{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,8,9]],"date-time":"2024-08-09T19:52:55Z","timestamp":1723233175863},"reference-count":40,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2016,5,14]],"date-time":"2016-05-14T00:00:00Z","timestamp":1463184000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Optim Lett"],"published-print":{"date-parts":[[2017,4]]},"DOI":"10.1007\/s11590-016-1041-5","type":"journal-article","created":{"date-parts":[[2016,5,14]],"date-time":"2016-05-14T17:53:33Z","timestamp":1463248413000},"page":"725-738","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":14,"title":["A new constraint programming approach for optimising a coal rail system"],"prefix":"10.1007","volume":"11","author":[{"given":"Mahmoud","family":"Masoud","sequence":"first","affiliation":[]},{"given":"Erhan","family":"Kozan","sequence":"additional","affiliation":[]},{"given":"Geoff","family":"Kent","sequence":"additional","affiliation":[]},{"given":"Shi Qiang","family":"Liu","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2016,5,14]]},"reference":[{"key":"1041_CR1","unstructured":"Abdekhodaee, A., Dunstall, S., Ernst, A.T., Lam, L.: Long term capacity planning at hunter valley coal chain: models and algorithms. In: The Fifth Asia Pacific Industrial Engineering and Management Systems Conference, Gold Coast (2004)"},{"key":"1041_CR2","doi-asserted-by":"crossref","first-page":"744","DOI":"10.1016\/j.engappai.2008.03.008","volume":"21","author":"M Abril","year":"2008","unstructured":"Abril, M., Salido, M.A., Barber, F.: Distributed search in railway scheduling problems. Eng. Appl. Artif. Intell. 21, 744\u2013755 (2008)","journal-title":"Eng. Appl. Artif. Intell."},{"key":"1041_CR3","doi-asserted-by":"crossref","unstructured":"Albrecht, A., Panton, D.M., Lee, D.H.: Rescheduling rail networks with maintenance disruptions using problem space search. Comput. Oper. Res. 40(3), 703\u2013712 (2013)","DOI":"10.1016\/j.cor.2010.09.001"},{"issue":"1","key":"1041_CR4","doi-asserted-by":"crossref","first-page":"173","DOI":"10.1007\/s10479-014-1619-1","volume":"223","author":"F Anthony","year":"2014","unstructured":"Anthony, F., Elvis, C.H.: A constraint programming-based approach to the crew scheduling problem of the Taipei mass rapid transit system. Ann. Oper. Res. 223(1), 173\u2013193 (2014)","journal-title":"Ann. Oper. Res."},{"key":"1041_CR5","unstructured":"Australian Government.: Office of the Chief Economists: Resources and energy quarterly Commonw Australia 4(2), 1\u201371 (2014)"},{"key":"1041_CR6","doi-asserted-by":"crossref","first-page":"12","DOI":"10.1016\/j.conengprac.2014.10.008","volume":"35","author":"C Bersani","year":"2015","unstructured":"Bersani, C., Qiu, S., Sacile, R., Sallak, M., Sch\u00f6n, W.: Rapid, robust, distributed evaluation and control of train scheduling on a single line track. Control Eng. Pract. 35, 12\u201321 (2015)","journal-title":"Control Eng. Pract."},{"key":"1041_CR7","doi-asserted-by":"crossref","first-page":"150","DOI":"10.1016\/j.cor.2013.08.011","volume":"41","author":"RL Burdett","year":"2014","unstructured":"Burdett, R.L., Kozan, E.: Determining operations affected by delay in predictive train timetables. Comput. Oper. Res. 41, 150\u2013166 (2014)","journal-title":"Comput. Oper. Res."},{"key":"1041_CR8","doi-asserted-by":"crossref","unstructured":"Cacchiani, V., Caprara, A., Toth, P.: A column generation approach to train timetabling on a corridor. Q. J. Oper. Res. 6, 125\u2013142 (2008)","DOI":"10.1007\/s10288-007-0037-5"},{"key":"1041_CR9","doi-asserted-by":"crossref","first-page":"175","DOI":"10.1016\/j.trb.2009.05.004","volume":"44","author":"F Corman","year":"2010","unstructured":"Corman, F., D\u2019Ariano, A., Pacciarelli, D., Pranzo, M.: A tabu search algorithm for rerouting trains during rail operations. Transp. Res. Part B 44, 175\u2013192 (2010)","journal-title":"Transp. Res. Part B"},{"key":"1041_CR10","doi-asserted-by":"crossref","first-page":"643","DOI":"10.1016\/j.ejor.2006.10.034","volume":"183","author":"A D\u2019Ariano","year":"2007","unstructured":"D\u2019Ariano, A., Pacciarelli, D., Pranzo, M.: A branch and bound algorithm for scheduling trains in a railway network. Eur. J. Oper. Res. 183, 643\u2013657 (2007)","journal-title":"Eur. J. Oper. Res."},{"key":"1041_CR11","doi-asserted-by":"crossref","first-page":"232","DOI":"10.1016\/j.trc.2007.07.006","volume":"16","author":"A D\u2019Ariano","year":"2008","unstructured":"D\u2019Ariano, A., Pacciarelli, D., Pranzo, M.: Assessment of flexible timetables in real-time traffic management of a railway bottleneck. Transp. Res. Part C 16, 232\u2013245 (2008)","journal-title":"Transp. Res. Part C"},{"key":"1041_CR12","doi-asserted-by":"crossref","first-page":"321","DOI":"10.1287\/trsc.1090.0264","volume":"43","author":"M Fischetti","year":"2009","unstructured":"Fischetti, M., Salvagnin, D.S., Zanette, A.: Fast approaches to improve the robustness of a railway timetable. Transp. Sci. 43, 321\u2013335 (2009)","journal-title":"Transp. Sci."},{"key":"1041_CR13","first-page":"19","volume":"2","author":"O Gholami","year":"2013","unstructured":"Gholami, O., Sotskov, Y.N., Werner, F.: Fast edge-orientation heuristics for job-shop scheduling problems with applications to train scheduling. Int. J. Oper. Res. 2, 19\u201332 (2013)","journal-title":"Int. J. Oper. Res."},{"issue":"1","key":"1041_CR14","doi-asserted-by":"crossref","first-page":"92","DOI":"10.1016\/S0377-2217(03)00101-2","volume":"153","author":"M Henz","year":"2004","unstructured":"Henz, M., M\u00fcller, T., Thiel, S.: Global constraints for round-robin tournament scheduling. Eur. J. Oper. Res. 153(1), 92\u2013101 (2004)","journal-title":"Eur. J. Oper. Res."},{"key":"1041_CR15","doi-asserted-by":"crossref","first-page":"170","DOI":"10.1016\/j.tcs.2006.12.022","volume":"374","author":"JH Her","year":"2007","unstructured":"Her, J.H., Ramakrishna, R.S.: An external-memory depth-first search algorithm for general grid graphs. Theor. Comput. Sci. 374, 170\u2013180 (2007)","journal-title":"Theor. Comput. Sci."},{"key":"1041_CR16","doi-asserted-by":"crossref","first-page":"109","DOI":"10.1016\/j.ins.2012.10.024","volume":"224","author":"A Janiak","year":"2013","unstructured":"Janiak, A., Kovalyov, Y., Kozan, E., Pesch, E.: Parallel machine scheduling and common due window assignment with job independent earliness and tardiness costs. Inf. Sci. 224, 109\u2013117 (2013)","journal-title":"Inf. Sci."},{"key":"1041_CR17","doi-asserted-by":"crossref","unstructured":"Ke, B.R., Lin, C.L., Chien, H.H., Chiu, H.W., Chen, N.: A new approach for improving the performance of freight train timetabling of a single-track railway system. Transp. Plan. Technol. 38(2), 238\u2013264 (2015)","DOI":"10.1080\/03081060.2014.959357"},{"key":"1041_CR18","doi-asserted-by":"crossref","first-page":"163","DOI":"10.1007\/s10601-014-9158-6","volume":"19","author":"T Kelsey","year":"2014","unstructured":"Kelsey, T., Kotthoff, L., Jefferson, C., Linton, S., Miguel, I., Nightingale, P., Gent, I.: Qualitative modelling via constraint programming. Constraints 19, 163\u2013173 (2014)","journal-title":"Constraints"},{"issue":"1","key":"1041_CR19","doi-asserted-by":"crossref","first-page":"665","DOI":"10.1016\/j.dss.2012.08.012","volume":"54","author":"E Kozan","year":"2012","unstructured":"Kozan, E., Liu, S.Q.: A demand-responsive decision support system for coal transportation. Decis. Support Syst. 54(1), 665\u2013680 (2012)","journal-title":"Decis. Support Syst."},{"key":"1041_CR20","doi-asserted-by":"publisher","unstructured":"Kozan, E., Liu, S.Q.: A new open-pit multi-stage mine production timetabling model for drilling, blasting and excavating operations. Min. Technol. (2015). doi: 10.1179\/1743286315Y.0000000031","DOI":"10.1179\/1743286315Y.0000000031"},{"key":"1041_CR21","doi-asserted-by":"publisher","unstructured":"Kozan, E., Liu, S.Q.: An operational-level multi-stage mine production timetabling model for optimally synchronising drilling, blasting and excavating operations. Int. J. Min. Reclam. Environ. (2016). doi: 10.1080\/17480930.2016.1160818","DOI":"10.1080\/17480930.2016.1160818"},{"key":"1041_CR22","doi-asserted-by":"crossref","first-page":"1057","DOI":"10.1016\/j.tre.2010.05.002","volume":"46","author":"A Kuo","year":"2010","unstructured":"Kuo, A., Miller, E., Mahmassani, H.S.: Freight train scheduling with elastic demand. Transp. Res. Part E 46, 1057\u20131070 (2010)","journal-title":"Transp. Res. Part E"},{"issue":"4","key":"1041_CR23","doi-asserted-by":"crossref","first-page":"420","DOI":"10.1287\/trsc.1080.0240","volume":"42","author":"C Liebchen","year":"2008","unstructured":"Liebchen, C.: The first optimized railway timetable in practice. Transp. Sci. 42(4), 420\u2013435 (2008)","journal-title":"Transp. Sci."},{"key":"1041_CR24","doi-asserted-by":"crossref","first-page":"2840","DOI":"10.1016\/j.cor.2008.12.012","volume":"36","author":"SQ Liu","year":"2009","unstructured":"Liu, S.Q., Kozan, E.: Scheduling trains as a blocking parallel-machine job shop scheduling problem. Comput. Oper. Res. 36, 2840\u20132852 (2009)","journal-title":"Comput. Oper. Res."},{"issue":"2","key":"1041_CR25","doi-asserted-by":"crossref","first-page":"175","DOI":"10.1287\/trsc.1100.0332","volume":"45","author":"SQ Liu","year":"2011","unstructured":"Liu, S.Q., Kozan, E.: Scheduling trains with priorities: a no-wait blocking parallel-machine job-shop scheduling model. Transp. Sci. 45(2), 175\u2013198 (2011a)","journal-title":"Transp. Sci."},{"key":"1041_CR26","doi-asserted-by":"crossref","first-page":"90","DOI":"10.1007\/s10696-010-9069-9","volume":"23","author":"SQ Liu","year":"2011","unstructured":"Liu, S.Q., Kozan, E.: Optimising a coal rail network under capacity constraints. Flex. Serv. Manuf. J. 23, 90\u2013110 (2011b)","journal-title":"Flex. Serv. Manuf. J."},{"key":"1041_CR27","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1016\/j.eswa.2015.08.044","volume":"43","author":"SQ Liu","year":"2016","unstructured":"Liu, S.Q., Kozan, E.: New graph-based algorithms to efficiently solve large scale open pit mining optimisation problems. Expert Syst. Appl. 43, 59\u201365 (2016)","journal-title":"Expert Syst. Appl."},{"issue":"2015","key":"1041_CR28","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1155\/2015\/549803","volume":"2015","author":"Z Manli","year":"2015","unstructured":"Manli, Z., Youxi, L., Guoquan, S., Fengfeng, Z.: Constraint programming based biomarker optimization. Hindawi Publ. Corp. BioMed Res. Int. 2015(2015), 1\u20135 (2015)","journal-title":"Hindawi Publ. Corp. BioMed Res. Int."},{"key":"1041_CR29","first-page":"25","volume":"29","author":"M Masoud","year":"2010","unstructured":"Masoud, M., Kozan, E., Kent, G.: Scheduling techniques to optimise sugarcane rail systems. ASOR Bull. 29, 25\u201334 (2010)","journal-title":"ASOR Bull."},{"issue":"2","key":"1041_CR30","doi-asserted-by":"crossref","first-page":"181","DOI":"10.1007\/s10696-011-9092-5","volume":"23","author":"M Masoud","year":"2011","unstructured":"Masoud, M., Kozan, E., Kent, G.A.: A job-shop scheduling approach for optimising sugarcane rail operations. Flex. Serv. Manuf. J. 23(2), 181\u2013196 (2011)","journal-title":"Flex. Serv. Manuf. J."},{"issue":"9","key":"1041_CR31","doi-asserted-by":"crossref","first-page":"2569","DOI":"10.1080\/00207543.2014.957870","volume":"53","author":"M Masoud","year":"2015","unstructured":"Masoud, M., Kozan, E., Kent, G.A.: Hybrid metaheuristic techniques for optimising sugarcane rail operations. Int. J. Prod. Res. 53(9), 2569\u20132589 (2015)","journal-title":"Int. J. Prod. Res."},{"key":"1041_CR32","doi-asserted-by":"publisher","unstructured":"Patterson, S.R., Kozan, E., Hyland, P.: An integrated model of an open-pit coal mine?: improving energy efficiency decisions. Int. J. Prod. Res. (2015). doi: 10.1080\/00207543.2015.1117150","DOI":"10.1080\/00207543.2015.1117150"},{"key":"1041_CR33","doi-asserted-by":"crossref","first-page":"1895","DOI":"10.1016\/j.cor.2004.09.029","volume":"33","author":"RA Russell","year":"2006","unstructured":"Russell, R.A., Urban, T.L.: A constraint programming approach to the multiple-venue sport scheduling problem. Comput. Oper. Res. 33, 1895\u20131906 (2006)","journal-title":"Comput. Oper. Res."},{"issue":"1","key":"1041_CR34","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1007\/s10845-008-0167-4","volume":"21","author":"MR Sierra","year":"2008","unstructured":"Sierra, M.R., Varela, R.: Pruning by dominance in best-first search for the job shop scheduling problem with total flow time. J. Intell. Manuf. 21(1), 111\u2013119 (2008)","journal-title":"J. Intell. Manuf."},{"key":"1041_CR35","doi-asserted-by":"crossref","first-page":"210","DOI":"10.1016\/j.ejor.2012.01.012","volume":"220","author":"G Singh","year":"2012","unstructured":"Singh, G., Sier, D., Ernst, A.T., Gavriliouk, O., Oyston, R., Giles, T., Welgama, P.: A mixed integer programming model for long term capacity expansion planning: a case study from The Hunter Valley Coal Chain. Eur. J. Oper. Res. 220, 210\u2013224 (2012)","journal-title":"Eur. J. Oper. Res."},{"key":"1041_CR36","unstructured":"Singh, G., Sier, D., Ernst, A.T., Oyston, R., Welgama, P.: Long term capacity planning at hunter valley coal chain: models and algorithms. In: The 20th National Conference of Australian Society for Operations Research Incorporating the 5th International Intelligent Logistics System Conference, Gold Coast (2009)"},{"key":"1041_CR37","doi-asserted-by":"crossref","first-page":"114","DOI":"10.1016\/j.trb.2015.10.005","volume":"82","author":"A Talebian","year":"2015","unstructured":"Talebian, A., Zou, B.: Integrated modeling of high performance passenger and freight train planning on shared-use corridors in the US. Transp. Res. Part B Methodol. 82, 114\u2013140 (2015)","journal-title":"Transp. Res. Part B Methodol."},{"issue":"9","key":"1041_CR38","doi-asserted-by":"crossref","first-page":"2740","DOI":"10.1080\/00207543.2012.737955","volume":"51","author":"A Thomas","year":"2012","unstructured":"Thomas, A., Singh, G., Krishnamoorthy, M., Venkeswaran, J.: Distributed optimisation method for multi-resource constrained scheduling in coal supply chains. Int. J. Prod. Res. 51(9), 2740\u20132759 (2012)","journal-title":"Int. J. Prod. Res."},{"key":"1041_CR39","doi-asserted-by":"crossref","first-page":"202","DOI":"10.1016\/j.trb.2006.02.004","volume":"41","author":"J Yuan","year":"2007","unstructured":"Yuan, J., Hansen, I.A.: Optimizing capacity utilization of stations by estimating knock-on train delays. Transp. Res. Part B 41, 202\u2013217 (2007)","journal-title":"Transp. Res. Part B"},{"key":"1041_CR40","doi-asserted-by":"crossref","first-page":"752","DOI":"10.1016\/j.ejor.2004.07.019","volume":"167","author":"X Zhou","year":"2005","unstructured":"Zhou, X., Zhong, M.: Bicriteria train scheduling for high-speed passenger railroad planning applications. Eur. J. Oper. Res. 167, 752\u2013771 (2005)","journal-title":"Eur. J. Oper. Res."}],"container-title":["Optimization Letters"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11590-016-1041-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11590-016-1041-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11590-016-1041-5","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11590-016-1041-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,1]],"date-time":"2019-06-01T17:11:45Z","timestamp":1559409105000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11590-016-1041-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,5,14]]},"references-count":40,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2017,4]]}},"alternative-id":["1041"],"URL":"https:\/\/doi.org\/10.1007\/s11590-016-1041-5","relation":{},"ISSN":["1862-4472","1862-4480"],"issn-type":[{"value":"1862-4472","type":"print"},{"value":"1862-4480","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,5,14]]}}}