{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,6,13]],"date-time":"2024-06-13T04:40:23Z","timestamp":1718253623897},"reference-count":21,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2015,12,17]],"date-time":"2015-12-17T00:00:00Z","timestamp":1450310400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"name":"Science and Technology R & D program of Shihezi University","award":["2014ZRKXYQ06"],"award-info":[{"award-number":["2014ZRKXYQ06"]}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Prod. Eng. Res. Devel."],"published-print":{"date-parts":[[2016,4]]},"DOI":"10.1007\/s11740-015-0649-0","type":"journal-article","created":{"date-parts":[[2015,12,17]],"date-time":"2015-12-17T05:24:26Z","timestamp":1450329866000},"page":"185-196","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["A study of job shop standard setup time quota"],"prefix":"10.1007","volume":"10","author":[{"given":"Haicao","family":"Song","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Shuping","family":"Yi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Hongyu","family":"Shen","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2015,12,17]]},"reference":[{"key":"649_CR1","first-page":"62","volume":"12","author":"Z Luo","year":"2004","unstructured":"Luo Z, Wang R, Lei J (2004) A study on the assistant mechanical time quota. Mach Tool Hydraul 12:62\u201364","journal-title":"Mach Tool Hydraul"},{"issue":"8","key":"649_CR2","first-page":"1980","volume":"20","author":"X Yin","year":"2014","unstructured":"Yin X, Zhang D, Huang W (2014) Standard time study based on staff\u2019s work enthusiasm level index. Comput Integr Manuf Syst 20(8):1980\u20131986","journal-title":"Comput Integr Manuf Syst"},{"key":"649_CR3","unstructured":"Chen Y, Gu M, Wang J (2015) Method for determining standard time based on staff\u2019s knowledge level index. Comput Integr Manuf Syst. doi: 10.13196\/j.cims.2015.10.026"},{"issue":"8","key":"649_CR4","doi-asserted-by":"crossref","first-page":"2489","DOI":"10.1080\/00207543.2014.975856","volume":"53","author":"A Kach","year":"2015","unstructured":"Kach A, Azadegan A, Wagner SM (2015) The influence of different knowledge workers on innovation strategy and product development performance in small and medium-sized enterprises. Int J Prod Res 53(8):2489\u20132505","journal-title":"Int J Prod Res"},{"issue":"2","key":"649_CR5","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1509\/jmkg.64.2.1.17999","volume":"64","author":"R Sethi","year":"2000","unstructured":"Sethi R (2000) New product quality and product development teams. J Mark 64(2):1\u201314","journal-title":"J mark"},{"issue":"2\u20133","key":"649_CR6","first-page":"118","volume":"31","author":"ERAB Rodr\u00edguez","year":"2011","unstructured":"Rodr\u00edguez ERAB (2011) Team vision in product development: how knowledge strategy matters. Technovation 31(2\u20133):118\u2013127","journal-title":"Technovation"},{"issue":"2","key":"649_CR7","first-page":"259","volume":"5","author":"M Othman","year":"2012","unstructured":"Othman M, Gouw GJ, Bhuiyan N (2012) Workforce scheduling: a new model incorporating human factors. J Ind Eng Manag 5(2):259\u2013284","journal-title":"J Ind Eng Manag"},{"issue":"78","key":"649_CR8","doi-asserted-by":"crossref","first-page":"20","DOI":"10.1108\/17488840610639645","volume":"1","author":"D Harris","year":"2006","unstructured":"Harris D (2006) The influence of human factors on operational efficiency. Aircr Eng Aerosp Technol 1(78):20\u201325","journal-title":"Aircr Eng Aerosp Technol"},{"key":"649_CR9","first-page":"68","volume":"4","author":"X Yu","year":"2009","unstructured":"Yu X, Zhang Z, Tian X (2009) Method of calculation assistant mechanical time based on MOD. Mech Electr 4:68\u201370","journal-title":"Mech Electr"},{"issue":"3","key":"649_CR10","doi-asserted-by":"crossref","first-page":"1267","DOI":"10.1016\/j.apm.2011.07.068","volume":"36","author":"J Bai","year":"2012","unstructured":"Bai J, Li Z, Huang X (2012) Single-machine group scheduling with general deterioration and learning effects. Appl Math Model 36(3):1267\u20131274","journal-title":"Appl Math Model"},{"issue":"3","key":"649_CR11","doi-asserted-by":"crossref","first-page":"495","DOI":"10.1287\/opre.38.3.495","volume":"38","author":"S Browne","year":"1990","unstructured":"Browne S, Yechiali U (1990) Scheduling deteriorating jobs on a single processor. Oper Res 38(3):495\u2013498","journal-title":"Oper Res"},{"key":"649_CR12","doi-asserted-by":"crossref","first-page":"286","DOI":"10.1016\/j.amc.2014.01.168","volume":"234","author":"Y Lu","year":"2014","unstructured":"Lu Y, Wang J, Wang J (2014) Single machine group scheduling with decreasing time-dependent processing times subject to release dates. Appl Math Comput 234:286\u2013292","journal-title":"Appl Math Comput"},{"issue":"4","key":"649_CR13","doi-asserted-by":"crossref","first-page":"1259","DOI":"10.1016\/j.amc.2010.02.018","volume":"216","author":"X Zhang","year":"2010","unstructured":"Zhang X, Yan G (2010) Single-machine group scheduling problems with deteriorated and learning effect. Appl Math Comput 216(4):1259\u20131266","journal-title":"Appl Math Comput"},{"issue":"3","key":"649_CR14","doi-asserted-by":"crossref","first-page":"1045","DOI":"10.1016\/j.ejor.2006.03.066","volume":"187","author":"C Koulamas","year":"2008","unstructured":"Koulamas C, Kyparisis GJ (2008) Single-machine scheduling problems with past-sequence-dependent setup times. Eur J Oper Res 187(3):1045\u20131049","journal-title":"Eur J Oper Res"},{"key":"649_CR15","doi-asserted-by":"crossref","first-page":"226","DOI":"10.1016\/j.ins.2014.02.034","volume":"275","author":"J Wang","year":"2014","unstructured":"Wang J, Wang J (2014) Single machine group scheduling with time dependent processing times and ready times. Inf Sci 275:226\u2013231","journal-title":"Inf Sci"},{"issue":"24","key":"649_CR16","doi-asserted-by":"crossref","first-page":"7425","DOI":"10.1080\/00207543.2010.543170","volume":"49","author":"I Kwak","year":"2011","unstructured":"Kwak I, Jeong I (2011) A hierarchical approach for the capacitated lot-sizing and scheduling problem with a special structure of sequence-dependent setups. Int J Prod Res 49(24):7425\u20137439","journal-title":"Int J Prod Res"},{"key":"649_CR17","volume-title":"Longman dictionary of contemporary English","author":"M Mayor","year":"2009","unstructured":"Mayor M (2009) Longman dictionary of contemporary English. Pearson Education India, Noida"},{"key":"649_CR18","volume-title":"Knowledge management foundations: thinking about thinking-how people and organizations represent, create, and use knowledge","author":"KM Wiig","year":"1994","unstructured":"Wiig KM (1994) Knowledge management foundations: thinking about thinking-how people and organizations represent, create, and use knowledge. Schema Press, Limited, Arlington"},{"issue":"3","key":"649_CR19","doi-asserted-by":"crossref","first-page":"292","DOI":"10.1016\/j.destud.2010.10.002","volume":"32","author":"N Reed","year":"2011","unstructured":"Reed N, Scanlan J, Wills G, Halliday ST (2011) Knowledge use in an advanced manufacturing environment. Des Stud 32(3):292\u2013312","journal-title":"Des Stud"},{"key":"649_CR20","volume-title":"Intergraded evaluation method and application of enterprise knowledge and employee contribution","author":"C Le","year":"2013","unstructured":"Le C (2013) Intergraded evaluation method and application of enterprise knowledge and employee contribution. Zhejiang University, Hangzhou"},{"key":"649_CR21","first-page":"106","volume":"5","author":"H Yang","year":"2005","unstructured":"Yang H, Fu P (2005) Application of fuzzy comprehension evaluation based on entropy weight. J North China Electr Power Univ 5:106\u2013109","journal-title":"J North China Electr Power Univ"}],"container-title":["Production Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-015-0649-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11740-015-0649-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-015-0649-0","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,6,13]],"date-time":"2024-06-13T04:21:54Z","timestamp":1718252514000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11740-015-0649-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,12,17]]},"references-count":21,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2016,4]]}},"alternative-id":["649"],"URL":"https:\/\/doi.org\/10.1007\/s11740-015-0649-0","relation":{},"ISSN":["0944-6524","1863-7353"],"issn-type":[{"value":"0944-6524","type":"print"},{"value":"1863-7353","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,12,17]]}}}