{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,3,31]],"date-time":"2022-03-31T15:44:23Z","timestamp":1648741463520},"reference-count":14,"publisher":"Springer Science and Business Media LLC","issue":"4-5","license":[{"start":{"date-parts":[[2012,7,13]],"date-time":"2012-07-13T00:00:00Z","timestamp":1342137600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Prod. Eng. Res. Devel."],"published-print":{"date-parts":[[2012,9]]},"DOI":"10.1007\/s11740-012-0403-9","type":"journal-article","created":{"date-parts":[[2012,7,13]],"date-time":"2012-07-13T19:18:09Z","timestamp":1342207089000},"page":"449-458","source":"Crossref","is-referenced-by-count":3,"title":["Model based logistic monitoring for supply and assembly processes"],"prefix":"10.1007","volume":"6","author":[{"given":"Ben","family":"M\u00fcnzberg","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Matthias","family":"Schmidt","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Sebastian","family":"Beck","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Peter","family":"Nyhuis","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2012,7,13]]},"reference":[{"key":"403_CR1","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1007\/978-3-642-56438-3_1","volume-title":"Montageplanung: Effizient und marktgerecht","author":"L M\u00e4rz","year":"2001","unstructured":"M\u00e4rz L, Langsdorff PV (2001) Flexibilit\u00e4t und Marktorientierung in der Montage. In: Westk\u00e4mper E (ed) Montageplanung: Effizient und marktgerecht. Springer, Berlin, pp 3\u201310"},{"key":"403_CR2","unstructured":"Stolz NW (1988) Materialbereitstellung in der Montage: ein Beitr. zum Aufbau einer anforderungsgerechten Materialbewirtschaftung der Montage in Unternehmen mit Einzel- und Kleinserienproduktion, Aachen"},{"key":"403_CR3","doi-asserted-by":"crossref","DOI":"10.1007\/3-540-36669-5","volume-title":"Montage in der industriellen Produktion: Ein Handbuch f\u00fcr die Praxis","author":"B Lotter","year":"2006","unstructured":"Lotter B, Wiendahl H-P (2006) Montage in der industriellen Produktion: Ein Handbuch f\u00fcr die Praxis. Springer, Berlin Heidelberg"},{"key":"403_CR4","unstructured":"Deutsches Institut f\u00fcr Normung e.V (2007) Projektwirtschaft, Netzplantechnik, Beschreibungen und Begriffe, Berlin, Cologne (69900)"},{"key":"403_CR5","unstructured":"Spur G (ed) (1986) F\u00fcgen, handhaben und montieren: Mit 144 Tabellen"},{"key":"403_CR6","volume-title":"Organizing for work","author":"HL Gantt","year":"1919","unstructured":"Gantt HL (1919) Organizing for work. Harcourt Brace and Howe, New York"},{"key":"403_CR7","volume-title":"Integration von Produktionslogistik und Montageplanung und -steuerung","author":"H Esser","year":"1996","unstructured":"Esser H (1996) Integration von Produktionslogistik und Montageplanung und -steuerung. Shaker, Aachen"},{"key":"403_CR8","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-540-34211-3","volume-title":"Fundamentals of production logistics: theory, tools and applications; with 6 tables","author":"P Nyhuis","year":"2009","unstructured":"Nyhuis P, Wiendahl H-P (2009) Fundamentals of production logistics: theory, tools and applications; with 6 tables. Springer, Berlin"},{"key":"403_CR9","unstructured":"Schmidt M, Berkholz D, Nyhuis P (2008) Modeling of logistic processes in assembly areas, Proceedings of World congress of engineering and computer science, pp 1067\u20131072"},{"key":"403_CR10","volume-title":"Fertigungsregelung: Logistische Beherrschung von Fertigungsabl\u00e4ufen auf Basis des Trichtermodells; 42 Tabellen","author":"H-P Wiendahl","year":"1997","unstructured":"Wiendahl H-P (1997) Fertigungsregelung: Logistische Beherrschung von Fertigungsabl\u00e4ufen auf Basis des Trichtermodells; 42 Tabellen. Hanser, M\u00fcnchen"},{"key":"403_CR11","doi-asserted-by":"crossref","unstructured":"Nyhuis P, Nickel R, Busse T (2006) Logistisches Controlling der Materialverf\u00fcgbarkeit mit Bereitstellungsdiagrammen. Zeitschrift f\u00fcr wirtschaftlichen Fabrikbetrieb 101(5):265\u2013268","DOI":"10.3139\/104.101015"},{"key":"403_CR12","unstructured":"Kettner H (1976) Neue Wege der Bestandsanalyse im Fertigungsbereich: Methodik praktische Beispiele EDV-Programmsystem, Arbeitsausschu\u00df Fertigungswirtschaft (AFW) d. Dt. Ges. f. Betriebswirtschaft (DGfB), Hannover"},{"key":"403_CR13","unstructured":"Schmidt M (2011) Modellierung logistischer Prozesse der Montage, PZH Produktionstechnisches Zentrum GmbH, Garbsen"},{"key":"403_CR14","unstructured":"Beck S, Schmidt M, Nyhuis P (2001) Controlling the time synchronicity of convergent supply processes, Proceedings of the World congress on engineering and computer science"}],"container-title":["Production Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-012-0403-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11740-012-0403-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-012-0403-9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,30]],"date-time":"2019-06-30T22:19:46Z","timestamp":1561933186000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11740-012-0403-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,7,13]]},"references-count":14,"journal-issue":{"issue":"4-5","published-print":{"date-parts":[[2012,9]]}},"alternative-id":["403"],"URL":"https:\/\/doi.org\/10.1007\/s11740-012-0403-9","relation":{},"ISSN":["0944-6524","1863-7353"],"issn-type":[{"value":"0944-6524","type":"print"},{"value":"1863-7353","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,7,13]]}}}