{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,13]],"date-time":"2026-02-13T15:39:20Z","timestamp":1770997160721,"version":"3.50.1"},"reference-count":18,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2007,5,30]],"date-time":"2007-05-30T00:00:00Z","timestamp":1180483200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Prod. Eng. Res. Devel."],"published-print":{"date-parts":[[2007,8,2]]},"DOI":"10.1007\/s11740-007-0011-2","type":"journal-article","created":{"date-parts":[[2007,5,29]],"date-time":"2007-05-29T08:26:50Z","timestamp":1180427210000},"page":"103-111","source":"Crossref","is-referenced-by-count":48,"title":["A controlling system based on cause\u2013effect relationships for the ramp-up of production systems"],"prefix":"10.1007","volume":"1","author":[{"given":"Helge","family":"Winkler","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Michael","family":"Heins","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Peter","family":"Nyhuis","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2007,5,30]]},"reference":[{"key":"11_CR1","first-page":"9","volume-title":"Synchronisation von Produktentwicklung und Produktionsprozess","author":"K Voigt","year":"2005","unstructured":"Voigt K, Thiell M (2005) Fast Ramp-up\u2014Handlungs- und Forschungsfeld f\u00fcr Innovations- und Produktmanagement. In: Wildemann H (ed) Synchronisation von Produktentwicklung und Produktionsprozess, TCW, Munich, pp 9\u201339"},{"key":"11_CR2","unstructured":"Romberg A, Haas M (2005) Der Anlaufmanager. LOG_X, Stuttgart"},{"key":"11_CR3","unstructured":"Fitzek D (2006) Anlaufmanagement in Netzwerken. PhD Thesis, University of St. Gallen"},{"key":"11_CR4","first-page":"91","volume-title":"Synchronisation von Produktentwicklung und Produktionsprozess","author":"W Kersten","year":"2005","unstructured":"Kersten W, Schr\u00f6der K, Zink T (2005) Wissensmanagement zur Optimierung von Produktionsanl\u00e4ufen. In: Wildemann H. (ed) Synchronisation von Produktentwicklung und Produktionsprozess, TCW, Munich, pp 91\u2013110"},{"key":"11_CR5","volume-title":"Betriebsorganisation f\u00fcr Ingenieure","author":"H-P Wiendahl","year":"2005","unstructured":"Wiendahl H-P (2005) Betriebsorganisation f\u00fcr Ingenieure. Carl Hanser, Munich Vienna"},{"key":"11_CR6","unstructured":"Schmahls T (2001) Beitrag zur Effizienzsteigerung w\u00e4hrend Produktionsanl\u00e4ufen in der Automobilindustrie. PhD Thesis, TU Chemnitz"},{"key":"11_CR7","volume-title":"Product development performance\u2014strategy, organization and management in the world auto industry","author":"KB Clark","year":"1991","unstructured":"Clark KB, Fujimoto T (1991) Product development performance\u2014strategy, organization and management in the world auto industry. Harvard Business School, Boston"},{"key":"11_CR8","unstructured":"Schelle H, Reschke H, Schnopp R, Schub A (1994\u20132005) Projekte erfolgreich managen. Loseblattwerk, T\u00dcV, Cologne"},{"key":"11_CR9","volume-title":"Anlaufmanagement\u2014Leitfaden zur Verk\u00fcrzung der Hochlaufzeit und Optimierung der An- und Auslaufphase von Produkten","author":"H Wildemann","year":"2005","unstructured":"Wildemann H (2005) Anlaufmanagement\u2014Leitfaden zur Verk\u00fcrzung der Hochlaufzeit und Optimierung der An- und Auslaufphase von Produkten. TCW, Munich"},{"key":"11_CR10","unstructured":"Heins M, Winkler H, Nyhuis P (2006) Prognosis-based ramp-up management by modelling cause-effect relations integrated in the product life-cycle. In: Proceedings of the 16th CIRP international design seminar, Kananaskis, Canada, July 16\u201319, pp 677\u2013684"},{"key":"11_CR11","unstructured":"Zeugtr\u00e4ger K (1998) Anlaufmanagement f\u00fcr Gro\u00dfanlagen. PhD Thesis, University of Hanover"},{"key":"11_CR12","unstructured":"Nyhuis P, Winkler H (2004) Development of a controlling system for the ramp-up of production systems. In: Proceedings of the international conference on competitive manufacturing 2004, Stellenbosch, South Africa, February 4\u20136, pp 401\u2013406"},{"key":"11_CR13","unstructured":"Risse J (2003) Time-to-market-management in der Automobilindustrie - Ein Gestaltungsrahmen f\u00fcr ein logistikorientiertes Anlaufmanagement. PhD Thesis, University of St. Gallen"},{"key":"11_CR14","unstructured":"Lanza G (2005) Simulationsbasierte Anlaufunterst\u00fctzung auf Basis der Qualit\u00e4tsf\u00e4higkeiten von Produktionsprozessen. PhD Thesis, University of Karlsruhe (TH)"},{"key":"11_CR15","unstructured":"Winkler H (2007) Modellierung vernetzter Wirkbeziehungen im Produktionsanlauf. Not published yet, PhD Thesis, University of Hanover estimated"},{"issue":"4","key":"11_CR16","first-page":"29","volume":"20","author":"J Fleischer","year":"2004","unstructured":"Fleischer J, Wawerla M, Nyhuis P, Winkler H, Liestmann V (2004) Proaktive Anlaufsteuerung von Produktionssystemen entlang der Wertsch\u00f6pfungskette. Industriemanagement 20(4):29\u201332","journal-title":"Industriemanagement"},{"key":"11_CR17","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-662-08418-2","volume-title":"Logistische Kennlinien, Grundlagen, Werkzeuge und Anwendungen","author":"P Nyhuis","year":"2003","unstructured":"Nyhuis P, Wiendahl H-P (2003) Logistische Kennlinien, Grundlagen, Werkzeuge und Anwendungen. Springer, Berlin"},{"key":"11_CR18","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1016\/S0166-218X(98)00054-7","volume":"87","author":"E Levner","year":"1998","unstructured":"Levner E (1998) A parametric critical path problem and an application for cyclic scheduling. Discr Appl Math 87:149\u2013158","journal-title":"Discr Appl Math"}],"container-title":["Production Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-007-0011-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11740-007-0011-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-007-0011-2","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,1]],"date-time":"2019-06-01T21:28:58Z","timestamp":1559424538000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11740-007-0011-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007,5,30]]},"references-count":18,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2007,8,2]]}},"alternative-id":["11"],"URL":"https:\/\/doi.org\/10.1007\/s11740-007-0011-2","relation":{},"ISSN":["0944-6524","1863-7353"],"issn-type":[{"value":"0944-6524","type":"print"},{"value":"1863-7353","type":"electronic"}],"subject":[],"published":{"date-parts":[[2007,5,30]]}}}