{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,22]],"date-time":"2026-04-22T20:07:34Z","timestamp":1776888454163,"version":"3.51.2"},"reference-count":16,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2009,12,9]],"date-time":"2009-12-09T00:00:00Z","timestamp":1260316800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Prod. Eng. Res. Devel."],"published-print":{"date-parts":[[2010,2]]},"DOI":"10.1007\/s11740-009-0200-2","type":"journal-article","created":{"date-parts":[[2009,12,8]],"date-time":"2009-12-08T18:57:12Z","timestamp":1260298632000},"page":"85-94","source":"Crossref","is-referenced-by-count":11,"title":["Reconfiguring flexible machine modules of a PCB assembly line"],"prefix":"10.1007","volume":"4","author":[{"given":"Attila","family":"T\u00f3th","sequence":"first","affiliation":[]},{"given":"Timo","family":"Knuutila","sequence":"additional","affiliation":[]},{"given":"Olli S.","family":"Nevalainen","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2009,12,9]]},"reference":[{"issue":"3","key":"200_CR1","doi-asserted-by":"crossref","first-page":"893","DOI":"10.1016\/j.ejor.2007.03.042","volume":"186","author":"M Ayob","year":"2208","unstructured":"Ayob M, Kendal G (2208) A survey of surface mount device placement optimization: machine classification. Eur J Oper Res 186(3):893\u2013914","journal-title":"Eur J Oper Res"},{"key":"200_CR2","unstructured":"Ho W, Ji P (2006) Optimal production planning for PCB assembly in Springer Series in Advanced Manufacturing"},{"key":"200_CR3","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1016\/S0736-5845(98)00034-9","volume":"15","author":"J Smed","year":"1999","unstructured":"Smed J, Johnsson M, Puranen M, Leipala T, Nevalainen O (1999) Job grouping in surface mounted component printing. Robot Comput Aided Manuf 15:39\u201349","journal-title":"Robot Comput Aided Manuf"},{"key":"200_CR4","volume-title":"Scheduling: theory, algorithms, and systems","author":"ML Pinedo","year":"2008","unstructured":"Pinedo ML (2008) Scheduling: theory, algorithms, and systems. Springer, New York"},{"issue":"5","key":"200_CR5","doi-asserted-by":"crossref","first-page":"497","DOI":"10.1080\/09537280050051997","volume":"11","author":"T Hayrinen","year":"2000","unstructured":"Hayrinen T, Johnsson M, Johtela T, Smed J, Nevalainen O (2000) Scheduling algorithms for computer-aided line balancing in printed circuit board assembly. Prod Plan Control 11(5):497\u2013510","journal-title":"Prod Plan Control"},{"issue":"1","key":"200_CR6","doi-asserted-by":"crossref","first-page":"55","DOI":"10.1108\/01445150110381745","volume":"21","author":"MT Sze","year":"2001","unstructured":"Sze MT, Ji P, Lee WB (2001) Modeling the component assignment problem in PCB assembly. Assem Autom 21(1):55\u201360","journal-title":"Assem Autom"},{"issue":"23","key":"200_CR7","doi-asserted-by":"crossref","first-page":"5031","DOI":"10.1080\/00207540412331285814","volume":"42","author":"DM Kodek","year":"2004","unstructured":"Kodek DM, Krisper M (2004) Optimal algorithm for minimizing production cycle time of a printed circuit board assembly line. Int J Prod Res 42(23):5031\u20135048","journal-title":"Int J Prod Res"},{"key":"200_CR8","first-page":"547","volume":"33","author":"MS Hillier","year":"2001","unstructured":"Hillier MS, Brandeau ML (2001) Cost minimization and workload balancing in printed circuit board assembly. IIE Trans 33:547\u2013557","journal-title":"IIE Trans"},{"issue":"1","key":"200_CR9","doi-asserted-by":"crossref","first-page":"67","DOI":"10.31671\/dogus.2019.285","volume":"6","author":"E Duman","year":"2005","unstructured":"Duman E, Yildirim MB (2005) Workload balancing in printed circuit board assembly shops. Dogus Univ J 6(1):67\u201378","journal-title":"Dogus Univ J"},{"issue":"3","key":"200_CR10","doi-asserted-by":"crossref","first-page":"236","DOI":"10.1108\/EUM0000000005619","volume":"21","author":"YF Wan","year":"2001","unstructured":"Wan YF, Ji P (2001) A tabu search heuristic for the component assignment problem in PCB assembly. Assem Autom 21(3):236\u2013240","journal-title":"Assem Autom"},{"key":"200_CR11","unstructured":"Ho W, Ji P (2007) The line assignment and the component allocation problems, optimal production planning for PCB assembly, Springer Series in Advanced Manufacturing, pp\u00a085\u2013108"},{"issue":"2\/3","key":"200_CR12","doi-asserted-by":"crossref","first-page":"92","DOI":"10.1007\/s00366-003-0256-0","volume":"19","author":"LP Khoo","year":"2003","unstructured":"Khoo LP, Alisantoso D (2003) Line balancing of PCB assembly line using immune algorithms. Eng Comput 19(2\/3):92\u2013100","journal-title":"Eng Comput"},{"key":"200_CR13","doi-asserted-by":"crossref","unstructured":"Bazaraa MS, Sherali HD, Shetty CM (2006) Nonlinear programming: theory and algorithms, 3rd Edition","DOI":"10.1002\/0471787779"},{"issue":"5","key":"200_CR14","doi-asserted-by":"crossref","first-page":"549","DOI":"10.1287\/mnsc.39.5.549","volume":"39","author":"AE Gray","year":"1993","unstructured":"Gray AE, Seidmann A, Stecke KE (1993) A synthesis of decision models for tool management in automated manufacturing. Manage Sci 39(5):549\u2013567","journal-title":"Manage Sci"},{"key":"200_CR15","volume-title":"Genetic algorithms\u00a0+\u00a0data structures\u00a0=\u00a0evolution programs","author":"Z Michalewicz","year":"1996","unstructured":"Michalewicz Z (1996) Genetic algorithms\u00a0+\u00a0data structures\u00a0=\u00a0evolution programs, 3rd edn. Springer, Berlin","edition":"3"},{"issue":"2","key":"200_CR16","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1142\/S0960313102000400","volume":"11","author":"T Laakso","year":"2002","unstructured":"Laakso T, Johnsson M, Johtela T, Smed J, Nevalainen O (2002) Estimating the production time in PCB assembly. J Electron Manuf 11(2):161\u2013170","journal-title":"J Electron Manuf"}],"container-title":["Production Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-009-0200-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11740-009-0200-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-009-0200-2","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,1]],"date-time":"2019-06-01T21:32:06Z","timestamp":1559424726000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11740-009-0200-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009,12,9]]},"references-count":16,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2010,2]]}},"alternative-id":["200"],"URL":"https:\/\/doi.org\/10.1007\/s11740-009-0200-2","relation":{},"ISSN":["0944-6524","1863-7353"],"issn-type":[{"value":"0944-6524","type":"print"},{"value":"1863-7353","type":"electronic"}],"subject":[],"published":{"date-parts":[[2009,12,9]]}}}