{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,7]],"date-time":"2026-03-07T07:03:47Z","timestamp":1772867027023,"version":"3.50.1"},"reference-count":20,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2007,11,8]],"date-time":"2007-11-08T00:00:00Z","timestamp":1194480000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Prod. Eng. Res. Devel."],"published-print":{"date-parts":[[2007,11,22]]},"DOI":"10.1007\/s11740-007-0066-0","type":"journal-article","created":{"date-parts":[[2007,11,7]],"date-time":"2007-11-07T08:32:18Z","timestamp":1194424338000},"page":"371-379","source":"Crossref","is-referenced-by-count":106,"title":["Economic application of virtual commissioning to mechatronic production systems"],"prefix":"10.1007","volume":"1","author":[{"given":"Gunther","family":"Reinhart","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Georg","family":"W\u00fcnsch","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2007,11,8]]},"reference":[{"key":"66_CR1","unstructured":"Smith BC (1998) World class vehicle launch timing: the conclusion. Automotvie Manufacturing & Production, 11\/98"},{"key":"66_CR2","unstructured":"Wiendahl H-P, Hegenscheidt M, Winkler H (2002) Anlaufrobuste produktionssysteme. wt Werkstattstechnik Jahrgang 92, 2002 H. 11\/12, pp 650\u2013655"},{"key":"66_CR3","unstructured":"Eversheim W, Koerth D, Gentzcke J (1990) Gesellschaft Produktionstechnik: Inbetriebnahme komplexer Maschinen und Anlagen: Strategien und Praxisbeispiele zur Rationalisierung in der Einzel- und Kleinserienproduktion. D\u00fcsseldorf: VDI-Verl"},{"key":"66_CR4","unstructured":"Glas J (1993) Standardisierter Aufbau anwendungsspezifischer Zellenrechnersoftware: mit 80 Abb. Berlin [u.a.]: Springer (iwb-Forschungsberichte; 61)"},{"key":"66_CR5","unstructured":"NN (1997) VDW-Bericht : Abteilungs\u00fcbergreifende Projektierung komplexer Maschinen und Anlagen. Aachen: Verein Deutscher Werkzeugmaschinenhersteller"},{"key":"66_CR6","unstructured":"Bender K, Albert J (1999) Echtzeitsimulation zum Test von Maschinensteuerungen: M\u00fcnchen: Utz (In: Informationstechnik im Maschinenwesen)"},{"key":"66_CR7","doi-asserted-by":"crossref","unstructured":"Isermann R (1997) Mechatronic Systems \u2013 A Challenge for Control Engineering. In: Proceedings of the American Control Conference, Albu-querque, New Mexico, USA","DOI":"10.1109\/ACC.1997.611932"},{"key":"66_CR8","unstructured":"Jayaram M, Chen L (2003) Functional modeling of complex mechatronic systems. In: Proceedings of ASME 2003 design engineering technical conferences and computers and information in engineering conference. 2\u20136 September 2003. Chicago, Illinois, USA"},{"key":"66_CR9","doi-asserted-by":"crossref","first-page":"619","DOI":"10.1007\/s00170-004-1904-2","volume":"25","author":"R-Q Li","year":"2005","unstructured":"Li R-Q, Zou H-J (2005) A new symbolic representation method to support conceptual design of mechatronic system. Int J Adv Manuf Technol 25:619\u2013627","journal-title":"Int J Adv Manuf Technol"},{"issue":"1","key":"66_CR10","first-page":"101","volume":"8","author":"S Qin","year":"2005","unstructured":"Qin S, Harrison R, West AA (2005) Study of 3D simulation modeling for supporting a plug-and-play, distributed control system. Int J Agile Manuf 8(1):101\u2013108","journal-title":"Int J Agile Manuf"},{"key":"66_CR11","doi-asserted-by":"crossref","unstructured":"Pritschow G, Rogers C, R\u00f6ck S (2002) Echtzeitf\u00e4hige Maschinenmodelle. wt Werkstattstechnik Jahrgang 92, 2002 H. 5, pp 187\u2013193","DOI":"10.37544\/1436-4980-2002-5-187"},{"issue":"1","key":"66_CR12","doi-asserted-by":"crossref","first-page":"51","DOI":"10.1142\/S0219686702000064","volume":"1","author":"U Dietrich","year":"2002","unstructured":"Dietrich U, Schulz T, Yaramanoglu N (2002) Bringing real and virtual worlds together in the manufacturing process. J Adv Manuf 1(1):51\u201365","journal-title":"J Adv Manuf"},{"key":"66_CR13","unstructured":"Berger A (2005) Virtuelle Inbetriebnahme eines Bearbeitungszentrums. In: Zaeh MF, Reinhart G (Hrsg.): Seminarberichte iwb 78: Mechatronik\u2014Trends in der interdisziplin\u00e4ren Entwicklung von Werkzeugmaschinen. M\u00fcnchen: Utz 2005"},{"key":"66_CR14","unstructured":"Heinrich S, Wortmann D (2004) Virtuelle Inbetriebnahme: Entwicklung von Layout- und Steuerungskonzepten mit Hilfe von Simulation. In: 2. Symposium, \u201cDigitale Fabrik\u201d, Leipzig, Juni"},{"key":"66_CR15","unstructured":"R\u00f6mberg S (2004) Virtuelle Inbetriebnahme:Innovative Entwicklungen im Bereich der Digitalen Fabrik. In: 2. Symposium \u201cDigitale Fabrik\u201d, Leipzig, Juni 2004"},{"issue":"1","key":"66_CR16","doi-asserted-by":"crossref","first-page":"19","DOI":"10.1023\/A:1008040622456","volume":"11","author":"D Zhang","year":"1999","unstructured":"Zhang D, Zhang H-C (1999) A simulation study of an object-oriented integration test bed for process planning and production scheduling. Int J Flexible Manuf Syst 11(1):19\u201335","journal-title":"Int J Flexible Manuf Syst"},{"key":"66_CR17","doi-asserted-by":"crossref","unstructured":"Z\u00e4h MF, W\u00fcnsch G, P\u00f6rnbacher, C, Ehrenstrasser M (2003) Emerging virtual machine tools. In: 29th design automation conference. Chicago, Illinois","DOI":"10.1115\/DETC2003\/DAC-48756"},{"issue":"1","key":"66_CR18","doi-asserted-by":"crossref","first-page":"67","DOI":"10.1142\/S0219686702000076","volume":"1","author":"B-K Min","year":"2002","unstructured":"Min B-K, Huang Z, Pasek ZJ, Yip-Hoi D, Husted F, Marker S (2002) Integration of real-time control simulation to a virtual manufacturing environment. Int J Adv Manuf Syst 1(1):67\u201387, Special Issue on Virtual Manufacturing","journal-title":"Int J Adv Manuf Syst"},{"key":"66_CR19","doi-asserted-by":"crossref","unstructured":"Milberg J (1992) Von CAD\/CAM zu CIM: Leitfaden zum Erfolg, Berlin [u.a.], Springer (CIM-Fachmann)","DOI":"10.1007\/978-3-662-01067-9"},{"key":"66_CR20","doi-asserted-by":"crossref","unstructured":"Z\u00e4h MF, W\u00fcnsch G, Hensel T, Lindworsky A (2006) Nutzen der virtuellen Inbetriebnahme: Ein Experiment. ZWF-Zeitschrift f\u00fcr wirtschaftlichen Fabrikbetrieb 101(10)","DOI":"10.3139\/104.101070"}],"container-title":["Production Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-007-0066-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11740-007-0066-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-007-0066-0","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,5,14]],"date-time":"2023-05-14T16:51:07Z","timestamp":1684083067000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11740-007-0066-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007,11,8]]},"references-count":20,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2007,11,22]]}},"alternative-id":["66"],"URL":"https:\/\/doi.org\/10.1007\/s11740-007-0066-0","relation":{},"ISSN":["0944-6524","1863-7353"],"issn-type":[{"value":"0944-6524","type":"print"},{"value":"1863-7353","type":"electronic"}],"subject":[],"published":{"date-parts":[[2007,11,8]]}}}