{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,28]],"date-time":"2026-04-28T14:45:27Z","timestamp":1777387527094,"version":"3.51.4"},"reference-count":14,"publisher":"Springer Science and Business Media LLC","issue":"4-5","license":[{"start":{"date-parts":[[2016,8,26]],"date-time":"2016-08-26T00:00:00Z","timestamp":1472169600000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100001659","name":"Deutsche Forschungsgemeinschaft","doi-asserted-by":"publisher","award":["DE 447\/131-1"],"award-info":[{"award-number":["DE 447\/131-1"]}],"id":[{"id":"10.13039\/501100001659","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Prod. Eng. Res. Devel."],"published-print":{"date-parts":[[2016,10]]},"DOI":"10.1007\/s11740-016-0693-4","type":"journal-article","created":{"date-parts":[[2016,8,26]],"date-time":"2016-08-26T05:35:07Z","timestamp":1472189707000},"page":"489-496","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":11,"title":["Simulation-based planning and evaluation of personnel scheduling in knowledge-intensive production systems"],"prefix":"10.1007","volume":"10","author":[{"given":"B.","family":"Denkena","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"M. A.","family":"Dittrich","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-0697-7616","authenticated-orcid":false,"given":"F.","family":"Winter","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"C.","family":"Wagener","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2016,8,26]]},"reference":[{"issue":"1","key":"693_CR1","doi-asserted-by":"crossref","first-page":"481","DOI":"10.1016\/j.cirp.2011.03.044","volume":"60","author":"W Mayrhofer","year":"2011","unstructured":"Mayrhofer W, M\u00e4rz L, Sihn W (2011) Planning assistance for pearl chain forecasts and personnel assignment planning of sequenced assembly lines. CIRP Ann Manuf Technol 60(1):481\u2013484","journal-title":"CIRP Ann Manuf Technol"},{"issue":"1","key":"693_CR2","doi-asserted-by":"crossref","first-page":"437","DOI":"10.1016\/j.cirp.2011.03.046","volume":"60","author":"T AlGeddawy","year":"2011","unstructured":"AlGeddawy T, ElMaraghy H (2011) Manufacturing systems synthesis using knowledge discovery. CIRP Ann Manuf Technol 60(1):437\u2013440","journal-title":"CIRP Ann Manuf Technol"},{"issue":"1","key":"693_CR3","first-page":"1","volume":"6","author":"G Warnecke","year":"1999","unstructured":"Warnecke G, Eichgr\u00fcn K, Kluge R, Zitt U (1999) Improvement of process reliability within process chains by comprehensive control strategies. Prod Eng Res Dev 6(1):1\u20136","journal-title":"Prod Eng Res Dev"},{"key":"693_CR4","volume-title":"Towards a competent workforce","author":"B Mansfield","year":"1996","unstructured":"Mansfield B, Mitchell L (1996) Towards a competent workforce. Gower Publishing Limited, Hampshire"},{"key":"693_CR5","doi-asserted-by":"crossref","first-page":"443","DOI":"10.1348\/096317900167155","volume":"73","author":"R Randall","year":"2000","unstructured":"Randall R, Ferguson E, Patterson F (2000) Self-assessment accuracy and assessment centre decisions. J Occup Organ Psychol 73:443\u2013459","journal-title":"J Occup Organ Psychol"},{"key":"693_CR6","unstructured":"Witzgall E (2010) How does Competence measurement with cm prowork relate to the european qualification framework? Considerations and practical experiences with regard to worker competencies. Professional Training Facts, Dortmund, pp 1\u201311. http:\/\/www.cmprowork.eu\/wp-content\/uploads\/2011\/01\/ptf2010-gesamt.pdf , Accessed 6 June 2016"},{"issue":"2","key":"693_CR7","doi-asserted-by":"crossref","first-page":"299","DOI":"10.1007\/s11740-013-0453-7","volume":"7","author":"B Denkena","year":"2013","unstructured":"Denkena B, Charlin F, Merwart M (2013) Competence-based process planning for the workshop production. Prod Eng Res Dev 7(2):299\u2013308","journal-title":"Prod Eng Res Dev"},{"key":"693_CR8","volume-title":"Memory and forgetting. Routledge modular psychology series","author":"J Henderson","year":"1999","unstructured":"Henderson J (1999) Memory and forgetting. Routledge modular psychology series. Routledge, London"},{"key":"693_CR9","volume-title":"Kleines psychologisches W\u00f6rterbuch","author":"C Michel","year":"1990","unstructured":"Michel C, Novak F (1990) Kleines psychologisches W\u00f6rterbuch. Herder, Freiburg"},{"issue":"4","key":"693_CR10","doi-asserted-by":"crossref","first-page":"122","DOI":"10.2514\/8.155","volume":"3","author":"TP Wright","year":"1936","unstructured":"Wright TP (1936) Factors affecting the cost of airplanes. J Aeronaut Sci 3(4):122\u2013128","journal-title":"J Aeronaut Sci"},{"key":"693_CR11","volume-title":"Fertigkeit, St\u00fcckzahl und ben\u00f6tigte Zeit. REFA-Nachrichten","author":"JR Jong de","year":"1955","unstructured":"de Jong JR (1955) Fertigkeit, St\u00fcckzahl und ben\u00f6tigte Zeit. REFA-Nachrichten. Beuth, Berlin"},{"key":"693_CR12","doi-asserted-by":"crossref","first-page":"B-136","DOI":"10.1287\/mnsc.11.6.B136","volume":"11","author":"FK Levy","year":"1965","unstructured":"Levy FK (1965) Adaptation in the production process. Manag Sci 11:136\u2013154","journal-title":"Manag Sci"},{"key":"693_CR13","unstructured":"Ullrich G (1995) Wirtschaftliches Anlernen in der Serienmontage\u2014Ein Beitrag zur Lernkurventheorie. Dr.- Ing. Dissertation, RWTH Aachen"},{"key":"693_CR14","unstructured":"Greiff M de (2001) Die Prognose von Lernkurven in der manuellen Montage unter besonderer Ber\u00fccksichtigung der Lernkurven von Grundbewegungen. Dr.- Ing. Dissertation, Universit\u00e4t Duisburg"}],"container-title":["Production Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-016-0693-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11740-016-0693-4\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-016-0693-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,24]],"date-time":"2017-06-24T17:26:53Z","timestamp":1498325213000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11740-016-0693-4"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,8,26]]},"references-count":14,"journal-issue":{"issue":"4-5","published-print":{"date-parts":[[2016,10]]}},"alternative-id":["693"],"URL":"https:\/\/doi.org\/10.1007\/s11740-016-0693-4","relation":{},"ISSN":["0944-6524","1863-7353"],"issn-type":[{"value":"0944-6524","type":"print"},{"value":"1863-7353","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,8,26]]}}}