{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,29]],"date-time":"2025-10-29T03:21:16Z","timestamp":1761708076077},"reference-count":11,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2007,6,2]],"date-time":"2007-06-02T00:00:00Z","timestamp":1180742400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Prod. Eng. Res. Devel."],"published-print":{"date-parts":[[2007,9,18]]},"DOI":"10.1007\/s11740-007-0012-1","type":"journal-article","created":{"date-parts":[[2007,6,1]],"date-time":"2007-06-01T06:07:21Z","timestamp":1180678041000},"page":"187-192","source":"Crossref","is-referenced-by-count":9,"title":["Business Capabilities as configuration elements of value added networks"],"prefix":"10.1007","volume":"1","author":[{"given":"J\u00fcrgen","family":"Fleischer","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Markus","family":"Herm","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"J\u00f6rg","family":"Ude","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2007,6,2]]},"reference":[{"key":"12_CR1","doi-asserted-by":"crossref","unstructured":"Wiendahl H-P, Lutz S (2002) Production in networks. In: Annals of the CIRP 51\/2","DOI":"10.1016\/S0007-8506(07)61701-6"},{"key":"12_CR2","unstructured":"Franz H-P (2003) Verbundbeziehungen und Komplexit\u00e4t im internationalen Konzern. In: Franz K-P, Hieronimus A (eds) Kostenrechnung im international vernetzten Konzern. Schmalenbachs Zeitschrift f\u00fcr betriebswirtschaftliche Forschung, Sonderheft 49.03 2003, pp 1\u201312"},{"key":"12_CR3","first-page":"1","volume-title":"Real-Time Enterprise\u2014Mit beschleunigten Managementprozessen Zeit und Kosten sparen","author":"F Abolhassan","year":"2003","unstructured":"Abolhassan F (2003) Das real-time enterprise\u2014eine einordnung. In: Scheer A-W Abolhassan F Bosch W (eds) Real-Time Enterprise\u2014Mit beschleunigten Managementprozessen Zeit und Kosten sparen. Springer, Heidelberg pp 1\u20137"},{"key":"12_CR4","volume-title":"Methode zur Optimierung der Wertsch\u00f6pfungskette mittelst\u00e4ndischer Betriebe","author":"O Kramer","year":"2002","unstructured":"Kramer O (2002) Methode zur Optimierung der Wertsch\u00f6pfungskette mittelst\u00e4ndischer Betriebe. Herbert Utz Verlag, M\u00fcnchen"},{"key":"12_CR5","volume-title":"Planung und Betrieb von Logistiknetzwerken","author":"K Alicke","year":"2005","unstructured":"Alicke K (2005) Planung und Betrieb von Logistiknetzwerken. Springer, Heidelberg"},{"key":"12_CR6","unstructured":"M\u00fcller E, Wirth S (2003) Innovative production nets based on a competence cell based network approach. In: Z\u00fclch G et al (eds) Current trends in production management\u2014proceedings of the IFIP WG 5.7 working conference on human aspects in production management, vol 2. Shaker, Aachen pp 268\u2013274"},{"key":"12_CR7","unstructured":"Herm M (2006) Konfiguration globaler Wertsch\u00f6pfungsnetzwerke auf Basis von Business Capabilities. Dissertation Universit\u00e4t Karlsruhe (TH)"},{"key":"12_CR8","unstructured":"DIN EN ISO 9000: Qualit\u00e4tsmanagementsysteme\u2014Grundlagen und Begriffe (ISO 9000:2005) Dreisprachige Fassung ISO 9000:2005. Beuth, Berlin 2005"},{"key":"12_CR9","unstructured":"Fleischer J, Herm M (2005) A Method to configure value added networks based on business capabilities. CIRP-Seminar ISMS 2005, Florianopolis"},{"key":"12_CR10","unstructured":"Sternemann K-H, Homann U (2005) Global manufacturing in networks. IFAC World Congress, Prague"},{"key":"12_CR11","unstructured":"Lanza G, Ude J (2006) A Concept for the configuration of global value added networks based on quality capabilities during ramp-up. 3rd international CIRP seminar on digital enterprise technology, S\u00e9tubal"}],"container-title":["Production Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-007-0012-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11740-007-0012-1\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-007-0012-1","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,1]],"date-time":"2019-06-01T21:28:58Z","timestamp":1559424538000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11740-007-0012-1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007,6,2]]},"references-count":11,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2007,9,18]]}},"alternative-id":["12"],"URL":"https:\/\/doi.org\/10.1007\/s11740-007-0012-1","relation":{},"ISSN":["0944-6524","1863-7353"],"issn-type":[{"value":"0944-6524","type":"print"},{"value":"1863-7353","type":"electronic"}],"subject":[],"published":{"date-parts":[[2007,6,2]]}}}