{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,5]],"date-time":"2025-10-05T12:11:14Z","timestamp":1759666274772,"version":"3.37.3"},"reference-count":24,"publisher":"Springer Science and Business Media LLC","issue":"7","license":[{"start":{"date-parts":[[2017,10,6]],"date-time":"2017-10-06T00:00:00Z","timestamp":1507248000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100001809","name":"NSFC","doi-asserted-by":"crossref","award":["71671055"],"award-info":[{"award-number":["71671055"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"crossref"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Optim Lett"],"published-print":{"date-parts":[[2018,10]]},"DOI":"10.1007\/s11590-017-1201-2","type":"journal-article","created":{"date-parts":[[2017,10,6]],"date-time":"2017-10-06T02:17:57Z","timestamp":1507256277000},"page":"1609-1623","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":9,"title":["Integrated scheduling of production and distribution for manufacturers with parallel batching facilities"],"prefix":"10.1007","volume":"12","author":[{"given":"Bayi","family":"Cheng","sequence":"first","affiliation":[]},{"given":"Jun","family":"Pei","sequence":"additional","affiliation":[]},{"given":"Kai","family":"Li","sequence":"additional","affiliation":[]},{"given":"Panos M.","family":"Pardalos","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,10,6]]},"reference":[{"issue":"4","key":"1201_CR1","doi-asserted-by":"crossref","first-page":"566","DOI":"10.1287\/opre.51.4.566.16106","volume":"51","author":"NG Hall","year":"2003","unstructured":"Hall, N.G., Potts, C.N.: Supply chain scheduling: batching and delivery. Oper. Res. 51(4), 566\u2013584 (2003)","journal-title":"Oper. Res."},{"issue":"2","key":"1201_CR2","doi-asserted-by":"crossref","first-page":"426","DOI":"10.1287\/opre.1080.0622","volume":"57","author":"E Selvarajah","year":"2009","unstructured":"Selvarajah, E., Steiner, G.: Approximation algorithms for the supplier\u2019s supply chain scheduling problem to minimize delivery and inventory holding costs. Oper. Res. 57(2), 426\u2013438 (2009)","journal-title":"Oper. Res."},{"issue":"2","key":"1201_CR3","doi-asserted-by":"crossref","first-page":"437","DOI":"10.1016\/j.ijpe.2008.08.059","volume":"120","author":"T Sawik","year":"2009","unstructured":"Sawik, T.: Coordinated supply chain scheduling. Int. J. Prod. Econ. 120(2), 437\u2013451 (2009)","journal-title":"Int. J. Prod. Econ."},{"issue":"2","key":"1201_CR4","doi-asserted-by":"crossref","first-page":"223","DOI":"10.1016\/j.ijpe.2011.04.012","volume":"132","author":"WK Yeung","year":"2011","unstructured":"Yeung, W.K., Choi, T.M., Cheng, T.C.E.: Supply chain scheduling and coordination with dual delivery models and inventory storage cost. Int. J. Prod. Econ. 132(2), 223\u2013229 (2011)","journal-title":"Int. J. Prod. Econ."},{"issue":"1","key":"1201_CR5","doi-asserted-by":"crossref","first-page":"113","DOI":"10.1016\/j.ejor.2015.06.004","volume":"247","author":"F Azadian","year":"2015","unstructured":"Azadian, F., Murat, A., Chinnam, R.B.: Integrated production and logistics planning: contract manufacturing and choice of air\/surface transportation. Eur. J. Oper. Res. 247(1), 113\u2013123 (2015)","journal-title":"Eur. J. Oper. Res."},{"issue":"4","key":"1201_CR6","doi-asserted-by":"crossref","first-page":"614","DOI":"10.1287\/mnsc.1040.0325","volume":"51","author":"ZL Chen","year":"2005","unstructured":"Chen, Z.L., Vairaktarakis, G.L.: Integrated scheduling of production and distribution operations. Manag. Sci. 51(4), 614\u2013628 (2005)","journal-title":"Manag. Sci."},{"issue":"1","key":"1201_CR7","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1016\/j.ijpe.2012.03.005","volume":"138","author":"P Amorim","year":"2012","unstructured":"Amorim, P., Gunther, H., Almada-Lobo, B.: Multi-objective integrated production and distribution planning of perishable products. Int. J. Prod. Econ. 138(1), 89\u2013101 (2012)","journal-title":"Int. J. Prod. Econ."},{"issue":"3","key":"1201_CR8","doi-asserted-by":"crossref","first-page":"290","DOI":"10.1016\/j.orl.2013.02.006","volume":"41","author":"JY-T Leung","year":"2013","unstructured":"Leung, J.Y.-T., Chen, Z.L.: Integrated production and distribution with fixed delivery departure dates. Oper. Res. Lett. 41(3), 290\u2013293 (2013)","journal-title":"Oper. Res. Lett."},{"key":"1201_CR9","doi-asserted-by":"crossref","first-page":"13","DOI":"10.1016\/j.ijpe.2014.08.017","volume":"160","author":"A Gao","year":"2015","unstructured":"Gao, A., Qi, L., Lei, L.: Integrated batch production and distribution scheduling with limited vehicle capacity. Int. J. Prod. Econ. 160, 13\u201325 (2015)","journal-title":"Int. J. Prod. Econ."},{"key":"1201_CR10","doi-asserted-by":"crossref","first-page":"35","DOI":"10.1016\/j.cie.2014.08.005","volume":"77","author":"GR Nasiri","year":"2014","unstructured":"Nasiri, G.R., Zolfaghari, R., Davoudpour, H.: An integrated supply chain production\u2013distribution planning with stochastic demands. Comput. Ind. Eng. 77, 35\u201345 (2014)","journal-title":"Comput. Ind. Eng."},{"issue":"2","key":"1201_CR11","doi-asserted-by":"crossref","first-page":"377","DOI":"10.1016\/j.ejor.2008.12.030","volume":"200","author":"I Averbakh","year":"2010","unstructured":"Averbakh, I.: On-line integrated production\u2013distribution scheduling problems with capacitated deliveries. Eur. J. Oper. Res. 200(2), 377\u2013384 (2010)","journal-title":"Eur. J. Oper. Res."},{"key":"1201_CR12","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4614-2361-4","volume-title":"Scheduling: Theory, Algorithms, and Systems","author":"ML Pinedo","year":"2012","unstructured":"Pinedo, M.L.: Scheduling: Theory, Algorithms, and Systems, 4th edn. Springer, New York (2012)","edition":"4"},{"issue":"3","key":"1201_CR13","doi-asserted-by":"crossref","first-page":"1090","DOI":"10.1016\/j.ejor.2006.03.067","volume":"187","author":"JY-T Leung","year":"2008","unstructured":"Leung, J.Y.-T., Ng, C.T., Cheng, T.C.E.: Minimizing sum of completion times for batch scheduling of jobs with deteriorating processing times. Eur. J. Oper. Res. 187(3), 1090\u20131099 (2008)","journal-title":"Eur. J. Oper. Res."},{"key":"1201_CR14","doi-asserted-by":"crossref","first-page":"116","DOI":"10.1016\/j.cie.2014.06.014","volume":"75","author":"B Cheng","year":"2014","unstructured":"Cheng, B., Cai, J., Yang, S., Hu, X.: Algorithms for scheduling incompatible job families on single batching machine with limited capacity. Comput. Ind. Eng. 75, 116\u2013120 (2014)","journal-title":"Comput. Ind. Eng."},{"issue":"3","key":"1201_CR15","doi-asserted-by":"crossref","first-page":"533","DOI":"10.1016\/j.ejor.2012.04.008","volume":"221","author":"A Malapert","year":"2012","unstructured":"Malapert, A., Guret, C., Rousseau, L.: A constraint programming approach for a batch processing problem with non-identical job sizes. Eur. J. Oper. Res. 221(3), 533\u2013545 (2012)","journal-title":"Eur. J. Oper. Res."},{"issue":"1","key":"1201_CR16","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1007\/s11590-014-0740-z","volume":"9","author":"J Pei","year":"2015","unstructured":"Pei, J., Liu, X., Pardalos, P.M., Fan, W., Yang, S.: Single machine serial-batching scheduling with independent setup time and deteriorating job processing times. Optim. Lett. 9(1), 91\u2013104 (2015)","journal-title":"Optim. Lett."},{"key":"1201_CR17","doi-asserted-by":"publisher","DOI":"10.1007\/s11590-016-1074-9","author":"J Pei","year":"2016","unstructured":"Pei, J., Liu, X., Pardalos, P.M., Li, K., Fan, W., Migdalas, A.: Single-machine serial-batching scheduling with a machine availability constraint, position-dependent processing time, and time-dependent set-up time. Optim. Lett. (2016). doi:\n                        10.1007\/s11590-016-1074-9","journal-title":"Optim. Lett."},{"issue":"4","key":"1201_CR18","doi-asserted-by":"crossref","first-page":"1099","DOI":"10.1016\/j.cor.2006.07.006","volume":"35","author":"MM Mazdeh","year":"2008","unstructured":"Mazdeh, M.M., Sarhadi, M., Hindi, K.S.: A branch-and-bound algorithm for single-machine scheduling with batch delivery and job release times. Comput. Oper. Res. 35(4), 1099\u20131111 (2008)","journal-title":"Comput. Oper. Res."},{"issue":"4","key":"1201_CR19","doi-asserted-by":"crossref","first-page":"933","DOI":"10.1287\/opre.1090.0788","volume":"58","author":"P Jula","year":"2010","unstructured":"Jula, P., Leachman, R.C.: Coordinated multistage scheduling of parallel batch-processing machines under multi-resource constraints. Oper. Res. 58(4), 933\u2013947 (2010)","journal-title":"Oper. Res."},{"issue":"10","key":"1201_CR20","doi-asserted-by":"crossref","first-page":"1720","DOI":"10.1016\/j.cor.2009.12.007","volume":"37","author":"NR Parsa","year":"2010","unstructured":"Parsa, N.R., Karimi, B., Kashan, A.H.: A branch and price algorithm to minimize makespan on a single batch-processing machine with arbitrary job sizes. Comput. Oper. Res. 37(10), 1720\u20131730 (2010)","journal-title":"Comput. Oper. Res."},{"issue":"1","key":"1201_CR21","doi-asserted-by":"crossref","first-page":"307","DOI":"10.1007\/s11590-012-0575-4","volume":"8","author":"LL Liu","year":"2014","unstructured":"Liu, L.L., Ng, C.T., Cheng, T.C.E.: Scheduling jobs with release dates on parallel batch processing machines to minimize the makespan. Optim. Lett. 8(1), 307\u2013318 (2014)","journal-title":"Optim. Lett."},{"issue":"5","key":"1201_CR22","doi-asserted-by":"crossref","first-page":"583","DOI":"10.1007\/s10951-015-0449-6","volume":"19","author":"S Xu","year":"2016","unstructured":"Xu, S., Bean, B.C.: Scheduling parallel-machine batch operations to maximize on-time delivery performance. J. Sched. 19(5), 583\u2013600 (2016)","journal-title":"J. Sched."},{"key":"1201_CR23","doi-asserted-by":"crossref","unstructured":"Chen, Z.L. Integrated production and outbound distribution scheduling: review and extensions. Operations Res. 58(1), 130\u2013148 (2010)","DOI":"10.1287\/opre.1080.0688"},{"key":"1201_CR24","doi-asserted-by":"crossref","unstructured":"Dosa, G., Tan Z., Tuza, Z., Yan Y., L\u00e1nyi, C.S. Improved bounds for batch scheduling with nonidentical job sizes. Naval Res. Logist. 61(5), 351\u2013358 (2014)","DOI":"10.1002\/nav.21587"}],"container-title":["Optimization Letters"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11590-017-1201-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11590-017-1201-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11590-017-1201-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2018,9,20]],"date-time":"2018-09-20T01:19:36Z","timestamp":1537406376000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11590-017-1201-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,10,6]]},"references-count":24,"journal-issue":{"issue":"7","published-print":{"date-parts":[[2018,10]]}},"alternative-id":["1201"],"URL":"https:\/\/doi.org\/10.1007\/s11590-017-1201-2","relation":{},"ISSN":["1862-4472","1862-4480"],"issn-type":[{"type":"print","value":"1862-4472"},{"type":"electronic","value":"1862-4480"}],"subject":[],"published":{"date-parts":[[2017,10,6]]}}}