{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2023,5,14]],"date-time":"2023-05-14T15:40:39Z","timestamp":1684078839992},"reference-count":15,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2007,10,30]],"date-time":"2007-10-30T00:00:00Z","timestamp":1193702400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Prod. Eng. Res. Devel."],"published-print":{"date-parts":[[2007,11,22]]},"DOI":"10.1007\/s11740-007-0058-0","type":"journal-article","created":{"date-parts":[[2007,10,29]],"date-time":"2007-10-29T07:59:38Z","timestamp":1193644778000},"page":"395-400","source":"Crossref","is-referenced-by-count":1,"title":["Interorganizational controlling of production equipment"],"prefix":"10.1007","volume":"1","author":[{"given":"J\u00fcrgen","family":"Fleischer","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Udo","family":"Weismann","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2007,10,30]]},"reference":[{"key":"58_CR1","unstructured":"Stauch V, Nau D (2004) Total cost of ownership (TCO) bei DaimlerChrysler. wbk-Herbsttagung. In: Conference proceedings of life-cycle-performance in production science, Karlsruhe"},{"key":"58_CR2","unstructured":"Krawitz G (2004) Beschaffungsstrategien unter Ber\u00fccksichtigung von Life Cycle Costing. In: VDI-Nachrichten conference, Augsburg"},{"key":"58_CR3","unstructured":"B\u00f6ning M (1997) Einsatzm\u00f6glichkeiten eines Lebenszyklus-orientierten Controllings von Produktionsanlagen. PhD thesis, Ruhr Universit\u00e4t Bochum"},{"key":"58_CR4","unstructured":"Riezler S (1996) Lebenszyklusrechnung; Instrument des Controlling strategischer Projekte, PhD thesis Ruhr Universit\u00e4t Bochum"},{"issue":"10","key":"58_CR5","doi-asserted-by":"crossref","first-page":"553","DOI":"10.37544\/1436-4980-2004-10-553","volume":"94","author":"J Niemann","year":"2004","unstructured":"Niemann J, Westk\u00e4mper E (2004) Dynamisches Life Cycle Controlling von Ganzheitlichen Produktionssystemen mit erfahrungsbasierten Planungsverfahren. wt Werkstatttechnik 94(10):553\u2013557","journal-title":"wt Werkstatttechnik"},{"issue":"7\/8","key":"58_CR6","doi-asserted-by":"crossref","first-page":"472","DOI":"10.37544\/1436-4980-2006-7-8-472","volume":"96","author":"M Steven","year":"2006","unstructured":"Steven M, Wasmuth K (2006) Controlling f\u00fcr hybride Leistungsb\u00fcndel. wt Werkstatttechnik 96(7\/8):472\u2013476","journal-title":"wt Werkstatttechnik"},{"key":"58_CR7","unstructured":"VDI 2893: Auswahl und Bildung von Kennzahlen f\u00fcr die Instandhaltung. VDI, D\u00fcsseldorf 2006"},{"key":"58_CR8","unstructured":"Fleischer J et al. (2004) Life-Cycle-Performance in der Produktionstechnik. In: VDI-Z 146(10):87\u201390"},{"key":"58_CR9","volume-title":"Introduction to TPM: total productiove maintenance","author":"S Nakajima","year":"1988","unstructured":"Nakajima S (1988) Introduction to TPM: total productiove maintenance. Productivity, Cambridge"},{"key":"58_CR10","unstructured":"Nesges, D (2005) Prognose operationeller Verf\u00fcgbarkeiten von Werkzeugmaschinen unter Ber\u00fccksichtigung von Serviceleistungen. PhD thesis Universit\u00e4t Karlsruhe (TH)"},{"key":"58_CR11","volume-title":"Prognosemodell f\u00fcr die Lebenszykluskosten von Maschinen und Anlagen","author":"VDMA 34160","year":"2006","unstructured":"VDMA 34160 (2006) Prognosemodell f\u00fcr die Lebenszykluskosten von Maschinen und Anlagen. VDMA, Frankfurt"},{"key":"58_CR12","unstructured":"DIN IEC 60300-3-3 (1999) Zuverl\u00e4ssigkeitsmanagement, Teil 3: Anwendungsleitfaden, Hauptabschnitt 3: Betrachtung der Lebenszykluskosten. Beuth, Berlin"},{"key":"58_CR13","volume-title":"Beschaffung, Betrieb und Instandhaltung von Produktionsmitteln unter Anwendung von Life Cycle Costing (LCC)","author":"VDI 2884","year":"2003","unstructured":"VDI 2884 (2003) Beschaffung, Betrieb und Instandhaltung von Produktionsmitteln unter Anwendung von Life Cycle Costing (LCC). VDI, D\u00fcsseldorf"},{"key":"58_CR14","unstructured":"Ebner, C (1996) Ganzheitliches Verf\u00fcgbarkeits- und Qualit\u00e4tsmanagement unter Verwendung von Felddaten. PhD thesis University of Munich"},{"issue":"1","key":"58_CR15","doi-asserted-by":"crossref","first-page":"37","DOI":"10.1016\/S0007-8506(07)60525-3","volume":"52","author":"S Takata","year":"2003","unstructured":"Takata S, Kimura T (2003) Life cyclc simulation system for life cycle process planning. Ann CIRP 52(1):37\u201340","journal-title":"Ann CIRP"}],"container-title":["Production Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-007-0058-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11740-007-0058-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-007-0058-0","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,5,14]],"date-time":"2023-05-14T15:18:41Z","timestamp":1684077521000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11740-007-0058-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007,10,30]]},"references-count":15,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2007,11,22]]}},"alternative-id":["58"],"URL":"https:\/\/doi.org\/10.1007\/s11740-007-0058-0","relation":{},"ISSN":["0944-6524","1863-7353"],"issn-type":[{"value":"0944-6524","type":"print"},{"value":"1863-7353","type":"electronic"}],"subject":[],"published":{"date-parts":[[2007,10,30]]}}}