{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,8]],"date-time":"2026-04-08T17:00:32Z","timestamp":1775667632849,"version":"3.50.1"},"reference-count":17,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2016,4,1]],"date-time":"2016-04-01T00:00:00Z","timestamp":1459468800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int. J. Autom. Comput."],"published-print":{"date-parts":[[2016,4]]},"DOI":"10.1007\/s11633-016-0957-7","type":"journal-article","created":{"date-parts":[[2016,3,30]],"date-time":"2016-03-30T22:15:04Z","timestamp":1459376104000},"page":"142-150","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["Water Level Deviation Analysis of Levels Between Two Sides of the Boiler Drum"],"prefix":"10.1007","volume":"13","author":[{"given":"Fei","family":"Xia","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ya-Lei","family":"Quan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Hao","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Dao-Gang","family":"Peng","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2016,4,1]]},"reference":[{"issue":"3","key":"957_CR1","first-page":"44","volume":"30","author":"D. F.Wang","year":"2003","unstructured":"D. F.Wang, P. Han, G. Y.Wang. Predictive functional control for water level of boiler drum. Journal of North China Electric Power University, vol. 30, no. 3, pp. 44\u201347, 2003. (in Chinese)","journal-title":"Journal of North China Electric Power University"},{"issue":"3","key":"957_CR2","first-page":"450","volume":"16","author":"H. J. Liu","year":"2006","unstructured":"H. J. Liu, P. Han, D. F. Wang. Simulation research of DMC-PID cascade for water level system of a drum boiler steam generator. Journal of System Simulation, vol. 16, no. 3, pp. 450\u2013453, 2006. (in Chinese)","journal-title":"Journal of System Simulation"},{"key":"957_CR3","first-page":"6","volume-title":"Boiler Drum Level Measurement System","author":"Z. L. Hou","year":"2005","unstructured":"Z. L. Hou, J. C. Liu. Boiler Drum Level Measurement System, Beijing, China: China Electric Power Publishing House, pp. 6\u20138, 2005. (in Chinese)"},{"issue":"8","key":"957_CR4","doi-asserted-by":"crossref","first-page":"1023","DOI":"10.1016\/j.jprocont.2013.06.004","volume":"23","author":"X. J. Liu","year":"2013","unstructured":"X. J. Liu, X. B. Kong. Nonlinear fuzzy model predictive iterative learning control for drum-type boiler-turbine system. Journal of Process Control, vol. 23, no. 8, pp. 1023\u20131040, 2013.","journal-title":"Journal of Process Control"},{"issue":"18\u201319","key":"957_CR5","doi-asserted-by":"crossref","first-page":"2999","DOI":"10.1016\/j.enconman.2006.03.035","volume":"47","author":"N. H. Yu","year":"2006","unstructured":"N. H. Yu, W. T. Ma, M. Su. Application of adaptive Grey predictor based algorithm to boiler drum level control. Energy Conversion and Management, vol. 47, no. 18\u201319, pp. 2999\u20133007, 2006.","journal-title":"Energy Conversion and Management"},{"issue":"10","key":"957_CR6","doi-asserted-by":"crossref","first-page":"1844","DOI":"10.1016\/j.jprocont.2012.10.003","volume":"22","author":"H. Moradi","year":"2012","unstructured":"H. Moradi, M. Saffar-Avval, F. Bakhtiari-Nejad. Sliding mode control of drum water level in an industrial boiler unit with time varying parameters: A comparison with H \u221e- robust control approach. Journal of Process Control, vol. 22, no. 10, pp. 1844\u20131855, 2012.","journal-title":"Journal of Process Control"},{"issue":"3","key":"957_CR7","doi-asserted-by":"crossref","first-page":"399","DOI":"10.1016\/S0019-0578(07)60212-2","volume":"44","author":"M. Xu","year":"2005","unstructured":"M. Xu, S. Y. Li, W. J. Cai. Cascade generalized predictive control strategy for boiler drum level. ISA Transactions, vol. 44, no. 3, pp. 399\u2013411, 2005.","journal-title":"ISA Transactions"},{"issue":"3","key":"957_CR8","first-page":"56","volume":"24","author":"J. Gao","year":"2003","unstructured":"J. Gao. The study of application of fuzzy drum water level control for boiler. Process Automation Instrumentation, vol. 24, no. 3, pp. 56\u201359, 2003. (in Chinese)","journal-title":"Process Automation Instrumentation"},{"key":"957_CR9","first-page":"252","volume-title":"Proceedings of the 26th Chinese Control Conference","author":"Q. L. Yang","year":"2007","unstructured":"Q. L. Yang, J. C. Xing, P. Wang. Water level control of boiler drum using one IEC61131-3-based DCS. In Proceedings of the 26th Chinese Control Conference, IEEE, Hunan, China, pp. 252\u2013255, 2007."},{"key":"957_CR10","doi-asserted-by":"crossref","first-page":"834","DOI":"10.1016\/j.proeng.2012.01.1109","volume":"31","author":"T. Hong","year":"2012","unstructured":"T. Hong, H. Ni, G. Cheng. Full-scale mathematical model and simulation of marine natural recirculation drum-boiler. Procedia Engineering, vol. 31, pp. 834\u2013843, 2012.","journal-title":"Procedia Engineering"},{"issue":"11","key":"957_CR11","first-page":"989","volume":"29","author":"H. Huang","year":"2009","unstructured":"H. Huang, S. F. Ding, J. Liu. Research on steam drum water level deviation of a 600 MW tangential-firing boiler. Journal of Power Engineering, vol. 29, no. 11, pp. 989\u2013993, 2009.","journal-title":"Journal of Power Engineering"},{"key":"957_CR12","first-page":"21","volume-title":"Twenty Five Key Requirements to Prevent Serious Accident and Failure in Electric Power Operation","author":"State Electric Power Company.","year":"2001","unstructured":"State Electric Power Company. Twenty Five Key Requirements to Prevent Serious Accident and Failure in Electric Power Operation, Beijing, China: China Electric Power Publishing House, pp. 21\u201322, 2001.(in Chinese)"},{"key":"957_CR13","first-page":"52","volume-title":"Materials of Twenty Five Key Requirements to Prevent Serious Accident and Failure in Electric Power Operation","author":"State Electric Power Company.","year":"2001","unstructured":"State Electric Power Company. Materials of Twenty Five Key Requirements to Prevent Serious Accident and Failure in Electric Power Operation, Beijing, China: China Electric Power Publishing House, pp. 52\u201361, 2001. (in Chinese)"},{"issue":"1","key":"957_CR14","doi-asserted-by":"crossref","first-page":"49","DOI":"10.1016\/j.anucene.2010.08.018","volume":"38","author":"D. Hou","year":"2011","unstructured":"D. Hou, M. Lin, Z. H. Xu, Y. H. Yang. Development and application of an extensible engineering simulator for NPP DCS closed-loop test. Annals of Nuclear Energy, vol. 38, no. 1, pp. 49\u201355, 2011.","journal-title":"Annals of Nuclear Energy"},{"issue":"4","key":"957_CR15","doi-asserted-by":"crossref","first-page":"583","DOI":"10.1016\/j.isatra.2007.04.003","volume":"46","author":"P. A. S. Ralston","year":"2007","unstructured":"P. A. S. Ralston, J. H. Graham, J. L. Hieb. Cyber security risk assessment for SCADA and DCS networks. ISA Transactions, vol. 46, no. 4, pp. 583\u2013594, 2007.","journal-title":"ISA Transactions"},{"key":"957_CR16","doi-asserted-by":"crossref","first-page":"92","DOI":"10.1016\/j.sigpro.2013.12.029","volume":"99","author":"S. Yao","year":"2014","unstructured":"S. Yao, S. L. Fang, X. Y.Wang, L. Wang. Parameter estimation for HFM signals using combined STFT and iteratively reweighted least squares linear fitting. Signal Processing, vol. 99, pp. 92\u2013102, 2014.","journal-title":"Signal Processing"},{"issue":"1","key":"957_CR17","doi-asserted-by":"crossref","first-page":"267","DOI":"10.1016\/j.csda.2006.04.036","volume":"51","author":"R. Coppi","year":"2006","unstructured":"R. Coppi, P. D\u2019Urso, P. Giordani, A. Santoro. Least squares estimation of a linear regression model with LR fuzzy response. Computational Statistics & Data Analysis, vol. 51, no. 1, pp. 267\u2013286, 2006.","journal-title":"Computational Statistics & Data Analysis"}],"container-title":["International Journal of Automation and Computing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11633-016-0957-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11633-016-0957-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11633-016-0957-7","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,1]],"date-time":"2019-06-01T14:46:30Z","timestamp":1559400390000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11633-016-0957-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,4]]},"references-count":17,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2016,4]]}},"alternative-id":["957"],"URL":"https:\/\/doi.org\/10.1007\/s11633-016-0957-7","relation":{},"ISSN":["1476-8186","1751-8520"],"issn-type":[{"value":"1476-8186","type":"print"},{"value":"1751-8520","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,4]]}}}