{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,1]],"date-time":"2026-05-01T03:10:44Z","timestamp":1777605044881,"version":"3.51.4"},"reference-count":48,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2017,1,28]],"date-time":"2017-01-28T00:00:00Z","timestamp":1485561600000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Prod. Eng. Res. Devel."],"published-print":{"date-parts":[[2017,2]]},"DOI":"10.1007\/s11740-017-0713-z","type":"journal-article","created":{"date-parts":[[2017,1,28]],"date-time":"2017-01-28T18:05:27Z","timestamp":1485626727000},"page":"51-60","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":4,"title":["Cycle management of manufacturing resources: identification and prioritization of investment needs"],"prefix":"10.1007","volume":"11","author":[{"given":"Alexander","family":"Sch\u00f6nmann","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Christian","family":"Dengler","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Carsten","family":"Intra","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Gunther","family":"Reinhart","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Boris","family":"Lohmann","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2017,1,28]]},"reference":[{"key":"713_CR1","doi-asserted-by":"publisher","first-page":"680","DOI":"10.1016\/j.procir.2014.02.026","volume":"17","author":"G Schuh","year":"2014","unstructured":"Schuh G, Graw M, Sch\u00f6n N (2014) Exploitation-oriented manufacturing technology development. Proc CIRP 17:680\u2013685. doi: 10.1016\/j.procir.2014.02.026","journal-title":"Proc CIRP"},{"issue":"5","key":"713_CR2","doi-asserted-by":"publisher","first-page":"669","DOI":"10.1007\/s11740-014-0572-9","volume":"8","author":"F Klocke","year":"2014","unstructured":"Klocke F, Buchholz S, Stauder J (2014) Technology chain optimization: a systematic approach considering the manufacturing history. Prod Eng Res Dev 8(5):669\u2013678. doi: 10.1007\/s11740-014-0572-9","journal-title":"Prod Eng Res Dev"},{"key":"713_CR3","doi-asserted-by":"crossref","first-page":"391","DOI":"10.1007\/978-3-642-23860-4_64","volume-title":"Enabling manufacturing competitiveness and economic sustainability","author":"G Reinhart","year":"2012","unstructured":"Reinhart G, Schindler S (2012) Strategic evaluation of technology chains for producing companies. In: Elmaraghy HA (ed) Enabling manufacturing competitiveness and economic sustainability. Springer, Berlin, pp 391\u2013396"},{"issue":"6","key":"713_CR4","first-page":"920","volume":"71","author":"G Reinhart","year":"2010","unstructured":"Reinhart G, Schindler S (2010) A strategic evaluation approach for defining the maturity of manufacturing technologies. World Acad Sci Eng Technol 71(6):920\u2013925","journal-title":"World Acad Sci Eng Technol"},{"key":"713_CR5","unstructured":"DIN 8580 (2003) Fertigungsverfahren-Begriffe, Einteilung. Beuth, Berlin"},{"key":"713_CR6","unstructured":"Z\u00e4h MF, Reinhart G, Pohl J, Schindler S, Karl F, Rimpau C (2009) Modelling, anticipating and managing cyclic behaviour in industry. In: Z\u00e4h MF (ed) 3rd international conference on changeable, agile, reconfigurable and virtual production (CARV 2009). Utz, M\u00fcnchen, pp 16\u201343"},{"issue":"4","key":"713_CR7","doi-asserted-by":"publisher","first-page":"309","DOI":"10.1007\/s11740-010-0254-1","volume":"4","author":"MF Zaeh","year":"2010","unstructured":"Zaeh MF, Reinhart G, Karl F, Schindler S, Pohl J, Rimpau C (2010) Cyclic influences within the production resource planning process. Prod Eng Res Dev 4(4):309\u2013317. doi: 10.1007\/s11740-010-0254-1","journal-title":"Prod Eng Res Dev"},{"key":"713_CR8","doi-asserted-by":"publisher","unstructured":"Koch J, Plehn C, Reinhart G, Z\u00e4h MF (2014) Cycle management for continuous manufacturing planning. In: Zaeh MF (ed) Enabling manufacturing competitiveness and economic sustainability. Springer International Publishing, Cham, pp 9\u201312. doi: 10.1007\/978-3-319-02054-9_2","DOI":"10.1007\/978-3-319-02054-9_2"},{"key":"713_CR9","doi-asserted-by":"publisher","first-page":"198","DOI":"10.1016\/j.procir.2016.08.011","volume":"52","author":"A Sch\u00f6nmann","year":"2016","unstructured":"Sch\u00f6nmann A, Greitemann J, Reinhart G (2016) Proactive management of production technologies: a conceptual framework. Proc CIRP 52:198\u2013203. doi: 10.1016\/j.procir.2016.08.011","journal-title":"Proc CIRP"},{"issue":"3","key":"713_CR10","doi-asserted-by":"publisher","first-page":"127","DOI":"10.1049\/em:20010309","volume":"11","author":"F Khan","year":"2001","unstructured":"Khan F (2001) Equipment reliability: a life-cycle approach. Eng Manag J 11(3):127. doi: 10.1049\/em:20010309","journal-title":"Eng Manag J"},{"issue":"1","key":"713_CR11","doi-asserted-by":"publisher","first-page":"227","DOI":"10.1016\/j.ijpe.2013.07.002","volume":"146","author":"K El-Akruti","year":"2013","unstructured":"El-Akruti K, Dwight R, Zhang T (2013) The strategic role of engineering asset management. Int J Prod Econ 146(1):227\u2013239. doi: 10.1016\/j.ijpe.2013.07.002","journal-title":"Int J Prod Econ"},{"issue":"3","key":"713_CR12","doi-asserted-by":"publisher","first-page":"417","DOI":"10.1007\/s11740-015-0617-8","volume":"9","author":"J Greitemann","year":"2015","unstructured":"Greitemann J, Stahl B, Sch\u00f6nmann A, Lohmann B, Reinhart G (2015) Strategic production technology planning using a dynamic technology chain calendar. Prod Eng Res Dev 9(3):417\u2013424. doi: 10.1007\/s11740-015-0617-8","journal-title":"Prod Eng Res Dev"},{"issue":"1\u20132","key":"713_CR13","doi-asserted-by":"publisher","first-page":"5","DOI":"10.1016\/S0040-1625(03)00072-6","volume":"71","author":"R Phaal","year":"2004","unstructured":"Phaal R, Farrukh CJ, Probert DR (2004) Technology roadmapping\u2014a planning framework for evolution and revolution. Technol Forecast Soc Change 71(1\u20132):5\u201326. doi: 10.1016\/S0040-1625(03)00072-6","journal-title":"Technol Forecast Soc Change"},{"key":"713_CR14","unstructured":"Heeschen D (2015) Kennzahlenbasierte Auswahl der Fertigungstechnologien und -ressourcen im industriellen Werkzeugbau. Doctoral dissertation RWTH Aachen, Apprimus, Aachen"},{"issue":"6","key":"713_CR15","doi-asserted-by":"crossref","first-page":"411","DOI":"10.1016\/S0736-5845(00)00024-7","volume":"16","author":"F Klocke","year":"2000","unstructured":"Klocke F, Fallb\u00f6hmer M, Kopner A, Trommer G (2000) Methods and tools supporting modular process design. Robotics Comput Integr Manuf 16(6):411\u2013423","journal-title":"Robotics Comput Integr Manuf"},{"issue":"6","key":"713_CR16","doi-asserted-by":"publisher","first-page":"657","DOI":"10.1007\/s11740-013-0490-2","volume":"7","author":"D Biermann","year":"2013","unstructured":"Biermann D, Gausemeier J, Hess S, Petersen M, Wagner T (2013) Planning and optimisation of manufacturing process chains for functionally graded components\u2013part 1: methodological foundations. Prod Eng Res Dev 7(6):657\u2013664. doi: 10.1007\/s11740-013-0490-2","journal-title":"Prod Eng Res Dev"},{"issue":"1","key":"713_CR17","doi-asserted-by":"publisher","first-page":"109","DOI":"10.1007\/s11740-014-0590-7","volume":"9","author":"F Klocke","year":"2015","unstructured":"Klocke F, Arntz K, Heeschen D (2015) Integrative technology chain design for small scale manufacturers. Prod Eng Res Dev 9(1):109\u2013117. doi: 10.1007\/s11740-014-0590-7","journal-title":"Prod Eng Res Dev"},{"issue":"3","key":"713_CR18","doi-asserted-by":"publisher","first-page":"229","DOI":"10.1016\/0951-8320(95)00076-3","volume":"51","author":"R Dekker","year":"1996","unstructured":"Dekker R (1996) Applications of maintenance optimization models: a review and analysis. Reliab Eng Syst Saf 51(3):229\u2013240. doi: 10.1016\/0951-8320(95)00076-3","journal-title":"Reliab Eng Syst Saf"},{"issue":"2","key":"713_CR19","doi-asserted-by":"publisher","first-page":"532","DOI":"10.1016\/j.ejor.2003.07.001","volume":"160","author":"PT Chang","year":"2005","unstructured":"Chang PT (2005) Fuzzy strategic replacement analysis. Eur J Oper Res 160(2):532\u2013559. doi: 10.1016\/j.ejor.2003.07.001","journal-title":"Eur J Oper Res"},{"issue":"1","key":"713_CR20","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ejor.2010.11.018","volume":"213","author":"XS Si","year":"2011","unstructured":"Si XS, Wang W, Hu CH, Zhou DH (2011) Remaining useful life estimation\u2014a review on the statistical data driven approaches. Eur J Oper Res 213(1):1\u201314. doi: 10.1016\/j.ejor.2010.11.018","journal-title":"Eur J Oper Res"},{"issue":"3","key":"713_CR21","doi-asserted-by":"publisher","first-page":"724","DOI":"10.1016\/j.ymssp.2008.06.009","volume":"23","author":"A Heng","year":"2009","unstructured":"Heng A, Zhang S, Tan AC, Mathew J (2009) Rotating machinery prognostics: state of the art, challenges and opportunities. Mech Syst Signal Process 23(3):724\u2013739. doi: 10.1016\/j.ymssp.2008.06.009","journal-title":"Mech Syst Signal Process"},{"issue":"7","key":"713_CR22","doi-asserted-by":"publisher","first-page":"1483","DOI":"10.1016\/j.ymssp.2005.09.012","volume":"20","author":"AK Jardine","year":"2006","unstructured":"Jardine AK, Lin D, Banjevic D (2006) A review on machinery diagnostics and prognostics implementing condition-based maintenance. Mech Syst Signal Process 20(7):1483\u20131510. doi: 10.1016\/j.ymssp.2005.09.012","journal-title":"Mech Syst Signal Process"},{"key":"713_CR23","unstructured":"Balzer G, Drescher D, Meister R, Heil F, Kirschek P, Neumann C (2004) Evaluation of failure data of hv\u00a0circuit-breakers for condition based maintenance. In: Proceedings of CIGRE (A3-305)"},{"key":"713_CR24","volume-title":"Zuverl\u00e4ssigkeit im Fahrzeug- und Maschinenbau: Ermittlung von Bauteil- und System-Zuverl\u00e4ssigkeiten. VDI","author":"B Bertsche","year":"2004","unstructured":"Bertsche B, Lechner G (2004) Zuverl\u00e4ssigkeit im Fahrzeug- und Maschinenbau: Ermittlung von Bauteil- und System-Zuverl\u00e4ssigkeiten. VDI. Springer, Berlin"},{"key":"713_CR25","volume-title":"Reliability-centered maintenance","author":"J Moubray","year":"1997","unstructured":"Moubray J (1997) Reliability-centered maintenance, 2nd edn. Industrial Press, New York","edition":"2"},{"issue":"1","key":"713_CR26","first-page":"35","volume":"60","author":"AM Smith","year":"2006","unstructured":"Smith AM, Hinchcliffe GR (2006) Beware of the fallacy of the bathtub curve. Plant Eng 60(1):35\u201337","journal-title":"Plant Eng"},{"key":"713_CR27","volume-title":"Reliability, maintainability and risk: practical methods for engineers including reliability centred maintenance and safety-related systems","author":"DJ Smith","year":"2011","unstructured":"Smith DJ (2011) Reliability, maintainability and risk: practical methods for engineers including reliability centred maintenance and safety-related systems. Elsevier Science, Burlington"},{"key":"713_CR28","doi-asserted-by":"publisher","unstructured":"Haan BD (2008) A simple classification approach to build a bathtub. In: Annual reliability and maintainability symposium, pp 206\u2013211. doi: 10.1109\/RAMS.2008.4925796","DOI":"10.1109\/RAMS.2008.4925796"},{"key":"713_CR29","unstructured":"Pohl J (2014) Adaption von Produktionsstrukturen unter Ber\u00fccksichtigung von Lebenszyklen. Doctoral dissertation Technical University of Munich, Utz, M\u00fcnchen"},{"key":"713_CR30","doi-asserted-by":"crossref","first-page":"608","DOI":"10.1016\/j.procir.2012.07.104","volume":"3","author":"F Karl","year":"2012","unstructured":"Karl F, Reinhart G, Zaeh MF (2012) Strategic planning of reconfigurations on manufacturing resources. Proc CIRP 3:608\u2013613","journal-title":"Proc CIRP"},{"issue":"3\u20134","key":"713_CR31","doi-asserted-by":"publisher","first-page":"333","DOI":"10.1016\/S0149-1970(99)00021-9","volume":"35","author":"PF Frutuoso e Melo","year":"1999","unstructured":"Frutuoso e Melo PF, Alvim A, Noriega HC, Nunes ME, Oliveira EA, Simone EA, Saldanha PL (1999) On probability models for the unavailability analysis of safety systems under aging phenomena. Nuclear Energy 35(3\u20134):333\u2013366. doi: 10.1016\/S0149-1970(99)00021-9","journal-title":"Nuclear Energy"},{"issue":"3","key":"713_CR32","doi-asserted-by":"crossref","first-page":"167","DOI":"10.1002\/(SICI)1099-1638(199805\/06)14:3<167::AID-QRE154>3.0.CO;2-L","volume":"14","author":"HS Blanks","year":"1998","unstructured":"Blanks HS (1998) The challenge of quantitative reliability. Qual Reliab Eng Int 14(3):167\u2013176","journal-title":"Qual Reliab Eng Int"},{"issue":"3","key":"713_CR33","doi-asserted-by":"publisher","first-page":"338","DOI":"10.1016\/s0019-9958(65)90241-x","volume":"8","author":"L Zadeh","year":"1965","unstructured":"Zadeh L (1965) Fuzzy sets. Inf Control 8(3):338\u2013353. doi: 10.1016\/s0019-9958(65)90241-x","journal-title":"Inf Control"},{"issue":"1","key":"713_CR34","doi-asserted-by":"publisher","first-page":"21","DOI":"10.1016\/0165-0114(92)90032-y","volume":"52","author":"H Ishibuchi","year":"1992","unstructured":"Ishibuchi H, Nozaki K, Tanaka H (1992) Distributed representation of fuzzy rules and its application to pattern classification. Fuzzy Sets Syst 52(1):21\u201332. doi: 10.1016\/0165-0114(92)90032-y","journal-title":"Fuzzy Sets Syst"},{"issue":"2","key":"713_CR35","doi-asserted-by":"publisher","first-page":"419","DOI":"10.1109\/21.52552","volume":"20","author":"C Lee","year":"1990","unstructured":"Lee C (1990) Fuzzy logic in control systems: fuzzy logic controller. II. IEEE Trans Syst Man Cybern 20(2):419\u2013435. doi: 10.1109\/21.52552","journal-title":"IEEE Trans Syst Man Cybern"},{"key":"713_CR36","doi-asserted-by":"crossref","unstructured":"Kruse R, Borgelt C, Klawonn F, Moewes C, Ru\u00df G, Steinbrecher M (2011) Computational Intelligence, Eine methodische Einf\u00fchrung in K\u00fcnstliche Neuronale Netze, Evolution\u00e4re Algorithmen. Fuzzy-Systeme und Bayes-Netze. Vieweg + Teubner, Wiesbaden","DOI":"10.1007\/978-3-8348-8299-8_2"},{"issue":"2","key":"713_CR37","doi-asserted-by":"publisher","first-page":"156","DOI":"10.1108\/IJQRM-11-2012-0151","volume":"32","author":"EM Assis","year":"2015","unstructured":"Assis EM, Borges EP, de Melo Vieira, Silvio AB, Schnitman L (2015) Modeling failure rate of a robotic welding station using generalized q-distributions. Int J Qual Reliab Manag 32(2):156\u2013166. doi: 10.1108\/IJQRM-11-2012-0151","journal-title":"Int J Qual Reliab Manag"},{"issue":"1","key":"713_CR38","doi-asserted-by":"publisher","first-page":"121","DOI":"10.1016\/0951-8320(95)00070-I","volume":"50","author":"J Yazhou","year":"1995","unstructured":"Yazhou J, Molin W, Zhixin J (1995) Probability distribution of machining center failures. Reliab Eng Syst Saf 50(1):121\u2013125. doi: 10.1016\/0951-8320(95)00070-I","journal-title":"Reliab Eng Syst Saf"},{"issue":"1","key":"713_CR39","doi-asserted-by":"publisher","first-page":"91","DOI":"10.1016\/S0951-8320(00)00100-9","volume":"72","author":"Y Wang","year":"2001","unstructured":"Wang Y, Jia Y, Jiang W (2001) Early failure analysis of machining centers: a case study. Reliab Eng Syst Saf 72(1):91\u201397. doi: 10.1016\/S0951-8320(00)00100-9","journal-title":"Reliab Eng Syst Saf"},{"issue":"11","key":"713_CR40","doi-asserted-by":"publisher","first-page":"1277","DOI":"10.1016\/j.aml.2003.12.007","volume":"17","author":"ME Ghitany","year":"2004","unstructured":"Ghitany ME (2004) The monotonicity of the reliabilitymeasures of the beta distribution. Appl Math Lett 17(11):1277\u20131283. doi: 10.1016\/j.aml.2003.12.007","journal-title":"Appl Math Lett"},{"key":"713_CR41","doi-asserted-by":"publisher","first-page":"259","DOI":"10.1016\/j.techfore.2016.01.014","volume":"104","author":"Y Jeong","year":"2016","unstructured":"Jeong Y, Park I, Yoon B (2016) Forecasting technology substitution based on hazard function. Technol Forecast Soc Change 104:259\u2013272. doi: 10.1016\/j.techfore.2016.01.014","journal-title":"Technol Forecast Soc Change"},{"key":"713_CR42","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-319-17704-5","volume-title":"Introduction to statistics","author":"W H\u00e4rdle","year":"2015","unstructured":"H\u00e4rdle W, Klinke S, R\u00f6nz B (2015) Introduction to statistics. Springer, Cham"},{"key":"713_CR43","volume-title":"Graphical methods for data analysis","author":"JM Chambers","year":"1983","unstructured":"Chambers JM (1983) Graphical methods for data analysis. Wadsworth International Group and Duxbury Press, Belmont"},{"issue":"253","key":"713_CR44","doi-asserted-by":"publisher","first-page":"68","DOI":"10.2307\/2280095","volume":"46","author":"FJ Massey","year":"1951","unstructured":"Massey FJ (1951) The Kolmogorov\u2013Smirnov test for goodness of fit. J Am Stat Assoc 46(253):68. doi: 10.2307\/2280095","journal-title":"J Am Stat Assoc"},{"key":"713_CR45","volume-title":"Statistical methods","author":"GW Snedecor","year":"1989","unstructured":"Snedecor GW, Cochran WG (1989) Statistical methods. The Iowa State University Press, Ames"},{"key":"713_CR46","doi-asserted-by":"publisher","unstructured":"Lai CD (2014) Weibull distribution. In: Lai CD (ed) Generalized Weibull distributions, Springer Briefs in Statistics. Springer, Berlin, pp 1\u201321. doi: 10.1007\/978-3-642-39106-4_1","DOI":"10.1007\/978-3-642-39106-4_1"},{"key":"713_CR47","doi-asserted-by":"crossref","first-page":"23","DOI":"10.1007\/978-3-642-03949-2_2","volume-title":"Instandhaltung technischer Systeme","author":"F Ryll","year":"2010","unstructured":"Ryll F, Freund C (2010) Grundlagen der instandhaltung. In: Schenk M (ed) Instandhaltung technischer Systeme. Springer, Heidelberg, pp 23\u2013101"},{"key":"713_CR48","unstructured":"Biedermann H (1990) Anlagenmanagement. T\u00dcV Rheinland, K\u00f6ln, Schriftenreihe Erfolgspotentiale f\u00fcr Unternehmer und F\u00fchrungskr\u00e4fte, Verl"}],"container-title":["Production Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-017-0713-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11740-017-0713-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-017-0713-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,9,18]],"date-time":"2019-09-18T02:28:18Z","timestamp":1568773698000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11740-017-0713-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,1,28]]},"references-count":48,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2017,2]]}},"alternative-id":["713"],"URL":"https:\/\/doi.org\/10.1007\/s11740-017-0713-z","relation":{},"ISSN":["0944-6524","1863-7353"],"issn-type":[{"value":"0944-6524","type":"print"},{"value":"1863-7353","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,1,28]]}}}