{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,4]],"date-time":"2026-02-04T15:54:32Z","timestamp":1770220472523,"version":"3.49.0"},"reference-count":21,"publisher":"Springer Science and Business Media LLC","issue":"5-6","license":[{"start":{"date-parts":[[2015,10,5]],"date-time":"2015-10-05T00:00:00Z","timestamp":1444003200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Prod. Eng. Res. Devel."],"published-print":{"date-parts":[[2015,12]]},"DOI":"10.1007\/s11740-015-0639-2","type":"journal-article","created":{"date-parts":[[2015,10,5]],"date-time":"2015-10-05T08:29:57Z","timestamp":1444033797000},"page":"655-664","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":7,"title":["Workload control policies under continuous order release"],"prefix":"10.1007","volume":"9","author":[{"given":"Paolo","family":"Renna","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2015,10,5]]},"reference":[{"issue":"2","key":"639_CR1","doi-asserted-by":"crossref","first-page":"259","DOI":"10.1111\/j.1937-5956.2002.tb00495.x","volume":"11","author":"JB Atwater","year":"2002","unstructured":"Atwater JB, Chakravorty SS (2002) A study of the utilization of capacity constrained resources in drum-buffer-rope systems. Prod Oper Manag 11(2):259\u2013273","journal-title":"Prod Oper Manag"},{"key":"639_CR2","doi-asserted-by":"crossref","first-page":"665","DOI":"10.1080\/0953728021000026276","volume":"13","author":"JWM Bertrand","year":"2002","unstructured":"Bertrand JWM, Van Ooijen HPG (2002) Workload based order release and productivity: a missing link. Prod Plan Control 13:665\u2013678","journal-title":"Prod Plan Control"},{"issue":"4","key":"639_CR3","doi-asserted-by":"crossref","first-page":"416","DOI":"10.1080\/09537280110121091","volume":"13","author":"JH Blackstone","year":"2002","unstructured":"Blackstone JH, Cox JF (2002) Designing unbalanced lines\u2014understanding protective capacity and protective inventory. Prod Plan Control 13(4):416\u2013423","journal-title":"Prod Plan Control"},{"issue":"7","key":"639_CR4","doi-asserted-by":"crossref","first-page":"625","DOI":"10.1080\/0953728021000026230","volume":"13","author":"JW Breithaupt","year":"2002","unstructured":"Breithaupt JW, Land J, Nyhuis P (2002) The workload control concept: theory and practical extensions of load oriented order release. Prod Plan Control 13(7):625\u2013638","journal-title":"Prod Plan Control"},{"key":"639_CR5","doi-asserted-by":"crossref","unstructured":"Centeno MA, Reyes MF (1998) So you have your model: what to do next a tutorial on simulation output analysis. In: Proceedings of the 1998 winter simulation conference 1998","DOI":"10.1109\/WSC.1998.744894"},{"key":"639_CR6","doi-asserted-by":"crossref","first-page":"257","DOI":"10.1016\/j.ijpe.2010.09.026","volume":"131","author":"NO Fernandes","year":"2011","unstructured":"Fernandes NO, Carmo-Silva S (2011) Workload control under continuous order release. Int J Prod Econ 131:257\u2013262","journal-title":"Int J Prod Econ"},{"issue":"3","key":"639_CR7","doi-asserted-by":"crossref","first-page":"679","DOI":"10.1080\/00207543.2013.827808","volume":"52","author":"NO Fernandes","year":"2014","unstructured":"Fernandes NO, Land MJ, Carmo-Silva S (2014) Workload control in unbalanced job shops. Int J Prod Res 52(3):679\u2013690","journal-title":"Int J Prod Res"},{"key":"639_CR8","doi-asserted-by":"crossref","first-page":"99","DOI":"10.1016\/j.ejor.2009.02.003","volume":"201","author":"LD Fredendall","year":"2010","unstructured":"Fredendall LD, Divesh O, Patterson JW (2010) Concerning the theory of workload control. Eur J Oper Res 201:99\u2013111","journal-title":"Eur J Oper Res"},{"key":"639_CR9","doi-asserted-by":"crossref","first-page":"535","DOI":"10.1016\/S0925-5273(96)00088-6","volume":"46\u201347","author":"MJ Land","year":"1996","unstructured":"Land MJ, Gaalman GJC (1996) Workload control concepts in job shops: a critical assessment. Int J Prod Econ 46\u201347:535\u2013538","journal-title":"Int J Prod Econ"},{"issue":"7","key":"639_CR10","doi-asserted-by":"crossref","first-page":"1081","DOI":"10.1080\/00207548908942609","volume":"27","author":"SA Melnyk","year":"1989","unstructured":"Melnyk SA, Ragatz GL (1989) Order review\/release: research issues and perspectives. Int J Prod Res 27(7):1081\u20131096","journal-title":"Int J Prod Res"},{"issue":"2","key":"639_CR11","doi-asserted-by":"crossref","first-page":"387","DOI":"10.1016\/j.ijpe.2008.11.014","volume":"118","author":"H Missbauer","year":"2009","unstructured":"Missbauer H (2009) Models of the transient behaviour of production units to optimize the aggregate material flow. Int J Prod Econ 118(2):387\u2013397","journal-title":"Int J Prod Econ"},{"issue":"1","key":"639_CR12","doi-asserted-by":"crossref","first-page":"107","DOI":"10.1016\/S0925-5273(99)00141-3","volume":"68","author":"BJ Oosterman","year":"2000","unstructured":"Oosterman BJ, Land MJ, Gaalman GJC (2000) The influence of shop characteristics on workload control. Int J Prod Econ 68(1):107\u2013119","journal-title":"Int J Prod Econ"},{"issue":"5","key":"639_CR13","doi-asserted-by":"crossref","first-page":"869","DOI":"10.1080\/0020754042000298520","volume":"43","author":"M Stevenson","year":"2005","unstructured":"Stevenson M, Hendry LC, Kingsman BG (2005) A review of production planning and control: the applicability of key concepts to the make-to-order industry. Int J Prod Res 43(5):869\u2013898","journal-title":"Int J Prod Res"},{"issue":"11","key":"639_CR14","doi-asserted-by":"crossref","first-page":"3107","DOI":"10.1080\/00207540601039791","volume":"46","author":"M Stevenson","year":"2008","unstructured":"Stevenson M, Silva C (2008) Theoretical development of workload control methodology: evidence from two case studies. Int J Prod Res 46(11):3107\u20133131","journal-title":"Int J Prod Res"},{"issue":"22","key":"639_CR15","doi-asserted-by":"crossref","first-page":"6419","DOI":"10.1080\/00207543.2011.648275","volume":"50","author":"M Th\u00fcrer","year":"2012","unstructured":"Th\u00fcrer M, Silva C, Stevenson M, Land MJ (2012) Improving the applicability of workload control: the influence of sequence dependent set-up times on workload controlled job shops. Int J Prod Res 50(22):6419\u20136430","journal-title":"Int J Prod Res"},{"issue":"7","key":"639_CR16","doi-asserted-by":"crossref","first-page":"603","DOI":"10.1080\/09537287.2012.735801","volume":"25","author":"M Th\u00fcrer","year":"2014","unstructured":"Th\u00fcrer M, Silva C, Stevenson M (2014) Controlled order release: a performance assessment in job shops with sequence dependent set-up times. Prod Plan Control 25(7):603\u2013615","journal-title":"Prod Plan Control"},{"issue":"22","key":"639_CR17","doi-asserted-by":"crossref","first-page":"6664","DOI":"10.1080\/00207543.2014.907514","volume":"52","author":"M Th\u00fcrer","year":"2014","unstructured":"Th\u00fcrer M, Qu T, Stevenson M, Maschek T, Godinho Filho M (2014) Continuous workload control order release revisited: an assessment by simulation. Int J Prod Res 52(22):6664\u20136680","journal-title":"Int J Prod Res"},{"issue":"4","key":"639_CR18","doi-asserted-by":"crossref","first-page":"1151","DOI":"10.1080\/00207541003604836","volume":"49","author":"M Th\u00fcrer","year":"2011","unstructured":"Th\u00fcrer M, Silva C, Stevenson M (2011) Optimising workload norms: the influence of shop floor characteristics on setting workload norms for the workload control concept. Int J Prod Res 49(4):1151\u20131171","journal-title":"Int J Prod Res"},{"issue":"5","key":"639_CR19","doi-asserted-by":"crossref","first-page":"939","DOI":"10.1111\/j.1937-5956.2011.01307.x","volume":"21","author":"M Th\u00fcrer","year":"2012","unstructured":"Th\u00fcrer M, Stevenson M, Silva C, Land MJ, Fredendall LD (2012) workload control (wlc) and order release: a lean solution for make-to-order companies. Prod Oper Manag 21(5):939\u2013953","journal-title":"Prod Oper Manag"},{"key":"639_CR20","doi-asserted-by":"crossref","unstructured":"Th\u00fcrer M, Land MJ, Stevenson M, Fredendall LD, Godinho Filho M (2014) Concerning workload control and order release: the pre-shop pool sequencing decision. Prod Oper Manag. doi: 10.1111\/poms.12304","DOI":"10.1111\/poms.12304"},{"issue":"3","key":"639_CR21","doi-asserted-by":"crossref","first-page":"223","DOI":"10.4103\/0256-4602.98864","volume":"29","author":"H Zafar","year":"2012","unstructured":"Zafar H, Zuhairi M, Harle D, Andonovic I (2012) A review of techniques for the analysis of simulation output. IETE Technical Review 29(3):223\u2013228","journal-title":"IETE Technical Review"}],"container-title":["Production Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-015-0639-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11740-015-0639-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-015-0639-2","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,1]],"date-time":"2019-06-01T21:32:14Z","timestamp":1559424734000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11740-015-0639-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,10,5]]},"references-count":21,"journal-issue":{"issue":"5-6","published-print":{"date-parts":[[2015,12]]}},"alternative-id":["639"],"URL":"https:\/\/doi.org\/10.1007\/s11740-015-0639-2","relation":{},"ISSN":["0944-6524","1863-7353"],"issn-type":[{"value":"0944-6524","type":"print"},{"value":"1863-7353","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,10,5]]}}}