{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,7,1]],"date-time":"2026-07-01T11:55:40Z","timestamp":1782906940950,"version":"3.54.5"},"reference-count":48,"publisher":"Springer Science and Business Media LLC","issue":"5","license":[{"start":{"date-parts":[[2023,7,24]],"date-time":"2023-07-24T00:00:00Z","timestamp":1690156800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2023,7,24]],"date-time":"2023-07-24T00:00:00Z","timestamp":1690156800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Optim Lett"],"published-print":{"date-parts":[[2024,6]]},"DOI":"10.1007\/s11590-023-02039-z","type":"journal-article","created":{"date-parts":[[2023,7,24]],"date-time":"2023-07-24T10:02:16Z","timestamp":1690192936000},"page":"1217-1235","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":5,"title":["Scheduling jobs with general linear deterioration to minimize total weighted number of late jobs"],"prefix":"10.1007","volume":"18","author":[{"given":"Yifu","family":"Feng","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Xin-Na","family":"Geng","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Dan-Yang","family":"Lv","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Ji-Bo","family":"Wang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2023,7,24]]},"reference":[{"issue":"4","key":"2039_CR1","doi-asserted-by":"publisher","first-page":"387","DOI":"10.1016\/0360-8352(88)90041-1","volume":"14","author":"JN Gupta","year":"1988","unstructured":"Gupta, J.N., Gupta, S.K.: Single facility scheduling with nonlinear processing times. Comput. Ind. Eng. 14(4), 387\u2013393 (1988)","journal-title":"Comput. Ind. Eng."},{"issue":"3","key":"2039_CR2","doi-asserted-by":"publisher","first-page":"495","DOI":"10.1287\/opre.38.3.495","volume":"38","author":"S Browne","year":"1990","unstructured":"Browne, S., Yechiali, U.: Scheduling deteriorating jobs on a single processor. Oper. Res. 38(3), 495\u2013498 (1990)","journal-title":"Oper. Res."},{"key":"2039_CR3","doi-asserted-by":"publisher","first-page":"711","DOI":"10.1057\/palgrave.jors.2600740","volume":"50","author":"B Alidaee","year":"1999","unstructured":"Alidaee, B., Womer, N.K.: Scheduling with time dependent processing times: review and extensions. J. Oper. Res. Soc. 50, 711\u2013720 (1999)","journal-title":"J. Oper. Res. Soc."},{"issue":"1","key":"2039_CR4","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1007\/s10951-019-00630-w","volume":"23","author":"S Gawiejnowicz","year":"2020","unstructured":"Gawiejnowicz, S.: A review of four decades of time-dependent scheduling: main results, new topics, and open problems. J. Sched. 23(1), 3\u201347 (2020)","journal-title":"J. Sched."},{"key":"2039_CR5","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-662-59362-2","volume-title":"Models and Algorithms of Time-Dependent Scheduling","author":"S Gawiejnowicz","year":"2020","unstructured":"Gawiejnowicz, S.: Models and Algorithms of Time-Dependent Scheduling. Springer, Berlin (2020)"},{"key":"2039_CR6","doi-asserted-by":"publisher","first-page":"323","DOI":"10.1016\/0305-0483(87)90020-X","volume":"15","author":"SK Gupta","year":"1987","unstructured":"Gupta, S.K., Kunnathur, A.S., Dandapani, K.: Optimal repayment policies for multiple loans. Omega 15, 323\u2013330 (1987)","journal-title":"Omega"},{"key":"2039_CR7","doi-asserted-by":"publisher","first-page":"653","DOI":"10.1016\/0305-0548(94)90080-9","volume":"21","author":"G Mosheiov","year":"1994","unstructured":"Mosheiov, G.: Scheduling jobs under simple linear deterioration. Comput. Oper. Res. 21, 653\u2013659 (1994)","journal-title":"Comput. Oper. Res."},{"key":"2039_CR8","doi-asserted-by":"publisher","first-page":"652","DOI":"10.1139\/x05-267","volume":"36","author":"NP Rachaniotis","year":"2006","unstructured":"Rachaniotis, N.P., Pappis, C.P.: Scheduling fire-fighting tasks using the concept of \u201cdeteriorating jobs\u2019\u2019. Can. J. For. Res. 36, 652\u2013658 (2006)","journal-title":"Can. J. For. Res."},{"issue":"1","key":"2039_CR9","doi-asserted-by":"publisher","first-page":"1950031","DOI":"10.1142\/S0217595919500313","volume":"37","author":"X Huang","year":"2020","unstructured":"Huang, X., Yin, N., Liu, W.-W., Wang, J.-B.: Common due window assignment scheduling with proportional linear deterioration effects. Asia Pac. J. Oper. Res. 37(1), 1950031 (2020)","journal-title":"Asia Pac. J. Oper. Res."},{"issue":"6","key":"2039_CR10","doi-asserted-by":"publisher","first-page":"688","DOI":"10.1057\/palgrave.jors.2601359","volume":"53","author":"A Bachman","year":"2002","unstructured":"Bachman, A., Cheng, T., Janiak, A.: Scheduling start time dependent jobs to minimize the total weighted completion time. J. Oper. Res. Soc. 53(6), 688\u2013693 (2002)","journal-title":"J. Oper. Res. Soc."},{"key":"2039_CR11","doi-asserted-by":"publisher","first-page":"459","DOI":"10.1016\/j.omega.2003.08.003","volume":"31","author":"YS Hsu","year":"2003","unstructured":"Hsu, Y.S., Lin, B.M.T.: Minimization of maximum lateness under linear deterioration. Omega 31, 459\u2013469 (2003)","journal-title":"Omega"},{"issue":"4","key":"2039_CR12","doi-asserted-by":"publisher","first-page":"573","DOI":"10.1016\/j.cie.2010.06.017","volume":"59","author":"G Moslehi","year":"2010","unstructured":"Moslehi, G., Jafari, A.: Minimizing the number of tardy jobs under piecewise-linear deterioration. Comput. Ind. Eng. 59(4), 573\u2013584 (2010)","journal-title":"Comput. Ind. Eng."},{"key":"2039_CR13","doi-asserted-by":"publisher","first-page":"109","DOI":"10.1016\/j.ins.2013.08.030","volume":"256","author":"C-C Wu","year":"2014","unstructured":"Wu, C.-C., Wu, W.-H., Wu, W.-H., Hsu, P.-H., Yin, Y., Xu, J.: A single-machine scheduling with a truncated linear deterioration and ready times. Inf. Sci. 256, 109\u2013125 (2014)","journal-title":"Inf. Sci."},{"issue":"3","key":"2039_CR14","doi-asserted-by":"publisher","first-page":"1172","DOI":"10.1016\/j.apm.2014.07.028","volume":"39","author":"J-B Wang","year":"2015","unstructured":"Wang, J.-B., Wang, J.-J.: Single-machine scheduling problems with precedence constraints and simple linear deterioration. Appl. Math. Model. 39(3), 1172\u20131182 (2015)","journal-title":"Appl. Math. Model."},{"key":"2039_CR15","first-page":"8750","volume":"218","author":"WC Lee","year":"2012","unstructured":"Lee, W.C., Lu, Z.S.: Group scheduling with deteriorating jobs to minimize the total weighted number of late jobs. Appl. Math. Comput. 218, 8750\u20138757 (2012)","journal-title":"Appl. Math. Comput."},{"key":"2039_CR16","doi-asserted-by":"publisher","first-page":"226","DOI":"10.1016\/j.ins.2014.02.034","volume":"275","author":"J-B Wang","year":"2014","unstructured":"Wang, J.-B., Wang, J.-J.: Single machine group scheduling with time dependent processing times and ready times. Inf. Sci. 275, 226\u2013231 (2014)","journal-title":"Inf. Sci."},{"issue":"5","key":"2039_CR17","doi-asserted-by":"publisher","first-page":"862","DOI":"10.1080\/0305215X.2018.1500562","volume":"51","author":"F Liu","year":"2019","unstructured":"Liu, F., Yang, J., Lu, Y.-Y.: Solution algorithms for single-machine group scheduling with ready times and deteriorating jobs. Eng. Optim. 51(5), 862\u2013874 (2019)","journal-title":"Eng. Optim."},{"issue":"1\u20132","key":"2039_CR18","doi-asserted-by":"publisher","first-page":"455","DOI":"10.1007\/s12190-018-01222-1","volume":"60","author":"X Huang","year":"2019","unstructured":"Huang, X.: Bicriterion scheduling with group technology and deterioration effect. J. Appl. Math. Comput. 60(1\u20132), 455\u2013464 (2019)","journal-title":"J. Appl. Math. Comput."},{"issue":"10","key":"2039_CR19","doi-asserted-by":"publisher","first-page":"3186","DOI":"10.1080\/00207543.2019.1566675","volume":"57","author":"X Sun","year":"2019","unstructured":"Sun, X., Geng, X.-N.: Single-machine scheduling with deteriorating effects and machine maintenance. Int. J. Prod. Res. 57(10), 3186\u20133199 (2019)","journal-title":"Int. J. Prod. Res."},{"key":"2039_CR20","doi-asserted-by":"publisher","DOI":"10.1007\/s10951-022-00756-4","author":"X Sun","year":"2022","unstructured":"Sun, X., Liu, T., Geng, X.-N., Hu, Y., Xu, J.-X.: Optimization of scheduling problems with deterioration effects and an optional maintenance activity. J. Sched. (2022). https:\/\/doi.org\/10.1007\/s10951-022-00756-4","journal-title":"J. Sched."},{"issue":"6","key":"2039_CR21","doi-asserted-by":"publisher","first-page":"2250005","DOI":"10.1142\/S0217595922500051","volume":"39","author":"X Jia","year":"2022","unstructured":"Jia, X., Lv, D.-Y., Hu, Y., Wang, J.-B., Wang, Z., Wang, E.: Slack due-window assignment scheduling problem with deterioration effects and a deteriorating maintenance activity. Asia Pac. J. Oper. Res. 39(6), 2250005 (2022)","journal-title":"Asia Pac. J. Oper. Res."},{"key":"2039_CR22","doi-asserted-by":"publisher","first-page":"49","DOI":"10.1057\/jors.2013.5","volume":"64","author":"D Oron","year":"2014","unstructured":"Oron, D.: Scheduling controllable processing time jobs in a deteriorating environment. J. Oper. Res. Soc. 64, 49\u201356 (2014)","journal-title":"J. Oper. Res. Soc."},{"issue":"2","key":"2039_CR23","doi-asserted-by":"publisher","first-page":"231","DOI":"10.1080\/0305215X.2018.1454442","volume":"51","author":"J-B Wang","year":"2019","unstructured":"Wang, J.-B., Liang, X.-X.: Group scheduling with deteriorating jobs and allotted resource under limited resource availability constraint. Eng. Optim. 51(2), 231\u2013246 (2019)","journal-title":"Eng. Optim."},{"issue":"8","key":"2039_CR24","doi-asserted-by":"publisher","first-page":"1281","DOI":"10.1080\/0305215X.2018.1519558","volume":"51","author":"L-H Sun","year":"2019","unstructured":"Sun, L.-H., Ge, C.-C., Zhang, W., Wang, J.-B., Lu, Y.-Y.: Permutation flow shop scheduling with simple linear deterioration. Eng. Optim. 51(8), 1281\u20131300 (2019)","journal-title":"Eng. Optim."},{"key":"2039_CR25","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2020.106482","volume":"145","author":"X Zhang","year":"2020","unstructured":"Zhang, X., Liu, S.-C., Lin, W.-C., Wu, C.-C.: Parallel-machine scheduling with linear deteriorating jobs and preventive maintenance activities under a potential machine disruption. Comput. Ind. Eng. 145, 106482 (2020)","journal-title":"Comput. Ind. Eng."},{"key":"2039_CR26","doi-asserted-by":"publisher","first-page":"857","DOI":"10.1007\/s11590-019-01389-x","volume":"14","author":"M Kong","year":"2020","unstructured":"Kong, M., Liu, X., Pei, J., Zhou, Z., Pardalos, P.M.: Parallel-batching scheduling of deteriorating jobs with non-identical sizes and rejection on a single machine. Optim. Lett. 14, 857\u2013871 (2020)","journal-title":"Optim. Lett."},{"key":"2039_CR27","doi-asserted-by":"publisher","first-page":"2983","DOI":"10.3390\/math10162983","volume":"10","author":"J-X Yan","year":"2022","unstructured":"Yan, J.-X., Ren, N., Bei, H.-B., Bao, H., Wang, J.-B.: Scheduling with resource allocation, deteriorating effect and group technology to minimize total completion time. Mathematics 10, 2983 (2022)","journal-title":"Mathematics"},{"issue":"2","key":"2039_CR28","doi-asserted-by":"publisher","first-page":"2250022","DOI":"10.1142\/S0217595922500221","volume":"40","author":"F Teng","year":"2023","unstructured":"Teng, F., Luo, S.-W., Lv, D.-Y., Wang, J.-B.: Approaches to solving scheduling with due-window assignment and deterioration effects. Asia Pac. J. Oper. Res. 40(2), 2250022 (2023)","journal-title":"Asia Pac. J. Oper. Res."},{"key":"2039_CR29","doi-asserted-by":"publisher","first-page":"100","DOI":"10.1007\/s10878-023-01025-6","volume":"45","author":"L Pan","year":"2023","unstructured":"Pan, L., Sun, X., Wang, J.-B., Zhang, L.-H., Lv, D.-Y.: Due date assignment single-machine scheduling with delivery times, position-dependent weights and deteriorating jobs. J. Comb. Optim. 45, 100 (2023)","journal-title":"J. Comb. Optim."},{"issue":"3","key":"2039_CR30","doi-asserted-by":"publisher","first-page":"1658","DOI":"10.3934\/jimo.2022011","volume":"19","author":"J-B Wang","year":"2023","unstructured":"Wang, J.-B., Lv, D.-Y., Wang, S.-Y., Chong, J.: Resource allocation scheduling with deteriorating jobs and position-dependent workloads. J. Ind. Manag. Optim. 19(3), 1658\u20131669 (2023)","journal-title":"J. Ind. Manag. Optim."},{"key":"2039_CR31","doi-asserted-by":"publisher","first-page":"389","DOI":"10.1007\/s10898-011-9767-1","volume":"54","author":"A Jafari","year":"2012","unstructured":"Jafari, A., Moslehi, G.: Scheduling linear deteriorating jobs to minimize the number of tardy jobs. J. Glob. Optim. 54, 389\u2013404 (2012)","journal-title":"J. Glob. Optim."},{"issue":"12","key":"2039_CR32","doi-asserted-by":"publisher","first-page":"1887","DOI":"10.1016\/S0305-0548(02)00114-4","volume":"30","author":"RL Bulfin","year":"2003","unstructured":"Bulfin, R.L., M\u2019Hallah, R.: Minimizing the weighted number of tardy jobs on a two-machine flow shop. Comput. Oper. Res. 30(12), 1887\u20131900 (2003)","journal-title":"Comput. Oper. Res."},{"key":"2039_CR33","doi-asserted-by":"publisher","first-page":"77","DOI":"10.1287\/mnsc.16.1.77","volume":"16","author":"EL Lawler","year":"1969","unstructured":"Lawler, E.L., Moore, J.M.: A functional equation and its application to resource allocation and sequencing problems. Manag. Sci. 16, 77\u201384 (1969)","journal-title":"Manag. Sci."},{"key":"2039_CR34","doi-asserted-by":"crossref","unstructured":"Karp, R.M.: Reducibility among combinatorial problems. In: Complexity of Computer Computations (Proc. Sympos., IBM Thomas J. Watson Res. Center, Yorktown Heights, N.Y., 1972), pp. 85\u2013103. Plenum, New York (1972)","DOI":"10.1007\/978-1-4684-2001-2_9"},{"key":"2039_CR35","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4615-6089-0","volume-title":"Tabu Search","author":"F Glover","year":"1997","unstructured":"Glover, F., Laguna, M.: Tabu Search. Kluwer, Norwell (1997)"},{"key":"2039_CR36","doi-asserted-by":"publisher","first-page":"671","DOI":"10.1126\/science.220.4598.671","volume":"220","author":"S Kirkpatrick","year":"1983","unstructured":"Kirkpatrick, S., Gelatt, C., Vecchi, M.: Optimization by simulated annealing. Science 220, 671\u2013680 (1983)","journal-title":"Science"},{"key":"2039_CR37","doi-asserted-by":"publisher","first-page":"152","DOI":"10.1002\/hfm.20365","volume":"24","author":"K Lai","year":"2014","unstructured":"Lai, K., Hsu, P.-H., Ting, P.-H., Wu, C.-C.: A truncated sum of processing-times-based learning model for a two-machine flowshop scheduling problem. Hum. Factors. Ergon. Manuf. Serv. Ind. 24, 152\u2013160 (2014)","journal-title":"Hum. Factors. Ergon. Manuf. Serv. Ind."},{"key":"2039_CR38","doi-asserted-by":"publisher","first-page":"216","DOI":"10.1016\/j.ins.2012.02.043","volume":"199","author":"R Rudek","year":"2012","unstructured":"Rudek, R.: The single processor total weighted completion time scheduling problem with the sum-of-processing-time based learning model. Inf. Sci. 199, 216\u2013229 (2012)","journal-title":"Inf. Sci."},{"key":"2039_CR39","doi-asserted-by":"publisher","first-page":"113","DOI":"10.1007\/s11590-012-0467-7","volume":"8","author":"Y-Y Lu","year":"2014","unstructured":"Lu, Y.-Y., Li, G., Wu, Y.-B., Ji, P.: Optimal due-date assignment problem with learning effect and resource-dependent processing times. Optim. Lett. 8, 113\u2013127 (2014)","journal-title":"Optim. Lett."},{"issue":"3","key":"2039_CR40","doi-asserted-by":"publisher","first-page":"1135","DOI":"10.1111\/itor.12323","volume":"26","author":"J-B Wang","year":"2019","unstructured":"Wang, J.-B., Liu, F., Wang, J.-J.: Research on m-machine flow shop scheduling with truncated learning effects. Int. Trans. Oper. Res. 26(3), 1135\u20131151 (2019)","journal-title":"Int. Trans. Oper. Res."},{"issue":"5","key":"2039_CR41","doi-asserted-by":"publisher","first-page":"2817","DOI":"10.3934\/jimo.2020096","volume":"17","author":"S Zhao","year":"2021","unstructured":"Zhao, S.: Resource allocation flowshop scheduling with learning effect and slack due window assignment. J. Ind. Manag. Optim. 17(5), 2817\u20132835 (2021)","journal-title":"J. Ind. Manag. Optim."},{"key":"2039_CR42","doi-asserted-by":"publisher","first-page":"146","DOI":"10.1007\/s40314-022-01851-0","volume":"41","author":"S Zhao","year":"2022","unstructured":"Zhao, S.: Scheduling jobs with general truncated learning effects including proportional setup times. Comput. Appl. Math. 41, 146 (2022)","journal-title":"Comput. Appl. Math."},{"key":"2039_CR43","doi-asserted-by":"publisher","first-page":"1327","DOI":"10.1007\/s11590-020-01641-9","volume":"15","author":"S Mu\u015ftu","year":"2021","unstructured":"Mu\u015ftu, S., Eren, T.: The single machine scheduling problem with setup times under an extension of the general learning and forgetting effects. Optim. Lett. 15, 1327\u20131343 (2021)","journal-title":"Optim. Lett."},{"issue":"6","key":"2039_CR44","doi-asserted-by":"publisher","first-page":"5957","DOI":"10.3934\/mbe.2022278","volume":"19","author":"X Wang","year":"2022","unstructured":"Wang, X., Liu, W., Li, L., Zhao, P., Zhang, R.: Resource dependent scheduling with truncated learning effects. Math. Biosci. Eng. 19(6), 5957\u20135967 (2022)","journal-title":"Math. Biosci. Eng."},{"key":"2039_CR45","doi-asserted-by":"publisher","first-page":"417","DOI":"10.1007\/s40314-022-02133-5","volume":"41","author":"J-B Wang","year":"2022","unstructured":"Wang, J.-B., Zhang, L.-H., Lv, Z.-G., Lv, D.-Y., Geng, X.-N., Sun, X.: Heuristic and exact algorithms for single-machine scheduling problems with general truncated learning effects. Comput. Appl. Math. 41, 417 (2022)","journal-title":"Comput. Appl. Math."},{"key":"2039_CR46","doi-asserted-by":"publisher","first-page":"997","DOI":"10.1111\/itor.12121","volume":"22","author":"M Ji","year":"2015","unstructured":"Ji, M., Yao, D., Yang, Q., Cheng, T.C.E.: Single-machine common flow allowance scheduling with aging effect, resource allocation, and a rate-modifying activity. Int. Trans. Oper. Res. 22, 997\u20131015 (2015)","journal-title":"Int. Trans. Oper. Res."},{"issue":"5","key":"2039_CR47","doi-asserted-by":"publisher","first-page":"1956","DOI":"10.1111\/itor.12393","volume":"26","author":"Z Zhu","year":"2019","unstructured":"Zhu, Z., Liu, M., Chu, C., Li, J.: Multitasking scheduling with multiple rate-modifying activities. Int. Trans. Oper. Res. 26(5), 1956\u20131976 (2019)","journal-title":"Int. Trans. Oper. Res."},{"key":"2039_CR48","doi-asserted-by":"publisher","first-page":"150","DOI":"10.3390\/systems11030150","volume":"11","author":"W Wu","year":"2023","unstructured":"Wu, W., Lv, D.-Y., Wang, J.-B.: Two due-date assignment scheduling with location-dependent weights and a deteriorating maintenance activity. Systems 11, 150 (2023)","journal-title":"Systems"}],"container-title":["Optimization Letters"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s11590-023-02039-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s11590-023-02039-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s11590-023-02039-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,5,18]],"date-time":"2024-05-18T03:35:56Z","timestamp":1716003356000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s11590-023-02039-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,7,24]]},"references-count":48,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2024,6]]}},"alternative-id":["2039"],"URL":"https:\/\/doi.org\/10.1007\/s11590-023-02039-z","relation":{},"ISSN":["1862-4472","1862-4480"],"issn-type":[{"value":"1862-4472","type":"print"},{"value":"1862-4480","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023,7,24]]},"assertion":[{"value":"1 October 2022","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"27 June 2023","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"24 July 2023","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}