{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,13]],"date-time":"2026-02-13T18:43:59Z","timestamp":1771008239095,"version":"3.50.1"},"reference-count":8,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2015,3,8]],"date-time":"2015-03-08T00:00:00Z","timestamp":1425772800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Prod. Eng. Res. Devel."],"published-print":{"date-parts":[[2015,8]]},"DOI":"10.1007\/s11740-015-0605-z","type":"journal-article","created":{"date-parts":[[2015,3,7]],"date-time":"2015-03-07T14:29:42Z","timestamp":1425738582000},"page":"377-391","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":6,"title":["Dynamic job shop scheduling with fixed interval deliveries"],"prefix":"10.1007","volume":"9","author":[{"given":"Cheng-Hsiang","family":"Liu","sequence":"first","affiliation":[]},{"given":"Cheng-I","family":"Hsu","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2015,3,8]]},"reference":[{"issue":"4","key":"605_CR1","doi-asserted-by":"crossref","first-page":"296","DOI":"10.1111\/j.1937-5956.1994.tb00126.x","volume":"3","author":"S Chand","year":"1994","unstructured":"Chand S, Chhajed D, Traub R (1994) A single-machine scheduling model with fixed-interval deliveries. Prod Oper Manag 3(4):296\u2013307","journal-title":"Prod Oper Manag"},{"issue":"2","key":"605_CR2","doi-asserted-by":"crossref","first-page":"385","DOI":"10.1016\/0377-2217(93)E0291-5","volume":"84","author":"D Chhajed","year":"1995","unstructured":"Chhajed D (1995) A fixed interval due-date scheduling problem with earliness and due-date costs. Eur J Oper Res 84(2):385\u2013401","journal-title":"Eur J Oper Res"},{"key":"605_CR3","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1016\/j.tcs.2011.11.035","volume":"422","author":"B Fu","year":"2012","unstructured":"Fu B, Huo Y, Zhao H (2012) Coordinated scheduling of production and delivery with production window and delivery capacity constraints. Theoret Comput Sci 422:39\u201351","journal-title":"Theoret Comput Sci"},{"issue":"1","key":"605_CR4","doi-asserted-by":"crossref","first-page":"134","DOI":"10.1287\/opre.49.1.134.11192","volume":"49","author":"NG Hall","year":"2001","unstructured":"Hall NG, Lesaoana M, Potts CN (2001) Scheduling with fixed delivery dates. Oper Res 49(1):134\u2013144","journal-title":"Oper Res"},{"issue":"1\u20132","key":"605_CR5","doi-asserted-by":"crossref","first-page":"101","DOI":"10.1016\/0166-218X(95)00049-W","volume":"68","author":"C-Y Lee","year":"1996","unstructured":"Lee C-Y, Li C-L (1996) On the fixed interval due-date scheduling problem. Discrete Appl Math 68(1\u20132):101\u2013117","journal-title":"Discrete Appl Math"},{"key":"605_CR6","unstructured":"Lesaoana M (1991) Scheduling with fixed delivery dates. Ph.D. Thesis, University of Southampton"},{"issue":"2","key":"605_CR7","doi-asserted-by":"crossref","first-page":"293","DOI":"10.1287\/opre.36.2.293","volume":"36","author":"H Matsuo","year":"1988","unstructured":"Matsuo H (1988) The weighted total tardiness problem with fixed shipping times and overtime utilization. Oper Res 36(2):293\u2013307","journal-title":"Oper Res"},{"issue":"2","key":"605_CR8","doi-asserted-by":"crossref","first-page":"451","DOI":"10.1016\/j.cie.2011.10.010","volume":"62","author":"X Wang","year":"2012","unstructured":"Wang X, Cheng TCE (2012) Performance bound analysis of a heuristic for the total weighted flowtime problem with fixed delivery dates. Comput Ind Eng 62(2):451\u2013456","journal-title":"Comput Ind Eng"}],"container-title":["Production Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-015-0605-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11740-015-0605-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-015-0605-z","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,1]],"date-time":"2019-06-01T21:32:13Z","timestamp":1559424733000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11740-015-0605-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,3,8]]},"references-count":8,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2015,8]]}},"alternative-id":["605"],"URL":"https:\/\/doi.org\/10.1007\/s11740-015-0605-z","relation":{},"ISSN":["0944-6524","1863-7353"],"issn-type":[{"value":"0944-6524","type":"print"},{"value":"1863-7353","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,3,8]]}}}