{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,2]],"date-time":"2026-06-02T20:34:12Z","timestamp":1780432452453,"version":"3.54.1"},"reference-count":42,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2024,7,9]],"date-time":"2024-07-09T00:00:00Z","timestamp":1720483200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2024,7,9]],"date-time":"2024-07-09T00:00:00Z","timestamp":1720483200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Optim Lett"],"published-print":{"date-parts":[[2025,5]]},"DOI":"10.1007\/s11590-024-02137-6","type":"journal-article","created":{"date-parts":[[2024,7,9]],"date-time":"2024-07-09T05:01:50Z","timestamp":1720501310000},"page":"811-832","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":4,"title":["Stability approach to CDC truck scheduling problem under uncertainty"],"prefix":"10.1007","volume":"19","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-1444-6401","authenticated-orcid":false,"given":"Gabriela B.","family":"Fonseca","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Thiago H.","family":"Nogueira","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Mart\u00edn G.","family":"Ravetti","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2024,7,9]]},"reference":[{"issue":"2","key":"2137_CR1","first-page":"57","volume":"70","author":"G Stalk","year":"1991","unstructured":"Stalk, G., Evans, P., Shulman, L.E.: Competing on capabilities: the new rules of corporate strategy. Harv. Bus. Rev. 70(2), 57\u201369 (1991)","journal-title":"Harv. Bus. Rev."},{"issue":"8","key":"2137_CR2","first-page":"36","volume":"36","author":"G Forger","year":"1995","unstructured":"Forger, G.: Ups starts worlds premiere cross-docking operation. Mod. Mater. Handl. 36(8), 36\u201338 (1995)","journal-title":"Mod. Mater. Handl."},{"issue":"7","key":"2137_CR3","first-page":"44","volume":"53","author":"CE Witt","year":"1998","unstructured":"Witt, C.E.: Crossdocking: concepts demand choice. Mater. Handl. Eng. 53(7), 44\u201349 (1998)","journal-title":"Mater. Handl. Eng."},{"issue":"4","key":"2137_CR4","doi-asserted-by":"publisher","first-page":"419","DOI":"10.1287\/trsc.33.4.419","volume":"33","author":"KR Gue","year":"1999","unstructured":"Gue, K.R.: The effects of trailer scheduling on the layout of freight terminals. Transp. Sci. 33(4), 419\u2013428 (1999)","journal-title":"Transp. Sci."},{"issue":"4","key":"2137_CR5","doi-asserted-by":"publisher","first-page":"522","DOI":"10.1016\/j.omega.2006.11.011","volume":"36","author":"C Kim","year":"2008","unstructured":"Kim, C., Yang, K.H., Kim, J.: A strategy for third-party logistics systems: a case analysis using the blue ocean strategy. Omega 36(4), 522\u2013534 (2008)","journal-title":"Omega"},{"key":"2137_CR6","unstructured":"AL-Behadili, M.R.S.: Robust dynamic and stochastic scheduling in permutation flow shops. PhD thesis, University of Portsmouth. (2018)"},{"key":"2137_CR7","doi-asserted-by":"publisher","first-page":"39","DOI":"10.1023\/A:1022235519958","volume":"6","author":"GE Vieira","year":"2003","unstructured":"Vieira, G.E., Herrmann, J.W., Lin, E.: Rescheduling manufacturing systems: a framework of strategies, policies, and methods. J. Sched. 6, 39\u201362 (2003)","journal-title":"J. Sched."},{"key":"2137_CR8","doi-asserted-by":"publisher","first-page":"189","DOI":"10.1007\/s00170-008-1577-3","volume":"42","author":"M Gholami","year":"2009","unstructured":"Gholami, M., Zandieh, M., Alem-Tabriz, A.: Scheduling hybrid flow shop with sequence-dependent setup times and machines with random breakdowns. Int. J. Adv. Manuf. Technol. 42, 189\u2013201 (2009)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"4","key":"2137_CR9","doi-asserted-by":"publisher","first-page":"2044","DOI":"10.1109\/TII.2014.2342378","volume":"10","author":"H Gao","year":"2014","unstructured":"Gao, H., Kwong, S., Fan, B., Wang, R.: A hybrid particle-swarm Tabu search algorithm for solving job shop scheduling problems. IEEE Trans. Industr. Inf. 10(4), 2044\u20132054 (2014)","journal-title":"IEEE Trans. Industr. Inf."},{"key":"2137_CR10","doi-asserted-by":"crossref","unstructured":"Wang, Z., Zhang, J., Si, J.: Dynamic job shop scheduling problem with new job arrivals: A survey. In: Proceedings of 2019 Chinese Intelligent Automation Conference, pp. 664\u2013671 (2020). Springer","DOI":"10.1007\/978-981-32-9050-1_75"},{"key":"2137_CR11","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2023.109718","volume":"186","author":"M Zhang","year":"2023","unstructured":"Zhang, M., Wang, L., Qiu, F., Liu, X.: Dynamic scheduling for flexible job shop with insufficient transportation resources via graph neural network and deep reinforcement learning. Comput. Ind. Eng. 186, 109718 (2023)","journal-title":"Comput. Ind. Eng."},{"key":"2137_CR12","doi-asserted-by":"publisher","first-page":"389","DOI":"10.1016\/j.cie.2013.05.023","volume":"66","author":"L Nie","year":"2013","unstructured":"Nie, L., Gao, L., Li, P., Shao, X.: Reactive scheduling in a job shop where jobs arrive over time. Comput. Ind. Eng. 66, 389\u2013405 (2013)","journal-title":"Comput. Ind. Eng."},{"key":"2137_CR13","doi-asserted-by":"publisher","first-page":"41","DOI":"10.1057\/jors.2009.2","volume":"60","author":"CN Potts","year":"2009","unstructured":"Potts, C.N., Strusevich, V.A.: Fifty years of scheduling: a survey of milestones. J. Oper. Res. Soc. 60, 41\u201368 (2009)","journal-title":"J. Oper. Res. Soc."},{"issue":"4","key":"2137_CR14","doi-asserted-by":"publisher","first-page":"417","DOI":"10.1007\/s10951-008-0090-8","volume":"12","author":"D Ouelhadj","year":"2009","unstructured":"Ouelhadj, D., Petrovic, S.: A survey of dynamic scheduling in manufacturing systems. J. Sched. 12(4), 417\u2013431 (2009)","journal-title":"J. Sched."},{"key":"2137_CR15","doi-asserted-by":"publisher","first-page":"39","DOI":"10.1023\/A:1022235519958","volume":"6","author":"GE Vieira","year":"2003","unstructured":"Vieira, G.E., Herrmann, J.W., Lin, E.: Rescheduling manufacturing systems: a framework of strategies, policies, and methods. J. Sched. 6, 39\u201362 (2003)","journal-title":"J. Sched."},{"issue":"6","key":"2137_CR16","doi-asserted-by":"publisher","first-page":"715","DOI":"10.1016\/j.autcon.2009.02.002","volume":"18","author":"S-S Liu","year":"2009","unstructured":"Liu, S.-S., Shih, K.-C.: Construction rescheduling based on a manufacturing rescheduling framework. Autom. Constr. 18(6), 715\u2013723 (2009)","journal-title":"Autom. Constr."},{"issue":"6","key":"2137_CR17","doi-asserted-by":"publisher","first-page":"413","DOI":"10.1016\/j.omega.2009.10.008","volume":"38","author":"N Boysen","year":"2010","unstructured":"Boysen, N., Fliedner, M.: Cross dock scheduling: Classification, literature review and research agenda. Omega 38(6), 413\u2013422 (2010)","journal-title":"Omega"},{"key":"2137_CR18","doi-asserted-by":"publisher","first-page":"145","DOI":"10.1016\/j.omega.2015.09.006","volume":"62","author":"AL Ladier","year":"2016","unstructured":"Ladier, A.L., Alpan, G.: Cross-docking operations: current research versus industry practice. Omega 62, 145\u2013162 (2016)","journal-title":"Omega"},{"issue":"11","key":"2137_CR19","doi-asserted-by":"publisher","first-page":"4789","DOI":"10.3390\/su12114789","volume":"12","author":"R Kiani Mavi","year":"2020","unstructured":"Kiani Mavi, R., Goh, M., Kiani Mavi, N., Jie, F., Brown, K., Biermann, S., Khanfar, A.A.: Cross-docking: a systematic literature review. Sustainability 12(11), 4789 (2020)","journal-title":"Sustainability"},{"issue":"1","key":"2137_CR20","doi-asserted-by":"publisher","first-page":"59","DOI":"10.1016\/j.ejor.2007.10.051","volume":"193","author":"F Chen","year":"2009","unstructured":"Chen, F., Lee, C.-Y.: Minimizing the makespan in a two-machine cross-docking flow shop problem. Eur. J. Oper. Res. 193(1), 59\u201372 (2009)","journal-title":"Eur. J. Oper. Res."},{"key":"2137_CR21","doi-asserted-by":"publisher","first-page":"135","DOI":"10.1016\/j.cie.2016.03.001","volume":"95","author":"PM Cota","year":"2016","unstructured":"Cota, P.M., Gimenez, B.M., Ara\u00fajo, D.P., Nogueira, T.H., de Souza, M.C., Ravetti, M.G.: Time-indexed formulation and polynomial time heuristic for a multi-dock truck scheduling problem in a cross-docking centre. Comput. Ind. Eng. 95, 135\u2013143 (2016)","journal-title":"Comput. Ind. Eng."},{"key":"2137_CR22","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2020.106391","volume":"143","author":"TH Nogueira","year":"2020","unstructured":"Nogueira, T.H., Coutinho, F.P., Ribeiro, R.P., Gavetti, R.M.: Parallel-machine scheduling methodology for a multi-dock truck sequencing problem in a cross-docking center. Comput. Ind. Eng. 143, 106391 (2020)","journal-title":"Comput. Ind. Eng."},{"key":"2137_CR23","doi-asserted-by":"publisher","first-page":"139","DOI":"10.1016\/j.ejor.2018.11.033","volume":"275","author":"GB Fonseca","year":"2019","unstructured":"Fonseca, G.B., Nogueira, T.H., Ravetti, M.G.: A hybrid lagrangian metaheuristic for the cross-docking flow shop scheduling problem. Eur. J. Oper. Res. 275, 139\u2013154 (2019)","journal-title":"Eur. J. Oper. Res."},{"issue":"6","key":"2137_CR24","doi-asserted-by":"publisher","first-page":"2066","DOI":"10.1016\/j.cor.2008.07.003","volume":"36","author":"F Chen","year":"2009","unstructured":"Chen, F., Song, K.: Minimizing makespan in two-stage hybrid cross docking scheduling problem. Comput. Oper. Res. 36(6), 2066\u20132073 (2009)","journal-title":"Comput. Oper. Res."},{"key":"2137_CR25","doi-asserted-by":"publisher","first-page":"41","DOI":"10.1016\/j.orl.2018.12.002","volume":"47","author":"H Wei","year":"2019","unstructured":"Wei, H., Yuan, J.: Two-machine flow-shop scheduling with equal processing time on the second machine for minimizing total weighted completion time. Oper. Res. Lett. 47, 41\u201346 (2019)","journal-title":"Oper. Res. Lett."},{"key":"2137_CR26","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2020.104889","volume":"117","author":"H Zhan","year":"2020","unstructured":"Zhan, H., Zhao-hong, J., Li, K.: Ant colony optimization algorithm for total weighted completion time minimization on non-identical batch machines. Comput. Oper. Res. 117, 104889 (2020)","journal-title":"Comput. Oper. Res."},{"issue":"5","key":"2137_CR27","doi-asserted-by":"publisher","first-page":"505","DOI":"10.1016\/j.orl.2018.07.006","volume":"46","author":"S J\u00e4ger","year":"2018","unstructured":"J\u00e4ger, S.: Approximating total weighted completion time on identical parallel machines with precedence constraints and release dates. Oper. Res. Lett. 46(5), 505\u2013509 (2018)","journal-title":"Oper. Res. Lett."},{"key":"2137_CR28","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2021.115986","volume":"188","author":"MM Nasiri","year":"2022","unstructured":"Nasiri, M.M., Ahmadi, N., Konur, D., Rahbari, A.: A predictive-reactive cross-dock rescheduling system under truck arrival uncertainty. Expert Syst. Appl. 188, 115986 (2022)","journal-title":"Expert Syst. Appl."},{"issue":"4","key":"2137_CR29","doi-asserted-by":"publisher","first-page":"663","DOI":"10.1016\/j.cie.2013.05.009","volume":"65","author":"D Konur","year":"2013","unstructured":"Konur, D., Golias, M.M.: Analysis of different approaches to cross-dock truck scheduling with truck arrival time uncertainty. Comput. Ind. Eng. 65(4), 663\u2013672 (2013)","journal-title":"Comput. Ind. Eng."},{"key":"2137_CR30","doi-asserted-by":"publisher","first-page":"16","DOI":"10.1016\/j.cie.2016.07.003","volume":"99","author":"AL Ladier","year":"2016","unstructured":"Ladier, A.L., Alpan, G.: Robust cross-dock scheduling with time windows. Comput. Ind. Eng. 99, 16\u201328 (2016)","journal-title":"Comput. Ind. Eng."},{"issue":"1","key":"2137_CR31","doi-asserted-by":"publisher","first-page":"377","DOI":"10.1016\/j.ejor.2006.10.047","volume":"184","author":"W Yu","year":"2008","unstructured":"Yu, W., Egbelu, P.J.: Scheduling of inbound and outbound trucks in cross docking systems with temporary storage. Eur. J. Oper. Res. 184(1), 377\u2013396 (2008)","journal-title":"Eur. J. Oper. Res."},{"issue":"1","key":"2137_CR32","doi-asserted-by":"publisher","first-page":"12","DOI":"10.1016\/j.cie.2009.06.006","volume":"58","author":"B Vahdani","year":"2010","unstructured":"Vahdani, B., Zandieh, M.: Scheduling trucks in cross-docking systems: Robust meta-heuristics. Comput. Ind. Eng. 58(1), 12\u201324 (2010)","journal-title":"Comput. Ind. Eng."},{"issue":"3","key":"2137_CR33","doi-asserted-by":"publisher","first-page":"1964","DOI":"10.1016\/j.eswa.2010.07.130","volume":"38","author":"AB Arabani","year":"2011","unstructured":"Arabani, A.B., Ghomi, S.F., Zandieh, M.: Meta-heuristics implementation for scheduling of trucks in a cross-docking system with temporary storage. Expert Syst. Appl. 38(3), 1964\u20131979 (2011)","journal-title":"Expert Syst. Appl."},{"issue":"11","key":"2137_CR34","doi-asserted-by":"publisher","first-page":"3683","DOI":"10.1016\/j.asoc.2012.05.023","volume":"12","author":"TW Liao","year":"2012","unstructured":"Liao, T.W., Egbelu, P.J., Chang, P.-C.: Two hybrid differential evolution algorithms for optimal inbound and outbound truck sequencing in cross docking operations. Appl. Soft Comput. 12(11), 3683\u20133697 (2012)","journal-title":"Appl. Soft Comput."},{"key":"2137_CR35","unstructured":"Vahdani, B., Tavakkoli-Moghaddam, R., Mousavi, S.: Scheduling of trucks in cross-docking systems: a hybrid meta-heuristic algorithm. In: International Conference on Applied Operational Research. Lisbon, Portugal, pp. 125\u2013132 (2013)"},{"issue":"1","key":"2137_CR36","doi-asserted-by":"publisher","first-page":"135","DOI":"10.1007\/s00291-008-0139-2","volume":"32","author":"N Boysen","year":"2010","unstructured":"Boysen, N., Fliedner, M., Scholl, A.: Scheduling inbound and outbound trucks at crossdocking terminals. OR Spectrum 32(1), 135\u2013161 (2010)","journal-title":"OR Spectrum"},{"issue":"4","key":"2137_CR37","doi-asserted-by":"publisher","first-page":"1231","DOI":"10.1080\/00207543.2013.848485","volume":"52","author":"AL Shiguemoto","year":"2014","unstructured":"Shiguemoto, A.L., CavalcanteNetto, U.S., Bauab, G.H.S.: An efficient hybrid meta-heuristic for a cross-docking system with temporary storage. Int. J. Prod. Res. 52(4), 1231\u20131239 (2014)","journal-title":"Int. J. Prod. Res."},{"issue":"5","key":"2137_CR38","doi-asserted-by":"publisher","first-page":"650","DOI":"10.1016\/j.tre.2009.12.011","volume":"46","author":"R Soltani","year":"2010","unstructured":"Soltani, R., Sadjadi, S.J.: Scheduling trucks in cross-docking systems: a robust meta-heuristics approach. Transp. Res. Part E Logis. Transp. Rev. 46(5), 650\u2013666 (2010)","journal-title":"Transp. Res. Part E Logis. Transp. Rev."},{"key":"2137_CR39","unstructured":"Fonseca, G.B.: O problema de sequenciamento de caminh\u00f5es em um centro de cross-docking com duas m\u00e1quinas. Master\u2019s thesis, Universidade Federal de Minas Gerais. (2015)"},{"key":"2137_CR40","doi-asserted-by":"publisher","first-page":"147","DOI":"10.1016\/j.asoc.2018.05.027","volume":"70","author":"H Li","year":"2018","unstructured":"Li, H., Gajpal, Y., Bector, C.R.: Single machine scheduling with two-agent for total weighted completion time objectives. Appl. Soft Comput. 70, 147\u2013156 (2018)","journal-title":"Appl. Soft Comput."},{"issue":"6","key":"2137_CR41","doi-asserted-by":"publisher","first-page":"354","DOI":"10.1287\/mnsc.17.6.B354","volume":"17","author":"N Siemens","year":"1971","unstructured":"Siemens, N.: A simple CPM time-cost tradeoff algorithm. Manage. Sci. 17(6), 354 (1971)","journal-title":"Manage. Sci."},{"key":"2137_CR42","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4614-2361-4","volume-title":"Scheduling: theory, algorithms, and systems","author":"ML Pinedo","year":"2012","unstructured":"Pinedo, M.L.: Scheduling: theory, algorithms, and systems. Springer, Berlin (2012)"}],"container-title":["Optimization Letters"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s11590-024-02137-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s11590-024-02137-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s11590-024-02137-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,4,15]],"date-time":"2025-04-15T05:37:32Z","timestamp":1744695452000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s11590-024-02137-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,7,9]]},"references-count":42,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2025,5]]}},"alternative-id":["2137"],"URL":"https:\/\/doi.org\/10.1007\/s11590-024-02137-6","relation":{},"ISSN":["1862-4472","1862-4480"],"issn-type":[{"value":"1862-4472","type":"print"},{"value":"1862-4480","type":"electronic"}],"subject":[],"published":{"date-parts":[[2024,7,9]]},"assertion":[{"value":"3 November 2022","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"2 July 2024","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"9 July 2024","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}