{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,26]],"date-time":"2025-10-26T14:46:10Z","timestamp":1761489970270},"reference-count":25,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2016,4,13]],"date-time":"2016-04-13T00:00:00Z","timestamp":1460505600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Prod. Eng. Res. Devel."],"published-print":{"date-parts":[[2016,6]]},"DOI":"10.1007\/s11740-016-0672-9","type":"journal-article","created":{"date-parts":[[2016,4,14]],"date-time":"2016-04-14T06:58:23Z","timestamp":1460617103000},"page":"329-336","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":23,"title":["Development of bottleneck detection methods allowing for an effective fault repair prioritization in machining lines of the automobile industry"],"prefix":"10.1007","volume":"10","author":[{"given":"Michael","family":"Wedel","sequence":"first","affiliation":[]},{"given":"Philipp","family":"Noessler","sequence":"additional","affiliation":[]},{"given":"Joachim","family":"Metternich","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2016,4,13]]},"reference":[{"key":"672_CR1","doi-asserted-by":"crossref","first-page":"351","DOI":"10.1007\/s10845-007-0027-7","volume":"18","author":"Q Chang","year":"2007","unstructured":"Chang Q, Ni J, Bandyopadhyay P, Biller S, Xiao G (2007) Maintenance staffing management. J Intell Manuf 18:351\u2013360","journal-title":"J Intell Manuf"},{"key":"672_CR2","volume-title":"A revolution in manufacturing: the SMED system","author":"S Shingo","year":"1985","unstructured":"Shingo S (1985) A revolution in manufacturing: the SMED system. Productivity Inc, Portland"},{"key":"672_CR3","first-page":"341","volume":"1","author":"S Lawrence","year":"1995","unstructured":"Lawrence S, Buss AH (1995) Economic analysis of production bottlenecks. MPE 1:341\u2013363","journal-title":"Economic analysis of production bottlenecks. MPE"},{"key":"672_CR4","doi-asserted-by":"crossref","first-page":"653","DOI":"10.1115\/1.2673666","volume":"129","author":"Q Chang","year":"2007","unstructured":"Chang Q, Ni J, Bandyopadhyay P, Biller S, Xiao G (2007) Supervisory factory control based on real-time production feedback. J Manuf Sci Eng 129:653\u2013660","journal-title":"J Manuf Sci Eng"},{"key":"672_CR5","doi-asserted-by":"crossref","first-page":"442","DOI":"10.7763\/IJCCE.2014.V3.365","volume":"3","author":"K Yang","year":"2014","unstructured":"Yang K, Chung Y, Park SC (2014) Short-term bottleneck detection for process planning in a FAB. Int J Comput Commun Eng 3:442\u2013445","journal-title":"Int J Comput Commun Eng"},{"key":"672_CR6","doi-asserted-by":"crossref","unstructured":"Roser C, Nakano M, Tanaka M (2002) Shifting bottleneck detection. In: Proceedings of the 2002 winter simulation conference, pp 1079\u20131086","DOI":"10.1109\/WSC.2002.1166360"},{"key":"672_CR7","first-page":"1081","volume":"20","author":"Z Cao","year":"2012","unstructured":"Cao Z, Deng J, Liu MWY (2012) Bottleneck prediction method based on improved adaptive network-based fuzzy interference system (ANFIS) in semiconductor manufacturing system. Process Syst Eng 20:1081\u20131088","journal-title":"Process Syst Eng"},{"key":"672_CR8","first-page":"021015\u20131","volume":"133","author":"L Li","year":"2011","unstructured":"Li L, Chang Q, Xiao G, Ambani S (2011) Throughput bottleneck prediction of manufacturing systems using time series analysis. J Manuf Sci Eng 133:021015\u20131\u2013021015-8","journal-title":"J Manuf Sci Eng"},{"key":"672_CR9","volume-title":"The goal","author":"E Goldratt","year":"1986","unstructured":"Goldratt E, Cox J (1986) The goal. North River Press, Great Barrington"},{"key":"672_CR10","first-page":"17","volume":"4","author":"K Haberlandt","year":"1999","unstructured":"Haberlandt K (1999) Engpa\u00dforientierte Werkstattfertigung. PPS Manag 4:17\u201322","journal-title":"PPS Manag"},{"key":"672_CR11","volume-title":"The constraints management handbook","author":"JFI Cox","year":"1997","unstructured":"Cox JFI, Spencer MS (1997) The constraints management handbook. CRC Press, Boca Raton"},{"key":"672_CR12","doi-asserted-by":"crossref","unstructured":"Roser C, Lorentzen K, Deuse J (2014) Reliable shop floor bottleneck detection for flow lines through process and inventory observations. In: Procedia CIRP, pp 63\u201368","DOI":"10.1016\/j.procir.2014.05.020"},{"key":"672_CR13","doi-asserted-by":"crossref","unstructured":"Roser C, Nakano M, Tanaka M (2001) A practical bottleneck detection method. In: Proceedings of the 2001 winter simulation conference, pp 949\u2013953","DOI":"10.1109\/WSC.2001.977398"},{"key":"672_CR14","first-page":"233","volume":"2","author":"C-T Kuo","year":"1996","unstructured":"Kuo C-T, Lim J-T, Meerkov S (1996) Bottlenecks in serial production lines: a system-theoretic approach. MPE 2:233\u2013276","journal-title":"MPE"},{"key":"672_CR15","doi-asserted-by":"crossref","unstructured":"Li L, Chang Q, Ni J, Xiao G, Biller S (2007) Bottleneck detection of manufacturing systems using data driven method. In: International symposium on assembly and manufacturing, pp 76\u201381","DOI":"10.1109\/ISAM.2007.4288452"},{"key":"672_CR16","doi-asserted-by":"crossref","first-page":"21","DOI":"10.1111\/j.1937-5956.1994.tb00107.x","volume":"3","author":"SR Lawrence","year":"1994","unstructured":"Lawrence SR, Buss AH (1994) Shifting production bottlenecks: causes, cures, and conundrums. Prod Oper Manag 3:21\u201337","journal-title":"Prod Oper Manag"},{"key":"672_CR17","volume-title":"Factory physics","author":"WJ Hopp","year":"2011","unstructured":"Hopp WJ, Spearman ML (2011) Factory physics. Waveland Press, Long Grove"},{"key":"672_CR18","first-page":"1","volume":"54","author":"HU Guner","year":"2015","unstructured":"Guner HU, Chinnam RB, Murat A (2015) Simulation platform for anticipative plant-level maintenance decision support system. Int J Prod Res 54:1\u201319","journal-title":"Int J Prod Res"},{"key":"672_CR19","doi-asserted-by":"crossref","unstructured":"Gopalakrishnan M, Laroque C (2013) Simulation-based planning of maintenance activities in the automotive industry. In: Proceedings of the 2013 winter simulation conference, pp 2610\u20132621","DOI":"10.1109\/WSC.2013.6721633"},{"key":"672_CR20","doi-asserted-by":"crossref","first-page":"1745","DOI":"10.1080\/00207540802555769","volume":"48","author":"R Langer","year":"2010","unstructured":"Langer R, Li J, Biller S, Chang Q, Huang N, Xiao G (2010) Simulation study of a bottleneck-based dispatching policy for a maintenance workforce. Int J Prod Res 48:1745\u20131763","journal-title":"Int J Prod Res"},{"key":"672_CR21","doi-asserted-by":"crossref","first-page":"195","DOI":"10.1016\/j.ijpe.2009.05.006","volume":"121","author":"L Li","year":"2009","unstructured":"Li L, Ni J (2009) Short-term decision support system for maintenance task prioritization. Int J Prod Econ 121:195\u2013202","journal-title":"Int J Prod Econ"},{"key":"672_CR22","doi-asserted-by":"crossref","unstructured":"Gopalakrishnan M, Laroque C (2014) Simulation-based planning of maintenance activities by a shifting priority method. In: Proceedings of the 2014 winter simulation conference, pp 2168\u20132179","DOI":"10.1109\/WSC.2014.7020061"},{"key":"672_CR23","doi-asserted-by":"crossref","first-page":"15","DOI":"10.1016\/S0007-8506(07)61456-5","volume":"51","author":"H-P Wiendahl","year":"2002","unstructured":"Wiendahl H-P, Hegenscheidt M (2002) Bottleneck analysis of assembly lines with characteristic curves. CIRP Ann Manuf Technol 51:15\u201319","journal-title":"CIRP Ann Manuf Technol"},{"key":"672_CR24","volume-title":"Introduction to TPM","author":"S Nakajima","year":"1988","unstructured":"Nakajima S (1988) Introduction to TPM. Productivity Press, Cambridge"},{"key":"672_CR25","doi-asserted-by":"crossref","first-page":"1135","DOI":"10.1007\/s00170-012-4395-6","volume":"66","author":"S Lee","year":"2013","unstructured":"Lee S, Ni J (2013) Joint decision making for maintenance and production scheduling of production systems. Int J Adv Manuf Technol 66:1135\u20131146","journal-title":"Int J Adv Manuf Technol"}],"container-title":["Production Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-016-0672-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11740-016-0672-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-016-0672-9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,9,6]],"date-time":"2019-09-06T13:38:36Z","timestamp":1567777116000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11740-016-0672-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,4,13]]},"references-count":25,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2016,6]]}},"alternative-id":["672"],"URL":"https:\/\/doi.org\/10.1007\/s11740-016-0672-9","relation":{},"ISSN":["0944-6524","1863-7353"],"issn-type":[{"value":"0944-6524","type":"print"},{"value":"1863-7353","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,4,13]]}}}