750(199402)41:1<17::AID-NAV3220410103>3.0.CO;2-X","volume":"41","author":"P De","year":"1994","unstructured":"De P, Ghosh J B, and Wells C E, Due-date assignment and early\/tardy scheduling on identical parallel machines, Naval Research Logistics, 1994, 41: 17\u201332.","journal-title":"Naval Research Logistics"},{"key":"3330_CR18","doi-asserted-by":"crossref","first-page":"541","DOI":"10.1007\/s10951-011-0229-x","volume":"14","author":"P Chr\u00e9tienne","year":"2011","unstructured":"Chr\u00e9tienne P, Hazir \u00d6, and Kedad-Sidhoum S, Integrated batch sizing and scheduling on a single machine, Journal of Scheduling, 2011, 14: 541\u2013555.","journal-title":"Journal of Scheduling"}],"container-title":["Journal of Systems Science and Complexity"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11424-015-3330-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11424-015-3330-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11424-015-3330-y","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,1]],"date-time":"2019-06-01T10:54:09Z","timestamp":1559386449000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11424-015-3330-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,8,29]]},"references-count":18,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2016,4]]}},"alternative-id":["3330"],"URL":"https:\/\/doi.org\/10.1007\/s11424-015-3330-y","relation":{},"ISSN":["1009-6124","1559-7067"],"issn-type":[{"value":"1009-6124","type":"print"},{"value":"1559-7067","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,8,29]]}}}