{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2023,2,27]],"date-time":"2023-02-27T12:18:20Z","timestamp":1677500300131},"reference-count":18,"publisher":"Springer Science and Business Media LLC","issue":"1-2","license":[{"start":{"date-parts":[[2013,12,3]],"date-time":"2013-12-03T00:00:00Z","timestamp":1386028800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Prod. Eng. Res. Devel."],"published-print":{"date-parts":[[2014,3]]},"DOI":"10.1007\/s11740-013-0515-x","type":"journal-article","created":{"date-parts":[[2013,12,2]],"date-time":"2013-12-02T02:15:02Z","timestamp":1385950502000},"page":"165-173","source":"Crossref","is-referenced-by-count":1,"title":["Time-oriented pricing for the tool and mould manufacturing industry"],"prefix":"10.1007","volume":"8","author":[{"given":"A.","family":"Nemeti","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"B.","family":"Denkena","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2013,12,3]]},"reference":[{"key":"515_CR1","unstructured":"Sch\u00fcrmeyer J (2011) Interdependenzorientierte Angebotskalkulation f\u00fcr den Werkzeug- und Formenbau. Dissertation, Leibniz Universit\u00e4t Hannover"},{"issue":"5","key":"515_CR2","doi-asserted-by":"crossref","first-page":"515","DOI":"10.1007\/s11740-010-0231-8","volume":"4","author":"C Rimpau","year":"2010","unstructured":"Rimpau C (2010) Knowledge-based risk evaluation during the offer calculation of customised products. Prod Eng Res Dev (WGP) 4(5):515\u2013524","journal-title":"Prod Eng Res Dev (WGP)"},{"key":"515_CR3","unstructured":"Eversheim W et al (1997) Was kostet die Werkzeugkonstruktion. VDI-Z, Special Werkzeuge, pp 52\u201356"},{"key":"515_CR4","unstructured":"Sch\u00e4le M (1990) Erstellung und Bewertung von Konzepten zur rechnerintegrierten Produktion im Werkzeugbau, Dissertation, Universit\u00e4t Hannover"},{"key":"515_CR5","volume-title":"VDI-Richtlinie 2234","author":"Verein Deutscher Ingenieure","year":"1990","unstructured":"Verein Deutscher Ingenieure (1990) VDI-Richtlinie 2234. D\u00fcsseldorf, Beuth Verlag, Berlin"},{"key":"515_CR6","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-662-05741-4","volume-title":"Angebots- und Projektkalkulation: Leitfaden f\u00fcr Praktiker. VDI-Buch","author":"A Bronner","year":"1998","unstructured":"Bronner A (1998) Angebots- und Projektkalkulation: Leitfaden f\u00fcr Praktiker. VDI-Buch, 2nd edn. Springer, Berlin","edition":"2"},{"key":"515_CR7","first-page":"1016","volume":"105","author":"MA Askri","year":"2010","unstructured":"Askri MA, Overmeyer L (2010) Funktionsbasierte Strukturen in der Angebotskalkulation. ZFW, Jahrgang 105:1016\u20131022","journal-title":"ZFW, Jahrgang"},{"key":"515_CR8","volume-title":"Angebotsbearbeitung \u2013 Schnittstelle zwischen Kunden und Lieferanten","author":"VDI-Gesellschaft Entwicklung Konstruktion Vertrieb","year":"1999","unstructured":"VDI-Gesellschaft Entwicklung Konstruktion Vertrieb (1999) Angebotsbearbeitung \u2013 Schnittstelle zwischen Kunden und Lieferanten. Springer, Berlin"},{"key":"515_CR9","unstructured":"Brunkhorst U (1995) Integrierte Angebots- und Auftragsplanung im Werkzeug- und Formenbau. Dissertation, Universit\u00e4t Hannover"},{"key":"515_CR10","unstructured":"T\u00fcmis S (1988) Entwicklung eines kostenorientierten Planungssystems f\u00fcr den rechnerintegrierten Werkzeug- und Formenbau, Dissertation, Technische Universit\u00e4t Berlin"},{"key":"515_CR11","unstructured":"Westekemper M (2002) Methodik zur Angebotspreisbildung \u2013 am Beispiel des Werkzeug- und Formenbaus. Dissertation, RWTH Aachen"},{"key":"515_CR12","unstructured":"Giannoulis D (2006) Modellgest\u00fctzte Montage-kostenprognose f\u00fcr die Einzel- und Kleinserienfertigung im Maschinenbau. Dissertation, Ruhr-Universit\u00e4t Bochum"},{"key":"515_CR13","unstructured":"Neff T (2002) Front Load Coasting - Produktionskostenmanagement auf der Basis unvollkommener Informationen. Deutscher Universit\u00e4ts Verlag (DUV), Gabler Edition Wissenschaft Wiesbaden"},{"key":"515_CR14","doi-asserted-by":"crossref","first-page":"1138","DOI":"10.1007\/s00170-004-2084-9","volume":"26","author":"B Nagahanumaiah","year":"2005","unstructured":"Nagahanumaiah B, Mukherjee NP (2005) An integrated framework for die and mold cost estimation using features and tooling parameters. Int J Adv Manuf Technol 26:1138\u20131149","journal-title":"Int J Adv Manuf Technol"},{"key":"515_CR15","unstructured":"Petzold J (2008) Verbesserung der Datenqualit\u00e4t in der Vorkalkulation des Werkzeug- und Formenbaus. Dissertation, Leibniz Universit\u00e4t Hannover"},{"key":"515_CR16","unstructured":"Homburg C, Karlshaus JT (1999) Kostenrechnung in mittest\u00e4ndischen und gro\u00dfen Unternehmen \u2013 ein Vergleich. In: Weber J (ed) Kostenrechnung im Mittelstand, krp Sonderheft 2\/99, pp 73\u201380"},{"key":"515_CR17","unstructured":"http:\/\/www.lme.com\/en-gb\/metals\/non-ferrous\/aluminium\/ , 20.06.13"},{"key":"515_CR18","first-page":"229","volume":"13","author":"A Soukhoroukova","year":"2005","unstructured":"Soukhoroukova A (2005) Flexible Software-Architektur f\u00fcr Prognosem\u00e4rkte. Wirtschaft-informatik Proceedings 2005. Paper 13:229\u2013250","journal-title":"Paper"}],"container-title":["Production Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-013-0515-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11740-013-0515-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-013-0515-x","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,1]],"date-time":"2019-06-01T21:32:11Z","timestamp":1559424731000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11740-013-0515-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,12,3]]},"references-count":18,"journal-issue":{"issue":"1-2","published-print":{"date-parts":[[2014,3]]}},"alternative-id":["515"],"URL":"https:\/\/doi.org\/10.1007\/s11740-013-0515-x","relation":{},"ISSN":["0944-6524","1863-7353"],"issn-type":[{"value":"0944-6524","type":"print"},{"value":"1863-7353","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,12,3]]}}}